My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 NORTH PARK DR 2022-02-23
>
Address Records
>
NORTH PARK DR
>
1020
>
1020 NORTH PARK DR 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 1:48:58 PM
Creation date
2/15/2022 11:08:00 AM
Metadata
Fields
Template:
Address Document
Street Name
NORTH PARK DR
Street Number
1020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 961916 <br /> Mason Residence Addition and Deck August 24,2016 <br /> Everett,Washington Page 12 'Ls <br /> For 2-inch diameter pipe piles driven to refusal using a hand-held, 140-pound jackhammer, we <br /> recommend a design axial compression capacity of two tons for each pile. The refusal criterion for this <br /> pile and hammer size is defined as less than one inch of movement during 60 seconds of continuous <br /> driving. We recommend using galvanized extra strong(Schedule 80)steel pipe. <br /> Final pile depths should be expected to vary somewhat and will depend on the depth of the loose material, <br /> the nature of the underlying competent soils, and groundwater conditions. The pin piles should penetrate <br /> a minimum of five feet into the competent native glacial soils below the fill material in order to develop <br /> the design capacity. Based on our explorations, we would recommend that the piles be driven to a <br /> minimum depth of 20 feet below the ground surface nearest to the steep slope area and 15 feet within the <br /> upper southern portion of the deck to achieve the minimum embedment depth into the competent glacial <br /> soils. Piles that do not meet this minimum embedment criterion should be rejected, and replacement piles <br /> should be driven after consulting with the structural engineer regarding the new pile locations. The piles <br /> should be spaced a minimum of three feet apart to avoid a grouping effect on the piles. <br /> Due to the relatively small slenderness ratio of pin piles, maintaining pin pile confinement and lateral <br /> support is essential in preventing pile buckling. Pin piles should be suitably embedded into the reinforced <br /> concrete. The structural engineer should design the connections of the piles to the foundations. <br /> Vertically driven pin piles do not provide meaningful lateral capacity. All lateral loads should be <br /> transferred back to the existing residence via grade beams. We also recommend that the deck posts be <br /> supported on a series of grade beams that is also tied back into the existing residence. Due to the rigid <br /> pile support, friction between the foundation and subgrade soil should not be considered as resisting <br /> lateral pressures on this structure. <br /> Slab-on-Grade <br /> If a slab-on-grade is planned for this site and some slab settlement and future maintenance can be <br /> tolerated,we recommend that the slab area be over-excavated by a minimum of two feet and the slab-on- <br /> grade supported on a minimum of two feet of granular material (2-inch crushed rock) compacted to <br /> structural fill specifications. The slab should be additionally reinforced and doweled cold joints <br /> incorporated in the slab design, to further reduce the effects of differential settlement. Some slab <br /> settlement, differential settlement, and cracking should be expected, due to the existence of the loose <br /> undocumented fill soils. If no settlement of the slab can be tolerated, the slab should be designed as a <br /> structural slab and supported on pin piles. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.