My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> 1 <br /> ' City of Tacoma Parks and Rec. Lake Wapato Dock Replacement <br /> • Project Scope: Complete removal of the existing South and East dock and replacement <br /> with new piling, pier structures, floats, sidewalks, shoreline restoration and landscaping <br /> • Tacoma Parks-Kristi Evans 253-305-1054 <br /> City of Oak Harbor-F Dock Breakwater Repairs <br /> • Project Scope: Replacement of misc. dock components on the F dock breakwater in the <br /> Oak Harbor Marina. <br /> • City of Oak Harbor-Alex Warner PE 360-279-4527 <br /> Port of Everett-South Terminal Bulkhead Renovation <br /> ' • Project Scope: Reconstruction of the South Terminal Bulkhead including placement of <br /> rock, installation of 7 piling and deck replacement. <br /> • POE-Steve Hagar-425-259-3164 <br /> ' Lagoon Point Community Association-Seashore Ave Bridge Replacement <br /> Project Scope: Complete removal and construction of the new 40'x 24'concrete vehicle <br /> ' bridge with 28-8" dia. piling, 2 cast in place concrete abutments,6 precast bridge panels, <br /> 1600 sf of Redi-Rock walls, 800 tons of fill, aluminum hand railings, shoreline restoration and <br /> landscaping. <br /> • LPCA-Duane Rawson, Jay Kidder 360-678-4747 <br /> ' USCG Station Seattle!Bergerson Construction-Major Out of Water Repairs Piers 36137 <br /> • Project Scope: Pier concrete spall repairs, fender pile spell repairs, under deck spell <br /> repairs, floating dock spall repairs, floating fender repairs, 37 under pier wood pile cap <br /> ' replacements and other misc. pier repair work. <br /> • Bergerson Construction-Adam Neahring- 503-440-4423 <br /> Tulalip Tribes/ Reece Construction-Marine Drive Pedestrian Bridge <br /> • Project Scope: Complete construction of the 485'x 12' pedestrian bridge with 50- 12"dia, <br /> piling, 25 precast concrete pile caps, 72 hollow core panels, 5820 SF CIP concrete deck <br /> and 980' of handrailing in a native wetland. <br /> • Reece Construction- Nichol Smith- 360-659-9633 <br /> City of Kent-Lake Meridian Dock Replacement <br /> • Project Scope: Complete replacement of the Lake Meridian docks and swim float system <br /> to include demo of existing floats, new concrete floats, whalers, piling and misc. dock <br /> components. <br /> • City of Kent- Hope Gibson-253-856-5112 <br />
The URL can be used to link to this page
Your browser does not support the video tag.