Laserfiche WebLink
City of Everett 00 2113 - 10 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> 10. Traffic Control Plan: Standard Traffic Control Plans are included in the City's <br /> Design and Construction Standards. If, and to the extent, such plans are <br /> not sufficient, complete or adequate to support the Bidder's planned means <br /> and methods of performing the Work, the Bidder must develop an adequate, <br /> complete and sufficient traffic control plan at its cost, that shall be submitted <br /> for the City's approval prior to construction. Deviation from the Standard I <br /> Plans must be submitted by the Contractor and approved by the City prior <br /> to construction. <br /> 11. Disposal Sites: Provide the City with the location of all disposal sites to be <br /> used, and also provide copies of the permits and approvals for such <br /> disposal sites. The Contractor shall provide the City with copies of all <br /> permits for disposal and storage of surplus materials within ten calendar <br /> days after award of the Contract. <br /> 1.23 POSTPONEMENT OF OPENING <br /> A. The City reserves the right to postpone the date and time for receiving or opening <br /> of Bids, or both, at any time prior to the date and time established in the Notice <br /> to Bidders. Postponement notices shall be provided to Bidders in the form of <br /> addenda. ' <br /> 1.24 BUSINESS LICENSE I <br /> A. A City of Everett business license is required for the Contractor and <br /> Subcontractors performing Work on this Project. <br /> END OF SECTION 00 2113 <br /> I <br /> I <br /> I <br /> I <br /> 00 2113 - 10 INSTRUCTIONS TO BIDDE <br /> RS <br /> I <br />