My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> E. <br /> s <br /> FRONTAGERD <br /> W <br /> z <br /> Ci <br /> oe <br /> kr <br /> i i o ACCESS MAN WA <br /> O <br /> c 185+54:00 <br /> o Q <br /> V <br /> 0 <br /> + Z <br /> ______,/ <br /> , <br /> 1 m / / <br /> s. <br /> I z <br /> Q J LLU <br /> iJ <br /> V) <br /> CC 1 <br /> w <br /> w / --.. <br /> CC <br /> IQ- <br /> rn �/ <br /> I ry <br /> II) ' / <br /> uPLAN <br /> SCALE: i"=20 <br /> I 40- 40 <br /> 48"ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) ' <br /> I <br /> -35 <br /> 35 I <br /> 30 <br /> 30 W z a <br /> —4"DIA PVC CONDUIT ENTIRE 3P w 25 <br /> 25- / LENGTH OF PIPELINE(SEE DWG (2I <br /> IR / C-13) W. F-o Lo <br /> w + 20 <br /> 20 z z ce <br /> —EXISTING GRADE / wcc <br /> p Z N ;.1 -15 <br /> E 15 ;' j w <br /> i / 2 <br /> Na w S w <br /> - - <br /> J <br /> E W '' S S=-0.0009 FT/FT w <br /> V0 — — — — — — — — — o <br /> IV si s s <br /> 3 10 --10 <br /> I m = -15- --15 <br /> dG <br /> a a -20- --20 <br /> 1011111." <br /> " _ <br /> > 182+00 182+20 182+40 182+60 182+80 183+00 183+20 183+40 183+60 183+80 184+00 184+20 184+40 184+60 184+80 185+00 185+20 185+40 185+60 185+80 186+00 186+20 186+40 186+60 186+80 187+00 <br /> c PROFILE <br /> I= SCALE: HORZ: I"=20' 20 10 0 FEET 20 40 <br /> Io s FOR INFORMATION ONLY VEPT: t"=20' <br /> co D M.esigned SD EVERETT TULALIP PIPELINE REPAIR SEGMENT4 Drawing <br /> a � <br /> �/SIZI A-( Checked113 <br /> PUBLIC WORKS She�Na.a �NO. DATE APRVD REVISION Design Review Levi / <br /> I = 3200 Cedar Street WORK ORDER 3774 11 / <br /> PLANS ISSUED FOR Everett WA98201 STA 182+00 TO STA 187+00 <br /> BID I CONST { RECORD 1 1 425.257.8800 everettwa.gov / 16 <br /> s LL ACTION DATE APRVD ACTION 1 DATE APRVD ACTION 1 DATE 1 APRVD / Of Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.