Laserfiche WebLink
1 <br /> Port of Everett-Marina Float Surface Restoration and Flotation Upgrades 2015 <br /> ' • Project Scope: Repair Float surfaces and upgrade flotation on 102 Marina Floats <br /> p p <br /> City of Maple Valley-Lake Wilderness Dock Renovation <br /> • Project Scope: Remove and replace 10 piling and 56 concrete floats, new gangway and <br /> related components at the Lake Wilderness park. <br /> Port of Bellingham- Marine Cruise Terminal Passenger and Vehicle Ramp Repairs 2014 <br /> • Project Scope: Remove and replace damaged components of the passenger transfer <br /> span and repair of the vehicle transfer span concrete counterweights. <br /> ' Tulalip Tribes-Mackaye Harbor Pier Retrofit-2014 <br /> • Project Scope: Remove 132 creosote pilings and pier structure, replace 110- 12" Dia. <br /> steel piling and set all caps and stringers on the 680' long structure. Construct and install <br /> the 3000 sf float system <br /> ' Port of Friday Harbor-C-E & F Reconstruction Phase 1 <br /> • Project Scope: Remove and replace Whalers, Fuel dock, Finger floats and 4 Pile Dolphin <br /> ' groups. <br /> Port of South Whidbey-Langley Small Boat Harbor Improvements <br /> ' • Project Scope: Remove existing pier and Install 14 new 257 x 14 subsea piling and <br /> mooring system, separate and relocate 400 x 16 concrete float, Install new gangways, <br /> transition spans, gangway extension and related components. <br /> Port of Everett-South Marina Float Surface Repairs and Flotation Upgrades 2013 <br /> • Project Scope: Repair Float surfaces and upgrade flotation <br /> Port of Everett-MT-Fender Pile Replacement 2013-2014 <br /> • Project Scope: Remove and replace 20 fender piling at the Port of Everett main terminal. <br /> I <br /> I <br />