My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Neptune General Contractors 1/25/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2022
>
Neptune General Contractors 1/25/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2022 10:19:54 AM
Creation date
2/11/2022 10:12:21 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Neptune General Contractors
Approval Date
1/25/2022
Council Approval Date
12/15/2021
End Date
5/31/2022
Department
Parks
Department Project Manager
Dean Shaughnessy
Subject / Project Title
Rotary Park Renovation
Public Works WO Number
PW2021-072
Tracking Number
0003186
Total Compensation
$419,650.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
279
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Port of Everett-Marina Float Surface Restoration and Flotation Upgrades 2015 <br /> ' • Project Scope: Repair Float surfaces and upgrade flotation on 102 Marina Floats <br /> p p <br /> City of Maple Valley-Lake Wilderness Dock Renovation <br /> • Project Scope: Remove and replace 10 piling and 56 concrete floats, new gangway and <br /> related components at the Lake Wilderness park. <br /> Port of Bellingham- Marine Cruise Terminal Passenger and Vehicle Ramp Repairs 2014 <br /> • Project Scope: Remove and replace damaged components of the passenger transfer <br /> span and repair of the vehicle transfer span concrete counterweights. <br /> ' Tulalip Tribes-Mackaye Harbor Pier Retrofit-2014 <br /> • Project Scope: Remove 132 creosote pilings and pier structure, replace 110- 12" Dia. <br /> steel piling and set all caps and stringers on the 680' long structure. Construct and install <br /> the 3000 sf float system <br /> ' Port of Friday Harbor-C-E & F Reconstruction Phase 1 <br /> • Project Scope: Remove and replace Whalers, Fuel dock, Finger floats and 4 Pile Dolphin <br /> ' groups. <br /> Port of South Whidbey-Langley Small Boat Harbor Improvements <br /> ' • Project Scope: Remove existing pier and Install 14 new 257 x 14 subsea piling and <br /> mooring system, separate and relocate 400 x 16 concrete float, Install new gangways, <br /> transition spans, gangway extension and related components. <br /> Port of Everett-South Marina Float Surface Repairs and Flotation Upgrades 2013 <br /> • Project Scope: Repair Float surfaces and upgrade flotation <br /> Port of Everett-MT-Fender Pile Replacement 2013-2014 <br /> • Project Scope: Remove and replace 20 fender piling at the Port of Everett main terminal. <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.