My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company 2/2/2022
>
Contracts
>
Capital Contract
>
Reece Construction Company 2/2/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2022 11:44:36 AM
Creation date
2/11/2022 1:20:55 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company
Approval Date
2/2/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Jennifer Bailey
Subject / Project Title
2022 Tulalip Water Pipeline Mortar Repair
Public Works WO Number
UT3774
Tracking Number
0003187
Total Compensation
$1,054,519.20
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Company 5/13/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
356
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICityof Everett 00 4113 - 3 <br /> 2022 Tulalip Water Pipeline Mortar Repair UT 3774 <br /> III <br /> C. If this Bid is accepted within the indicated time, and we fail to commence the Work <br /> I <br /> or we fail to provide the required bonds, the Bid security shall be forfeited as <br /> damages to the Owner by reason of our failure, limited in amount to the lesser of <br /> the face value of the Bid security or the difference between this Bid and the Bid <br /> Iupon which Contract is signed. <br /> D. In the event our Bid is not accepted within the time stated above, the required Bid <br /> security will be returned to the undersigned, according to the provisions of the <br /> IInstructions to Bidders, unless a mutually satisfactory arrangement is made for <br /> its retention and validity for an extended period of time. <br /> I1.4 CONTRACT TIME <br /> IA. If this Bid is accepted, we will: <br /> 1. Begin work immediately after receiving Owner's letter of Notice to Proceed <br /> and to reach Substantial Completion within the dates required under the <br /> IContract Documents. <br /> 2. Agree to pay liquidated damages to the City as stated in the Contract in the <br /> event the project is not completed on or before required time periods. <br /> I3. Contract with the Owner using the Contract form provided herewith, on the <br /> terms and conditions contained herein, to do everything necessary to <br /> complete the construction of the project in the allotted time. <br /> 1 <br /> 1.5 ADDENDA <br /> I <br /> I A. Following Addenda have been received, and the modifications to the Bid <br /> Documents noted below have been considered and all costs are included in the <br /> Bid. <br /> I Addendum No , dated <br /> Addendum No , dated <br /> Addendum No , dated <br /> IAddendum No , dated <br /> I <br /> 1.6 BIDDER CERTIFICATIONS <br /> A. Bidder, at the time of submitting this Bid and throughout the period of the contract, <br /> I will remain licensed by the state of Washington to perform the type of work <br /> required under the Contract Documents. <br /> I B. Bidder is skilled and regularly engaged in the general class and type of work <br /> required by the Contract Documents and has the capability to successfully <br /> manage construction projects. <br /> IA' <br /> 00 4113 - 3 BID FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.