Laserfiche WebLink
• <br /> Port of Everett-Pier 3 Pile Repairs 2016/2017 <br /> ' • Project Scope: Underwater repair of 43 damaged concrete and steel pile with Denso <br /> Wrap and Denso FRP jacket repair systems. <br /> ' . POE-Steve Hagar-425-259-3164 <br /> Port of Everett-MT-Fender Pile Replacement 2016-2017 <br /> • Project Scope: Remove and replace 20 fender piling at the Port of Everett main terminal. <br /> • Greg Dawsey-425-259-3164 <br /> City of Port Orchard, DeKalb Pier Extension <br /> • Project Scope: Demolish existing floating structures(13 piling and 1600 sf of dock <br /> structure) Fabricate, deliver and install 270' of new pier catwalks and 6— 12" piling, install <br /> 14 new 18" piling, aluminum floats and gangway structures with electrical and ADA <br /> requirements. <br /> ' • City of Port Orchard- Mark Dorsey <br /> Port of Everett- Marina Storm Damage Repairs 2016 <br /> • Project Scope: Repair Strom damaged areas of the Everett Marina and Jetty Island <br /> marine infrastructure system. <br /> • POE-Willie Whatson-425-259-3164 <br /> Port of Port Townsend, Port Townsend Marina Boat Ramp Extension <br /> • Project Scope: Demolish existing sheet pile wall and excavate approx. 750 cy of sand <br /> material. Construct an extension to the existing boat ramp, including new sheet pile, <br /> piling, docks, precast ramp and cast in place concrete ramp and approach to complete <br /> the new ramp extension with shoreline restoration. <br /> • Port of Port Townsend-Jim Pavarnik-360-379-5217 <br /> Port of Waterman, Port of Waterman Pier Reconstruction <br /> ' • Project Scope: Demolish existing pier(57 piling and 3000 sf of pier structure), upland <br /> area including retaining wall and parking area. Construct new retaining wall, promenade <br /> area, install 30 new piling and aluminum pier structure with electrical and ADA parking <br /> ' requirements and shoreline restoration. <br /> • Port of Waterman-Jack McCarn-360-509-1006 <br /> ' City of Seattle-Orion Marine Group-Chester Morse Lake Pump Stations <br /> • Project Scope: Diving Support for the new Chester Morse Pump Stations <br /> • Orion Marine Group- Dan Zimmerman-253-552-1140 <br /> ' • General Contractor-Orion Marine Group <br />