My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 004513 • <br /> I <br /> BIDDER'S QUALIFICATIONS STATEMENT <br /> IPROJECT NAME: Rotary Park Renovation <br /> BIDDER NAP 4E: SP-eGt -i"t� t ti �.�W/ Mte µ ,& . .-Ceyit,�, <br /> IDATE: 1 ` 2 ( <br /> I <br /> ADDRESS:1)'..0 &a, 4'iS TELEPHONE:?]6 - @0( 10 <br /> IA-4. 'Z7 <br /> E-MAIL ADDRESS: j P1 L t.t) . <br /> IINSTRUCTIONS <br /> A. The Bidder must document that the Bidder meets the Supplemental Responsibility Criteria in <br /> the Instructions to Bidders. <br /> QUESTIONS ' <br /> I <br /> 1. Waterway and Marine Subcontractor. <br /> The Instructions to Bidders states: <br /> I The Subcontractor listed in Part B of Section 004336 (Proposed Subcontractors <br /> Form)as the Waterway and Marine Subcontractor must satisfy both of the following <br /> requirements: <br /> I (1) For at least the five (5) years prior to Bid opening, the Waterway and <br /> Marine Subcontractor must have been in the business of actively and <br /> I directly constructing float system projects complying with all permit <br /> conditions with its own forces. <br /> I (2) Within the two (2)years prior to Bid opening,the Waterway and Marine <br /> Subcontractor must have successfully completed with its own forces the <br /> float system installation portion of at least two (2) float system <br /> Iinstallations of 100 LF or larger. <br /> If Bidder listed itself as the Waterway and Marine Subcontractor, then Bidder itself <br /> 111 must satisfy both of the above requirements with its own forces. <br /> 111 <br /> 004513.1 <br /> IIProvided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Seal <br />
The URL can be used to link to this page
Your browser does not support the video tag.