1 <br /> Washington State Dept.of Natural Resources,Whalen Creek Project <br /> 1 <br /> • Project Scope: Construction of a fish passage by removing an existing culvert, 3800 cy of <br /> fill and installing new sheet pile abutments, bridge abutments and new bridge, that are <br /> 1 supplied by the owner. <br /> • DNR-Sandra Swenson-360-902-1200 <br /> • General Contractor- Neptune General Contractors <br /> 1 • Contract Amount$193,000.00 <br /> • % of Contract Completed by SEI/NGC: 100% <br /> • Contract start Date:6/19 <br /> • Completion Date:9/19 <br /> Personal References for Jay Tomasko on Quilceda Projects <br /> 1 Northwest Straights Foundation!QEI Langley Barge Removal Project <br /> 1 • Project Scope: Derelict barge removal and restoration of the beach at the Seahorse <br /> Siesta Beach Association access in Langley WA <br /> • Quilceda Excavation-Mark Verbarendse 425-754-4969 <br /> 1 • General Contractor-Quilceda Excavation <br /> • Contract Amount$750,000.00 <br /> • Contract start Date:10/20 <br /> 1 • Completion Date:2/21 <br /> WDFW I QEI Lake Campbell Boat Ramp Project <br /> 1 <br /> • Project Scope: Remove and replace the existing boat ramp with new ramp, docks, piling and parking areas <br /> p 9 <br /> • Quilceda Excavation- Mark Verbarendse 425-754-4969 <br /> • General Contractor-Quilceda Excavation <br /> • Contract Amount$750,000.00 <br /> • Neptune float contract: $105,640.00 <br /> • Contract start Date:7/20 <br /> • Completion Date:10/20 <br /> Tulalip Tribes!QEI Tulalip Justice Center Storm Retrofit <br /> • Project Scope: Removal and replacement of the main storm discharge manhole with <br /> sheet pile shoring and replacement of 500 If of various storm piping. <br /> • Quilceda Excavation-Mark Verbarendse 425-754-4969 <br /> • General Contractor-Quilceda Excavation <br /> • Contract Amount$350,000.00 <br /> • Contract start Date:6/20 <br /> I • Completion Date:8/20 <br /> 111 <br />