Laserfiche WebLink
Cityof Everett 00 - I <br /> 4113 2 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 I <br /> ITEM ESTIMATED UNIT CONTRACT <br /> NO. DESCRIPTION UNIT QUANTITY PRICE PRICE <br /> Mobilization and 1' Demobilization LS 1 N/A $ <br /> 2. Traffic Control LS 1 N/A $ . <br /> 3 Dewater Segments for LS 1 N/A $ I <br /> Mortar Repair <br /> 4 Remove and Replace EA 157 $ I <br /> Field Applied Mortar <br /> Fill, Disinfect, and <br /> 5' $ I <br /> LS 1 N/A Flush Pipeline . <br /> Spot Inspection of I <br /> Lateral and <br /> 6' Circumferential LS 1 N/A $ <br /> Cracking I <br /> 7. Crack Repair LF 500 $ . <br /> Force Account I <br /> 8. (Section 00 7200) — N/A N/A $15,000.00 <br /> SUBTOTAL $ I <br /> Washington State Sales $ <br /> Tax@9.8% I <br /> TOTAL BID $ <br /> I <br /> 1.3 ACCEPTANCE <br /> A. This offer shall be open to acceptance and is irrevocable for 45 days from the Bid <br /> closing date. <br /> B. If this Bid is accepted by the Owner within the time period stated above, we will: <br /> 1. Execute the Agreement within 14 days of receipt of Notice of Award. <br /> 2. Furnish the required 100% payment and 100% performance bonds withinI <br /> 14 calendar days of receipt of Notice of Award in the form described in <br /> Contract Documents. <br /> 3. Commence Work within seven calendar days after receipt of Notice to I <br /> Proceed. <br /> 00 4113 - 2 BID FORM <br />