My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering Inc. 1/18/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
HDR Engineering Inc. 1/18/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2022 9:36:04 AM
Creation date
2/18/2022 9:35:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering Inc.
Approval Date
1/18/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Matt Welborn
Subject / Project Title
Cost of Service Study
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002267
Total Compensation
$25,679.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This completes the scope of services and approach for the City's water,water filtration,sewer, and <br /> stormwater rate studies and supporting analyses. <br /> Project Team <br /> The project team for the City's study will be the same team as the current project scope. Shawn Koorn <br /> will be the project manager and Kevin Lorentzen will lead the technical analysis. Judy Dean will provide <br /> as needed assistance and lead the GASB 83 task. <br /> Proposed Time Schedule <br /> The amendment is intended to cover a two-year period,ending December 31,2023. <br />
The URL can be used to link to this page
Your browser does not support the video tag.