Laserfiche WebLink
City of Everett 00 2113 - 9 <br /> ' 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> amount of the bond or cashier's check, which shall be not less than five <br /> percent of the Total Bid Amount, may be shown in dollars or on a <br /> ' percentage basis. <br /> 5. Disadvantaged/Women's Business Enterprise: To be filled in and signed by <br /> the Bidder. <br /> 6. Non-Collusion Affidavit: To be signed, notarized and submitted with the Bid. <br /> B. Failure to complete and fully execute the aforementioned forms and to submit <br /> them with the Bid may result in rejection of Bid. <br /> C. The following forms are to be executed after the award of Contract: <br /> 1 1. Contract: This Contract to be executed by the successful Bidder in duplicate <br /> within 14 calendar days after the award date. <br /> 2. Payment and Performance Bonds: These forms are to be executed by the <br /> successful Bidder and his surety company in triplicate. The amount of these <br /> bonds shall be 100 percent of the Total Bid and shall be submitted with the <br /> Contract. <br /> 1 3. Proof of Insurance: Insurance certificates and endorsements shall be <br /> obtained and maintained in force in accordance with SECTION 00 7200, <br /> Part 15 "Liability and Insurance", of the Contract Documents. <br /> 4. Power of Attorney: Attorneys-in-fact who sign bid bonds or contract bonds <br /> must file with each bond a certified and effectively dated copy of their Power <br /> of Attorney. <br /> 5. Statement of Intent to Pay Prevailing Wage (L&I Form F700-029-000) and <br /> Affidavit of Wages Paid (F700-007-000)from the Contractor, Subcontractor <br /> and agents to the Subcontractor shall be submitted to the Employment <br /> Standards Division, State Department of Labor and Industries, Olympia, <br /> Washington. If the prime contract is over $1,000,000, then Contractor also <br /> needs to submit L&I Form F700-164-000 (Affidavit of Wages Paid EHB <br /> 2805 Addendum). <br /> 6. Weekly Statement with Respect to Payment of Wages (U.S. Dept of Labor <br /> Form WH347): Contractors, Subcontractors, and agents to Subcontractors <br /> using Payroll Form WH347 may use State of Compliance found on the back <br /> of the form. <br /> 7. Weekly Statement of Compliance (U.S. Dept of Labor Form WH348). <br /> Contractors, Subcontractors, or agents to Subcontractors not using Payroll <br /> Form WH347 shall attach the Statement of Compliance Form WH348 to <br /> ' each payroll. <br /> 8. Approval of Subcontractors: Contractors shall request approval of <br /> Subcontractors on a form provided by the City prior to their working on the <br /> I Site. <br /> 9. Construction Progress Schedule: To be submitted as required by Section <br /> 00 7200, Part 5 "Progress and Completion", of the Contract Documents by <br /> the Contractor within ten calendar days, or such time as determined by the <br /> City, after the date of receipt of Notice to Proceed. <br /> 002113 - 9 T INS RUCTIONS TO BIDDERS <br /> I <br />