My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
it <br /> TI <br /> I It <br /> E <br /> FRONTAGE RD ACCESS" L <br /> o <br /> NWAY <br /> U r175+50.0001 <br /> o <br /> U <br /> I > Vc <br /> z v — mr o , + � z I <br /> o 0 <br /> w w <br /> w w <br /> N N <br /> I <br /> I <br /> IPLAN <br /> SCALE: 1"=20' <br /> I <br /> 40- 48 ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) I -40 <br /> - <br /> 35- <br /> 35 <br /> I <br /> 30 — z � -30 <br /> 4"DIA PVC CONDUIT ENTIRE j <br /> LENGTH OF PIPELINE(SEE DWG N -25 <br /> 25 C13 •- ) n O w <br /> , an0 <br /> F 20 Li, + z <br /> in Q <br /> EXISTING GRADE i/ Zi z N 15 <br /> E 15 a� <br /> d " / 10 <br /> c > <br /> LLI <br /> Lu <br /> 5 S=-0.0009 FT/FT — , — — — — —1 — — — — S <br /> ri -0 <br /> Wg 5 5 <br /> -10 <br /> 3 -10 <br /> il --15 <br /> I 3 15 <br /> G 20 <br /> R a -20 <br /> s -25+ i +-25 <br /> I d z 172+00 172+20 172+40 172+60 172+80 173+00 173+20 173+40 173+60 173+80 174+00 174+20 174+40 174+60 174+80 175+00 175+20 175+40 175+60 175+80 176+00 176+20 176+40 176+60 176+80 177+00 <br /> c PROFILE <br /> Po <br /> a; SCALE: HORZ: 1"=20' <br /> i FOR INFORMATION ONLY 20 10 0 FEET 20 4D <br /> s o Designee PERT: 1"=20' <br /> Drawing <br /> a o Drawn M. EVERETT <br /> TULALIP PIPELINE REPAIR SEGMENT 4 C8 <br /> e 80 <br /> Checked ,e PUBLIC WORKS <br /> NO. ' DATE APRVD I REVISION Design Review Level gheetNo. �� <br /> PLANS ISSUED FOR Ev3200 <br /> ett,WA98201 9�/ 16 <br /> Cedar Street WORK ORDER 3774 STA 172+00 TO STA 177+00 <br /> BID CONST RECORD 425.257.8800 everettwa.gov <br /> LL ACTION DATE APRVD ACTION DATE APRVD ACTION I DATE APRVD I Of Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.