My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> II <br /> ii <br /> 1 <br /> 0 <br /> C -- — - _SD - SO —50 -- 5D -- -- 5D -- -- 50 — _ -- 50 -- 0 -- SD -- SD <br /> 1 FRONTAGE RD U <br /> ACCESS MANWAY (../ <br /> 11 --- ACCESS MANN/AY o <br /> F <br /> CC <br />' LLJ <br /> I 529 SB <br /> I <br /> - <br /> PLAN <br /> SCALE: 1"=20' <br /> I 40_ -40 <br /> 48"ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) I <br /> 35- -35 <br /> I 30- -30 <br /> z <br /> -4"DIA PVC CONDUIT ENTIRE O a <br /> �' -25 <br /> 25 LENGTH OF PIPELINE(SEE DWG F; >o <br /> IC. W <br /> o / C13) I-o a� <br /> 20 Z Wa f/ ww �� 20 <br /> 2 N W+ re <br /> a <br /> 15 3" EXISTING GRADE / Z'an., <br /> a -15 <br /> W W <br /> � z 10 I - 1/ / <br /> -- <br /> a W w 5 Tf S f S s=0.0010 FT/FT 1 H W <br /> o — — — — — — — — — o <br />' >� I <br /> - - s <br /> `3 10 Q 10 <br /> w <br /> N <br /> m 1 tV 0 <br /> I -15- do -15 <br /> L. <br /> 20 o_vv))u --20 <br /> I " z <br /> 25, 25 <br /> t G 192+00 192+20 192+40 192+60 192+80 193+00 193+20 193+40 193+60 193+80 194+00 194+20 194+40 194+60 194+80 195+00 195+20 195+40 195+60 195+80 196+00 196+20 196+40 196+60 196+80 197+00 <br /> ma PROFILE Ima�m� <br />' S FOR INFORMATION ONLY SCALE: HORZ: 1"=20' 20 10 0 FEET 20 4D <br /> VERT: 1'=20' <br /> cf Drawg Designed RD EVERETT TULALIP PIPELINE REPAIR SEGMENT4 Drawing <br /> C i 1 ..3k, A-t Checked Sheet No. <br /> I <br /> \— ID PUBLIC WORKS <br /> NO. DATE APRVD REVISION Design Review Level <br /> 3200 Cedar Street WORK <br /> n STA 192+00 TO STA 197+00 <br /> PLANS ISSUED FOR WA98201 yVOR'`� OR�ER77'F 13 <br /> BID CONST RECORD I Everett,45.257.8800 everettwa.gov 16 <br /> a. ACTION DATE APRVD ACTION DATE APRVD ACTION ( DATE APRVD Or Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.