My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Everett 1/3/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
Port of Everett 1/3/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:12 AM
Creation date
2/18/2022 8:54:19 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Everett
Approval Date
1/3/2022
Council Approval Date
12/22/2021
Department
Public Works
Department Project Manager
Souheil Nasr/Tim Benedict
Subject / Project Title
Norton Terminals
Public Works WO Number
UP3768
Tracking Number
0003194
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of establishing a viable truck route to the north. The City will be allowed to utilize an <br /> existing asphalt road,to the northeast of the License Area,to access the secured site entry <br /> location. The City and the Port shall coordinate closely to identify the exact truck route, <br /> and such truck route shall be approved by the Port,which will not be unreasonably <br /> withheld. If necessitated by the unavailability of the preload area as determined by the <br /> Port,the Port acknowledges that the City will require an alternative access road along the <br /> northeasterly portion of the Port Property in order to access the License Area and to <br /> stockpile excavated material on the City Property. Accordingly,the City may build and <br /> use, at its sole cost and expense,up to a 50-foot-wide gravel access road at the location <br /> shown on Exhibit C. At the request of the Port,the City will remove the access road <br /> material. The Northern gravel access road shown on Exhibit C shall not be part of the <br /> License Area. The City and the Port shall coordinate matters regarding the access road <br /> each week, during the weekly construction coordination meetings. <br /> 7. The City hereby acknowledges that the Port will be working on other parts of the Port <br /> Property. Accordingly, the City will confine the Work to the portions of the License <br /> Area which have not been previously released as provided in Paragraph 3 above, and, <br /> with respect to Crossings,the City will comply with Paragraph 5 above. <br /> 8. The City may use the License Area for staging and laydown of materials, except for in <br /> the location of the Crossings. <br /> 9. The City hereby acknowledges and agrees that the City does not have exclusive use of <br /> the License Area. The City hereby acknowledges and agrees that the Port may perform <br /> construction(e.g., utility trenching, utility construction,placing and compacting fill <br /> materials, etc.)within the License Area subject to the coordination of such work with the <br /> City; however, if such Port use causes the City to be unable to use the License Area or <br /> portion thereof, and the City's Contractor is unable to conduct planned work within such <br /> portion of the License Area due to the Port's use,then the resulting direct number of days <br /> that the City's Contractor's inability to work in such portion of the License Area delays <br /> Interim Completion of the Work shall be added to the Term of the Agreement. The Port <br /> shall coordinate any Port or Port contractor's use of the License Area with the City. <br /> 10. If the City is required under the Environmental Indemnification Agreement or otherwise <br /> to complete any remedial actions or other environmental work outside of the License <br /> Area,the Port and the City shall coordinate such work before the work begins, in <br /> consultation with the Ecology site manager. The area of the Port Property necessary for <br /> such work shall be deemed part of the License Area. <br /> 11. The City and the Port shall diligently facilitate coordination of their respective <br /> contractors in an effort to avoid construction conflicts. At a minimum,the City,the Port, <br /> and their respective contractors shall meet once per week during the weeks prior to the <br /> commencement of the Work, and throughout the duration of the Work. The City shall <br /> provide the Port with a detailed schedule and timeline for the Work. <br /> 12. The City shall protect all utilities the City encounters within the License Area. If any of <br /> these utilities are damaged,the City will replace such utilities in like condition,to the <br /> Exhibit E <br /> 112558540 10 0073013-00041 <br />
The URL can be used to link to this page
Your browser does not support the video tag.