My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> N <br /> I <br /> 15 <br /> i <br /> 2 v <br /> 0Z <br /> FRONTAGE RD <br /> °I <br /> 0 <br /> I CC <br /> LU <br /> CC <br /> LU <br /> w <br /> cn <br /> I <br /> I <br /> I <br /> IPLAN <br /> SCALE: 1"=20' <br /> I <br /> 40 -40 <br /> 48"ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) I <br /> 35 <br /> 35- � <br /> i <br /> I <br /> 30 cal -30 <br /> —4"DIA PVC CONDUIT ENTIRE 3 <br /> 250 LENGTH OF PIPELINE(SEE DWG 0o.C-13) -25 <br /> a <br /> w <br /> 20 <br /> I <br /> F <br /> z' 20 w <br /> cc <br /> -15 <br /> E 15- EXISTING GRADE 13 / I.. I 10 <br /> t > 10- / �' w <br /> Ez w 5- 5=-0.0009 FT/FT S I S -5 w <br /> E LE <br /> dE 0- _ _ — — — — — — — — — -0 <br /> I <br /> "o S 5 <br /> 10 <br /> 11 3 -10 <br /> I m j --15 <br /> 1 <br /> G 15 20 <br /> Lg R -20 <br /> - g 25 <br /> '6 25, <br /> o Z 177+00 177+20 177+40 177+60 177+80 178+00 178+20 178+40 178+60 178+80 179+00 179+20 179+40 179+60 179+80 180+00 180+20 180+40 180+60 180+80 181+00 181+20 181+40 181+60 181+80 SS2, <br /> PROFILE .• •u <br /> 3 SCALE: HORZ: 'I 20 20 10 0 FEET 20 40 <br /> FOR INFORMATION ONLY VEP,T: 1"=20' <br /> Designed Drawn <br /> 9D iii E V E R E T T Drawing <br /> TULALIP PIPELINE REPAIR SEGMENT 4 C9 <br /> ((// Checked PUBLIC WORKS <br /> F NO. ( DATE APRVD I�, REVISION Je Sheet No. <br /> Design Review level " <br />' 3200 Cedar Street WORK ORDER 3774 STA 177 I Ofl TO STA 182+00 10 /16 <br /> PLANS ISSUED FOR Everett,WA98201 <br /> BID i CONST I RECORD 425.257.8800 everettwa.gav <br /> s ACTION DATE APRVD ACTION ! DATE APRVD ACTION DATE APRVD Of Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.