My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I -. _ _ <br /> ii <br /> kg. <br /> i <br /> Ii <br /> I <br /> $_._-_._.--EhR(gy._ _ — "_ _._—._tyfit/4$D <br /> __ - "VEAL �5._ EMR/W -3B--4VPRjtSr �� CVfRJMY <br /> Ir—I <br /> a --.EVEN/W--� —EY 'w`S� ^RPAt=�' ----_ _= <br /> a z <br /> _ _ 11 <br /> O O N <br /> T. O <br /> O n_ Q�.�/ <br /> Q� " __._. . _ _. 0 <br /> I <br /> LU <br /> w VI <br /> LU <br /> L/7 <br /> I 529 5B <br /> PLAN <br /> SCALE 1"'=20' <br /> I 40- 48"ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) -40 <br /> 48"ID X 0.270"TK MLTCSP(TRENCH TYPE 2-PAVED ROADWAY) ) <br /> 35 <br /> 35- <br /> I 30- -30 <br /> 4"DIA PVC CONDUIT ENTIRE 4"DIA PVC CONDUIT ENTIRE <br /> 25 LENGTH OF PIPELINE(SEE DWG LENGTH OF PIPELINE(SEE DV-25 <br /> C-13) ! ) <br /> -20 <br /> I i <br /> 20- EXISTI-15 <br /> 15- —EXISTING GRADE <br /> i 10 <br /> t d 10 <br /> W J <br /> ...IW <br /> c W 5 5=0.0010 FT/FT S S S=0.0010 FT/FT — 5 <br /> 111 r a )T -5- <br /> 10 <br /> 3 -10- <br /> m 5 --15 <br /> -15- <br /> 20 <br /> "' 20 <br /> I <br /> z -25-I G 197+00 197+20 197+40 197+60 197+80 198+00 198+20 198+40 198+60 198+80 199+00 199+20 199+40 199+60 199+80 200+00 200+20 200+40 200+60 200+80 201+00 201+20 201+40 201+60 201+80 202+00 <br /> PROFILE ,..�., <br /> 3 SCALE: HORZ: 1"=20' 20 10 0 20 40 <br /> FEET <br /> 5 FOR INFORMATION ONLY VERT: 1"=20' <br /> Drawing <br /> Designed wn <br /> RD EVERETT TULALIP PIPELINE REPAIR SEGMENT 4 C13 <br /> r tLl I AA Checked <br /> J9 MI= PUBLIC WORKS <br /> I o E NO. DATE APRVD REVISION Design Review Level Sheet Na. / <br /> 3200 Cedar Street WORK ORDER 3774 STA 197+00 TO STA 202+00 14 :'�16 <br /> PLANS ISSUED FOR Everett,WA98201 <br /> BID ' CONST RECORD 42525Z8800 everettwa.gov <br /> 2 3 ACTION J DATE APRVD ACTION DATE APRVD ACTION DATE APRVD Of Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.