My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> 1 \ .f <br /> ,� SEI/Neptune General Contractors <br /> N?o �► <br /> IE <br /> P � PO Box 495, Anacortes WA 98221 EN <br /> T t Shop/Office 12707 Quantum Lane Bldg. #4 <br /> 1 UJ <br /> N W 360-661-7990 Jay - jay@seipnw.com <br /> E <br /> I <br /> WAGC- NEPTUGC811DQ <br /> 1 SEI/Neptune Projects <br /> I <br /> Lake Cavanaugh Projects 2021 <br /> • Project Scope: Multiple dock and pier projects for residential clients. <br /> I <br /> • Jeff and Jean Miller-85 x 6 pier and 16 x 20 float- <br /> • Shannon and Tyra O'Kelley-98 x 6 pier and a 10 x 12 sun dock <br /> • Kent Curtis-85 x 6 pier retrofit and 1-6x 20 float, 1- 12x 12 float <br /> I <br /> • John Santuchi-32 x 8 float <br /> • General Contractor-Neptune General Contractors <br /> • Contract Amounts$337,970.00 <br /> • %of Contract Completed by SEI/NGC: 100% <br /> 1 • Contract start Date:6/25/21 <br /> • Completion Date:9/30/21 <br /> I <br /> City of Mercer Island, East Mercer Way Landslide Repairs <br /> • Project Scope: Cleanup of the existing slide area, installation of a new soldier pile wall, <br /> I <br /> backfill, Guardrail, and site restoration. <br /> • City of Mercer Island—Clint Morris-206-999-8041 <br /> • General Contractor-Neptune General Contractors <br /> • Contract Amount$233,266.00 <br /> I <br /> • %of Contract Completed by SEI/NGC: 100% <br /> • Contract start Date:6/2/21 <br /> • Completion Date:6/25/21 <br /> IBrandts Landing Surge Gate and Piling Removal and Installation <br /> • Project Scope: Total removal of the existing Surge gate structures and reinstallation of <br /> I 200 If of AZ19-700 sheet piling, and 7 12 dia. steel piling at the Brandts Landing Marina, <br /> Orcas Island WA <br /> • Brandts Landing-Cheryl Brandt-206-499-1795 <br /> I • General Contractor-Neptune General Contractors <br /> • Contract Amount$315.723.00 <br /> • Contract start Date:2/22/21 <br /> • Completion Date:4/15/21 <br /> ll <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.