My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item 2 - SPECIFICATION 00 4113, BID FORM, Page 1, Section 1.1.A <br /> Replace the address provided with the following: ' <br /> CITY OF EVERETT <br /> CITY PURCHASING DEPARTMENT ' <br /> PUBLIC WORKS BUILDING <br /> 3200 CEDAR STREET, DOOR#5 <br /> EVERETT, WA 98201 , <br /> Item 3 - SPECIFICATION 00 4336, SUBCONTRACTORS FORM <br /> Form added in its entirety (see attached) <br /> Item 4- SPECIFICATION 00 5213, AGREEMENT FORM, Page 1, Section 2 Contract Time 1 <br /> Replace with "Substantial Completion of the Work shall be achieved before April 29, <br /> 2022. Physical Completion shall be within Fifteen (15) calendar days after the actual <br /> date of issuance of Substantial Completion." <br /> Item 5 - SPECIFICATION 01 5000, TEMPORARY AND ENVIRONMENTAL CONTROLS, Page 4, ' <br /> Section 1.5 C <br /> Add the following: <br /> 4. The Contractor may discharge chlorinate water to sanitary sewer at Railroad Ave <br /> (Segment 1S), with application and approval of a discharge authorization permit. <br /> There is no cost associated with this permit. <br /> Item 6 - Appendix B: Reference Drawings of Tulalip Pipeline , <br /> Appendix B is replaced in its entirety (see attached). This resolves a conflict between <br /> the as-builts and GIS. Access manway locations have been field-verified. <br /> ANSWERS TO QUESTIONS SUBMITTTED FOR CLARIFICATION <br /> Q1- For Segment 1N it appears that there is a bumped head assembly (at STA 43+70.00) <br /> and the pipeline stops at a bump head assembly at STA 56+49.75. Is the integrity of ' <br /> these boundaries sufficient to isolate Segment 1N during the repair period? <br /> See revised reference plan set. The bumped head assemblies were temporary for ' <br /> segment installation, not permanent appurtenances in the existing active pipeline. <br /> The boundaries between segments are not necessarily the locations of the isolation <br /> A( Addendum 1 Page 2 <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425)257-8800• Fax (425)257-8882 ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.