My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 NORTH PARK DR 2022-02-23
>
Address Records
>
NORTH PARK DR
>
1020
>
1020 NORTH PARK DR 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 1:48:58 PM
Creation date
2/15/2022 11:08:00 AM
Metadata
Fields
Template:
Address Document
Street Name
NORTH PARK DR
Street Number
1020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Evaluation NGA File No. 961916 <br /> Mason Residence Addition and Deck August 24,2016 <br /> Everett,Washington Page 13 1 25 <br /> We recommend that all floor slabs be underlain by at least six inches of free-draining gravel (less than 3 <br /> percent by weight passing the US sieve #200) for use as a capillary break. We recommend that the <br /> capillary break be hydraulically connected to the footing drain system to allow free drainage from under <br /> the slab. A suitable vapor barrier, such as heavy plastic sheeting(6-mil minimum), should be placed over <br /> the capillary break material. An additional 2-inch-thick moist sand layer may be used to cover the vapor <br /> barrier. This sand layer is optional and mainly intended to protect the vapor barrier membrane during <br /> construction. <br /> Structural Fill <br /> General: Fill placed beneath foundations, slabs, or other settlement-sensitive structures should be placed <br /> as structural fill. Structural fill, by definition, is placed in accordance with prescribed methods and <br /> standards, and is monitored by an experienced geotechnical professional or soils technician. Field <br /> monitoring procedures would include the performance of a representative number of in-place density tests <br /> to document the attainment of the desired degree of relative compaction. The area to receive the fill <br /> should be suitably prepared as described in the Site Preparation and Grading subsection of this report <br /> prior to beginning fill placement. <br /> Materials: Structural fill should consist of a good quality, granular soil, free of organics and other <br /> deleterious material, and be well graded to a maximum size of about three inches. All-weather structural <br /> fill should contain no more than five-percent fines (soil finer than U.S. No. 200 sieve, based on that <br /> fraction passing the U.S. 3/4-inch sieve). The use of on-site soils as structural fill is not recommended. <br /> We should be retained to evaluate proposed structural fill material prior to placement. <br /> Fill Placement: Following subgrade preparation, placement of structural fill may proceed. All fill <br /> placements should be accomplished in uniform lifts up to eight inches thick. Each lift should be spread <br /> evenly and be thoroughly compacted prior to placement of subsequent lifts. <br /> All structural fill underlying building areas should be compacted to a minimum of 95 percent of its <br /> maximum dry density. Maximum dry density, in this report, refers to that density as determined by the <br /> ASTM D-1557 Compaction Test procedure. The moisture content of the soils to be compacted should be <br /> within about two percent of optimum so that a readily compactable condition exists. It may be necessary <br /> to over-excavate and remove wet soils in cases where drying to a compactable condition is not feasible. <br /> All compaction should be accomplished by equipment of a type and size sufficient to attain the desired <br /> degree of compaction. <br /> NELSON GEOTECHNICAL ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.