Laserfiche WebLink
FY <br /> EXHIBIT A <br /> SCOPE OF SERVICES <br /> The City of Everett, Washington (City) is currently in the process of converting the Kimberly- <br /> Clark treatment facilities into the Port Gardner Storage Facility (PGSF) in order to control the <br /> remaining active combined sewer overflow (CSO) sites along the City's waterfront. <br /> Under Task 800.2, HDR completed the Port of Everett Combined Sewer Main Improvements <br /> design which included the design of a 42-inch combined sewer gravity main and parallel 12-inch <br /> force main (approximately 2,350 LF each) prior to the commencement of the future Port of <br /> Everett Maritime Industrial Expansion — Norton Terminal project. This pipeline (defined as <br /> Conveyance Option C018 in the PGSF Conveyance Alternative Technical Memorandum dated <br /> April 14, 2021) will allow combined sewer flows to be pumped either directly from Lift Station 2 <br /> (LS2) or from Lift Station 3 (LS3) to the future PGSF. This project will also be used in reverse to <br /> provide operational resiliency by pumping from the future Lift Station X located adjacent to the <br /> PGSF back to LS3. <br /> The intent of this scope of services is to provide an amendment to account for design <br /> modifications as a result of the Port of Everett license agreement negotiations and perform <br /> construction phase services for the Port of Everett Combined Sewer Main Improvements <br /> project. <br /> co of ice <br /> Task 800.2 — Additional Services — Port of Everett Pipeline <br /> Objective <br /> Additional design modifications required to address Port of Everett license agreement <br /> negotiations. <br /> Consultant Services <br /> 1. Incorporate design modifications as a result of the Port of Everett license agreement <br /> negotiations. <br /> Client Responsibilities <br /> 1. None. <br /> Assumptions <br /> 1. Bid advertisement delayed approximately 30 calendar days to incorporate design <br /> modifications and to coordinate with the Port and the City. <br /> Deliverables <br /> 1. Continuation of original scope of work. <br /> City of Everett—PGSF Amendment No. 2 1 Scope of Services <br />