My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett TOC <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> 01 35 53 Security Procedures <br /> 01 42 00 References <br /> 01 50 00 Temporary and Environmental Controls <br /> 01 60 00 Materials and Equipment <br /> 01 74 23 Final Cleaning <br /> 01 77 00 Closeout Procedures <br /> Division 3 — Concrete I <br /> 03 0100 Maintenance of Concrete <br /> Division 33 — Utilities <br /> 33 1300 Disinfecting of Water Utility Distribution I <br /> APPENDICES <br /> APPENDIX A State Prevailing Wages <br /> APPENDIX B Reference drawings of Tulalip Pipeline <br /> APPENDIX C Inspection Report ' <br /> I <br /> 1 <br /> TOC - 2 TABLE OF CONTENTS <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.