My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Port of Everett-Pier 3 Pile Repairs 2016/2017 <br /> ' • Project Scope: Underwater repair of 43 damaged concrete and steel pile with Denso <br /> Wrap and Denso FRP jacket repair systems. <br /> ' . POE-Steve Hagar-425-259-3164 <br /> Port of Everett-MT-Fender Pile Replacement 2016-2017 <br /> • Project Scope: Remove and replace 20 fender piling at the Port of Everett main terminal. <br /> • Greg Dawsey-425-259-3164 <br /> City of Port Orchard, DeKalb Pier Extension <br /> • Project Scope: Demolish existing floating structures(13 piling and 1600 sf of dock <br /> structure) Fabricate, deliver and install 270' of new pier catwalks and 6— 12" piling, install <br /> 14 new 18" piling, aluminum floats and gangway structures with electrical and ADA <br /> requirements. <br /> ' • City of Port Orchard- Mark Dorsey <br /> Port of Everett- Marina Storm Damage Repairs 2016 <br /> • Project Scope: Repair Strom damaged areas of the Everett Marina and Jetty Island <br /> marine infrastructure system. <br /> • POE-Willie Whatson-425-259-3164 <br /> Port of Port Townsend, Port Townsend Marina Boat Ramp Extension <br /> • Project Scope: Demolish existing sheet pile wall and excavate approx. 750 cy of sand <br /> material. Construct an extension to the existing boat ramp, including new sheet pile, <br /> piling, docks, precast ramp and cast in place concrete ramp and approach to complete <br /> the new ramp extension with shoreline restoration. <br /> • Port of Port Townsend-Jim Pavarnik-360-379-5217 <br /> Port of Waterman, Port of Waterman Pier Reconstruction <br /> ' • Project Scope: Demolish existing pier(57 piling and 3000 sf of pier structure), upland <br /> area including retaining wall and parking area. Construct new retaining wall, promenade <br /> area, install 30 new piling and aluminum pier structure with electrical and ADA parking <br /> ' requirements and shoreline restoration. <br /> • Port of Waterman-Jack McCarn-360-509-1006 <br /> ' City of Seattle-Orion Marine Group-Chester Morse Lake Pump Stations <br /> • Project Scope: Diving Support for the new Chester Morse Pump Stations <br /> • Orion Marine Group- Dan Zimmerman-253-552-1140 <br /> ' • General Contractor-Orion Marine Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.