CAUTION-
<br />T�
<br />1.
<br />FLOOR PLAN NOTES
<br />CONTRACTOR AND ARCHITECT TO REVIEW & APPROVE CHALK LINES OF PARTITION
<br />FIRE AUTHORITY NOTES
<br />1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED - SCHEDULE 72 HOURS IN
<br />GENERAL PROJECT NOTES
<br />GENERAL NOTES, JOB SFE NOTES:
<br />LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION.
<br />ADVANCE.
<br />1.
<br />ALL WORK SHALL BE PERFORMED SO AS TO COMPLY WITH ALL LEGAL, INDUSTRY
<br />1. WHERE EXISTING TENANTS/BUSINESSES ARE ADJACENT TO THE JOB SITE/TENANT,
<br />2.
<br />CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION.
<br />AND PROJECT -SPECIFIC REQUIREMENTS AND STANDARDS INCLUDING WITHOUT
<br />THE CONTRACTOR SHALL MINIMIZE CONSTRUCTION NOISE - EXTREMELY NOISY
<br />2. THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING
<br />LIMITATION OF THE FOLLOWING:
<br />CONSTRUCTION SHALL OCCUR AT NON -TYPICAL BUSINESS HOURS. CONTRACTOR
<br />3.
<br />EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE, U.O.N.
<br />BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE
<br />SHOULD NOTIFY BUILDING REPRESENTATIVE OF SPECIAL CIRCUMSTANCES IN
<br />STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT
<br />ADVANCE PRIOR TO WORK.
<br />4.
<br />ALL CONDUIT PIPING IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL
<br />STANDARDS.
<br />A.
<br />ALL APPLICABLE BUILDING CODESB.
<br />CONSTRUCTION.
<br />ALL APPLICABLE SPECIALTY CODES INCLUDING THE MOST CURRENT ISSUES AND
<br />2: THE CONTRACTOR AT HIS OWN EXPENSE, SHALL KEEP THE PROJECT AND
<br />3. AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN
<br />SUPPLEMENTS
<br />SURROUNDING AREA FREE FROM DUST AND DEBRIS. THE WORK SHALL BE IN
<br />5.
<br />DOOR OPENINGS !N PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN
<br />PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SITE,
<br />C.
<br />THE PROJECT MANUAL AND ASSOCIATED SPECIFICATIONS
<br />CONFORMANCE WITH THE AIR AND WATER POLLUTION CONTROL STANDARDS AND
<br />0'-4" OF ADJACENT PERPENDICULAR PARTITION,
<br />4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF
<br />D.
<br />E.
<br />THE MANUFACTURER'S REQUIREMENTS OR RECOMMENDATIONS
<br />REGULATIONS OF THE STATE DEPARTMENT OF HEALTH.
<br />COMBUSTIBLE BUILDING MATERIALS TO THE SITE:
<br />ALL APPLICABLE LANDLORD BUILDING STANDARDS
<br />3. CONSTRUCTION DEBRIS AND WASTES SHALL BE DEPOSITED AT AN APPROPRIATE
<br />6.
<br />CONTRACTOR SHALL USE 3-5/8" METAL STUDS MINIMUM AT ALL PLUMBING
<br />SITE. THE CONTRACTOR SHALL INFORM THE BUILDING REPRESENTATIVE OF THE
<br />WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES
<br />5. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN
<br />2.
<br />IN USING THESE PLANS FOR BIDDING OR CONSTRUCTION PURPOSES, ALL
<br />LOCATION OF DISPOSAL SITES,
<br />SHALL BE REPORTED TO THE ARCHITECT.
<br />COMPLIANCE WITH LOCAL FIRE AUTHORITY.
<br />CONTRACTORS ARE REQUIRED TO REVIEW AND TREAT THEM AS A WHOLE IN
<br />ORDER TO IDENTIFY ALL REQUIREMENTS THAT DIRECTLY OR INDIRECTLY AFFECT
<br />4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE GENERAL CLEANING OF THE JOB
<br />7.
<br />USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO
<br />6. FIRE SPRINKLER SYSTEM(S) SHALL MEET STATE uc LOCAL FIRE CODES AND BE
<br />THEIR PORTION OF THE WORK, EVEN REQUIREMENTS LOCATED IN SECTIONS
<br />AFTER ITS COMPLETION. WHERE APPLICABLE, CLEANING SHALL INCLUDE, BUT
<br />MOISTURE OR WHERE TILE IS USED.
<br />PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0".
<br />DESIGNATED AS APPLICABLE TO OTHER TRADES OR IN DOCUMENTS PROVIDED BY
<br />NOT BE LIMITED TO, THE EXTERIOR AND THE INTERIOR. OF THE BUILDING, THE
<br />OTHER MEMBERS OF THE PROJECT DESIGN TEAM. UNLESS EXPRESSLY PROVIDED
<br />PATH OF TRAVEL TO THE JOB SITE, PARKING LOTS, ELEVATORS, LOBBIES, AND
<br />8.
<br />ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL
<br />7. FIRE SPRINKLER SYSTEM(S) AND ALL CONTROL VALVES, INCLUDING EXTERIOR
<br />OTHERWISE, THE INTENT IS TO INCLUDE ALL LABOR, MATERIALS, PRODUCTS AND
<br />CORRIDOR CARPETS.
<br />CODES.
<br />SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER
<br />SERVICES NECESSARY OR APPROPRIATE FOR THE COMPLETED PROJECT AS
<br />STATE & LOCAL FIRE CODES.
<br />CALLED FOR OR REASONABLY IMPLIED FROM THE PLANS AND SPECIFICATIONS
<br />5. THE CONTRACTOR SHALL PROVIDE PEDESTRIAN PROTECTION, WHERE REQUIRED
<br />9.
<br />ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING
<br />PROVIDED BY THE PROJECT'S DESIGN TEAM. IN CASE OF CONFLICTS OR
<br />PER STATE AND LOCAL CODES.
<br />DRAWINGS,
<br />8. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER
<br />OMISSIONS, THE AFFECTED CONTRACTOR IS REQUIRED TO EITHER OBTAIN
<br />SYSTEMS AND WATER -FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE
<br />DIRECTION FROM AN APPROPRIATE REPRESENTATIVE OF THE OWNER, OR
<br />6. IF TRENCHES OR EXCAVATIONS 5'-0" OR MORE IN DEPTH ARE REQUIRED, OBTAIN
<br />10.
<br />ALL PLUMBING CLEAN -OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE.
<br />ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS (100) OR
<br />OTHERWISE TO APPLY THE MORE STRINGENT OR COSTLY STANDARD.
<br />ISSUANCE OF A BUILDING OR GRADING PERMIT.
<br />CONTRACTOR SHALL COORDINATE ALL CLEAN -OUT LOCATIONS WITH EQUIPMENT,
<br />MORE,
<br />AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT
<br />3.
<br />IN INTERPRETING THESE PLANS, THE FOLLOWING GENERAL RULES APPLY:
<br />7. NO HAZARDOUS MATERIALS SHALL BE USED OR STORED WITHIN THE BUILDING
<br />FOR APPROVAL PRIOR TO INSTALLATION.
<br />9. ELECTRICAL SUBCONTRACTORS TO INSTALL_ WIRING FOR FIRE SPRINKLER, ALARM
<br />WHICH DOES NOT COMPLY WITH THE LOCAL FIRE AUTHORITY AND STATE &
<br />BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT.
<br />COUNTY REQUIREMENTS.
<br />11.
<br />ALL MILLWORK SHALL CONFORM TO STATE & LOCAL WOODWORKING STANDARDS.
<br />A.
<br />WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DRAWINGS
<br />10, INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE &
<br />B.
<br />SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL NOTES
<br />8. CONTRACTOR SHALL BE RESPONSIBLE FOR BLOCKING OFF SUPPLY AND RETURN
<br />12.
<br />FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO
<br />LOCAL FIRE CODES.
<br />AND TYPICAL DETAILS
<br />AIR GRILLES, DIFFUSERS & DUCTS TO KEEP DUST FROM ENTERING INTO BUILDING
<br />FABRICATION,
<br />C.
<br />WORK NOT PARTICULARLY SHOWN OR SPECIFIED SHALL BE THE SAME AS
<br />AIR DISTRIBUTION SYSTEMS.
<br />11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION
<br />SIMILAR PARTS THAT ARE SHOWN AND SPECIFIED
<br />13.
<br />CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT
<br />EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE -PROTECTION
<br />D.
<br />WORK SHOWN AS "NIC" IS FOR REFERENCE ONLY AND THE RESPONSIBILITY OF
<br />9. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE
<br />APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY
<br />SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS
<br />THE CONTRACTOR ONLY TO THE EXTENT THAT THIS WORK MAY REQUIRE SOME
<br />SAFETY OF THE OCCUPANTS AND WORKERS AT ALL TIMES.
<br />OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK.
<br />SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION.
<br />REASONABLE PROTECTION OR COORDINATION EFFORTS.
<br />10, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SECURITY OF THE
<br />14.
<br />CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND
<br />12. LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN
<br />BUILDING AND SITE WHILE JOB IS IN PROGRESS AND UNTIL THE JOB IS
<br />IN -WALL SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS.
<br />ACCORDANCE WITH STATE & LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO
<br />COMPLETED.
<br />ALL FINAL INSTALLATION HEIGHTS FOR IN -WALL SUPPORT' BRACKETS MUST MEET
<br />THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY & EXACT LOCATION
<br />4.
<br />THESE PLANS AND SPECIFICATIONS ARE INTENDED TO REPRESENT ONLY THE
<br />ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS
<br />FROM FIRE DEPARTMENT PRIOR TO ORDERING.
<br />FINISHED CONSTRUCTION, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL
<br />INCLUDED.
<br />CONSTRUCTION AND DEMOLITION MEANS, METHODS, TECHNIQUES, SEQUENCES AND
<br />DRAWNNOTES:
<br />15.
<br />PROVIDE AND INSTALL ALL NECESSARY WALL BACKING, STIFFENERS, BRACING,
<br />13. AT LEAST ONE (1) FIRE EXTINGUISHER WITH A MINIMUM RATING OF:
<br />PROCEDURES INCLUDING ANY AND ALL SAFETY PRECAUTIONS AND PROGRAMS,
<br />BACK-UP PLATES AMID ✓ OR SUPPORTING BRACKETS AS REQUIRED FOR THE
<br />2-A-10B: C (FOR OFFICE), OR 10-A-80B: C (FOR WAREHOUSE), SHALL BE
<br />AND SHALL INDEMNIFY TO THE FULLEST EXTENT ALLOWED BY LAW THE OWNER
<br />1.
<br />UNLESS OTHERWISE NOTED OR INDICATED, ALL DIMENSIONS ON THESE DOCUMENTS
<br />INSTALLATION OF WALL -MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS.
<br />PROVIDED WITHIN MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE
<br />AND THE PROJECT DESIGN TEAM FROM AND AGAINST ANY AND ALL RELATED
<br />SHALL BE TO FACE OF CURB, FACE OF CONCRETE OR MASONRY, FACE OF FINISH
<br />VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY
<br />THEE
<br />FEET OR PORTION THEREOF ON EACH FLOOR
<br />CLAIMS AND LIABILITY.
<br />OR CENTERLINE OF GRIDS.
<br />CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL.
<br />14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS,
<br />5•
<br />THESE PLANS AND SPECIFICATIONS ARE INTENDED TO SET FORTH THE
<br />2.
<br />ALL VERTICAL DIMENSIONS SHOWN ARE FROM FLOOR SLAB, U.O.N.
<br />16.
<br />PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING
<br />FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL
<br />REQUIREMENTS FOR CONSTRUCTION IN ONLY AN INDUSTRY -STANDARD LEVEL OF
<br />COMPLY WITH STATE & LOCAL FIRE CODES. THE STORAGE AND USI_ OF
<br />QUALITY AND DETAIL, AND THEY ARE INTENDED TO BE SUPPLEMENTED BY
<br />3.
<br />DIMENSIONS SHOWN IN FIGURES TAKE PRECEDENCE OVER DIMENSIONS SCALED
<br />SUPPLY, FITTINGS &CONNECTORS COMPLETE INSTALLATION OF APPLIANCES &
<br />HAZARDOUS MATERIALS SHALL BE APPROVED BY THE FIRE AUTHORITY PRIOR TO
<br />APPROPRIATE REQUESTS FOR INFORMATION (RFIs). ERRORS AND OMISSIONS ARE
<br />FROM DRAWINGS. LARGE SCALE DRAWINGS .AND DETAILS TAKE PRECEDENCE OVER
<br />EQUIPMENT INDICATED ON PLAN. VERIFY REQUIREMENTS WITH MANUFACTURERS
<br />ANY MATERIALS BEING STORED OR USED ON SITE. A SEPARATE PLAN SUBMITTAL
<br />TO BE EXPECTED AND ANTICIPATED, AND ALL CONTRACTORS ARE REQUIRED TO
<br />SMALLER SCALE DRAWINGS.
<br />PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S
<br />IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS.
<br />CAREFULLY REVIEW THESE PLANS FOR ERRORS AND OMISSIONS AND TO BRING
<br />APPROVAL.
<br />THESE ERRORS AND OMISSIONS TO THE ATTENTION OF ,AN APPROPRIATE OWNER
<br />4.
<br />THE TERM "ALIGN", AS USED IN THESE DOCUMENTS, SHALL MEAN TO
<br />15, BUILDING(S) NOT APPROVED FOR HIGH -PIKED STOCK (MATERIALS IN CLOSELY
<br />REPRESENTATIVE IN A TIMELY MANNER; AND ANY CONTRACTOR WHO FAILS TO DO
<br />ACCURATELY LOCATE FINISHES IN THE SAME PLANE.
<br />17.
<br />EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH
<br />PACKED PILES OR ON PALLETS, OR 1N RACKS WHERE THE TOP OF STORAGEE
<br />SO BEFORE BIDDING OR OTHERWISE PROCEEDING ASSUMES THE RISK OF ANY
<br />ARCHITECT BEFORE INSTALLATION. PROVIDE ADDITIONAL FIRE EXTINGUISHERS &
<br />CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS,
<br />EXCEEDS 12'-0" IN HEIGHT, AND 6'-0" FOR GROUP "A" PLASTICS AND CERTAIN
<br />CONSEQUENCES.
<br />5.
<br />"TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE CONDITION IS
<br />OTHER HIGH -HAZARD COMMODITIES). HIGH -PILED STOCK SHALL BE APPROVED
<br />THE SAME OR REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT,
<br />18,
<br />CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR
<br />BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A
<br />6.
<br />c
<br />SCALED DIMENSIONS SHOULD BE CONSIDERED ONLY APPROXIMATE; AND !N ANY
<br />U.O.N.
<br />TO INSTALLATION.
<br />SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH -PILED STORAGE IN
<br />ACCORDANCE WITH STATE & LOCAL FIRE CODES.
<br />EVENT ALL CONTRACTORS PROCEED AT THEIR OWN RISK IF THEY FAIL TO VERIFY
<br />6.
<br />DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE, WHEN THEY
<br />19.
<br />ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL
<br />AND FIELD MEASURE DIMENSIONS BEFORE PROCEEDING WITH ANY AFFECTED
<br />PROCUREMENT, FABRICATION OR CONSTRUCTION.
<br />FIRST OCCUR AND ARE REPRESENTATIVE OF ALL SIMILAR CONDITIONS
<br />HAVE DIRECTIONAL EXIT SIGNS,
<br />16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR.
<br />THROUGHOUT; U.O.N.
<br />20.
<br />PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED
<br />17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY
<br />7.
<br />PLANS ARE TO BE CONSIDERED DIAGRAMMATIC IN NATURE AND INTENDED ONLY
<br />7.
<br />COLUMN CENTERLINES (GRID LINES) ,ARE SHOWN FOR DIMENSIONING PURPOSES.
<br />ON FINISH PLAN, ENLARGED FINISH PLANS & FINISH LEGEND.
<br />SHOWING THE SPECIFIC RATING.
<br />TO DEMONSTRATE THE RELATIONSHIP AMONG COMPONENT PARTS, AND NOT TO
<br />DEPICT SPECIFIC LOCATIONS..
<br />8.
<br />WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF
<br />21.
<br />UNLESS OTHERWISE NOTED, ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS
<br />18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING
<br />THE WORK, THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK IN
<br />SHALL BE TAPED, SANDED SMOOTH TO A "LEVEL 4" FINISH, SO AS TO RECEIVE
<br />AND FIRE CODES.
<br />8.
<br />CONTRACTOR RFI's ARE INTENDED TO OBTAIN INFORMATION NOT AVAILABLE FROM
<br />THE SAME BUILDING.
<br />PAINT OR WALL COVERING MATERIAL.
<br />19, EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY
<br />THE PLANS AND SPECIFICATIONS. RFI's WILL NOT BE PROCESSED THAT CAN BE
<br />9
<br />T I / TER CO NOTES.
<br />22.
<br />PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RESTROOMS, LOBBY,
<br />OR ANY SPECIAL KNOWLEDGE OR EFFORT.
<br />ANSWERED BY A REVIEW OF THESE DOCUMENTS, THAT REQUEST DIMENSIONS
<br />THAT CAN BE OBTAINED FROM THE PLANS BY MATHEMATICAL CALCULATION THAT
<br />STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC
<br />20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION
<br />ARE IN EFFECT A SUBSTITUTION SUBMITTAL, OR THIN SEEK DIRECTION
<br />1.
<br />WHERE ELECTRICAL, MECHANICAL AND/OR PLUMBING ITEMS, SUCH AS LIGHTS,
<br />ENVELOPE, U.O.N.
<br />SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FOR NORMS, STROBE
<br />CONCERNING CONSTRUCTION MEANS AND METHODS OR SAFETY PRECAUTIONS.
<br />DUCTS, PIPING, DOWNSPOUTS, ETC, ARE TO PENETRATE ANY BUILDING FOOTINGS,
<br />23.
<br />PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS
<br />LIGHTS, CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL
<br />WHERE APPROPRIATE, RFI's SHOULD BE SPECIFIC AS TO WHICH PORTION OF THE
<br />SLABS, FLOORS, STRUCTURAL FRAMING, WALL PARTITIONS, CEILINGS, ETC., IT IS
<br />AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED
<br />ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL.
<br />PLANS AND SPECIFICATIONS NEEDS CLARIFICATION, AND WHAT INFORMATION IS
<br />REQUIRED THAT AN APPROPRIATELY SIZED OPENING OR CLEARANCE BE
<br />REQUIRED.
<br />FURNISHED. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF ALL ITEMS
<br />OR RECESSED FURNISHINGS, RECEPTACLES, UTILITY PIPING, SHELF STANDARDS &
<br />WITH THE CONSTRUCTION DOCUMENTS PRIOR TO THE INSTALLATION OF
<br />ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE
<br />9.
<br />NO DEVIATIONS OR OMISSIONS FROM THE REQUIREMENTS OF THE PLANS AND
<br />STRUCTURAL, MECHANICAL, PLUMBING AND ELECTRICAL WORK. ANY CONFLICT OR
<br />DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE ANDRESTROOM
<br />SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING
<br />_�
<br />SPECIFICATIONS PROVIDED BY 'THE PROJECT'S DESIGN TEAM ARE ALLOWED
<br />DISCREPANCY WITHIN CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE
<br />WITHOUT THE EXPRESSED AUTHORIZATION OF AN APPROPRIATE OWNER
<br />ARCHITECT'S ATTENTION FOR CLARIFICATION
<br />FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH
<br />EXISTING FINISH TO PROVIDE CONSISTENT & CONTINUOUS FINISH.
<br />REPRESENTATIVE, AND THE RESPONSIBLE CONTRACTOR WILL INDEMNIFY AND HOLD
<br />HARMLESS THE OWNER AND THE PROJECT DESIGN TEAM FROM AND AGAINST THE
<br />2.
<br />CONTRACTOR, ALONG WITH MECHANICAL CONTRACTOR, SHALL PROVIDE AND
<br />CONSEQUENCES OF ANY UNAUTHORIZED DEVIATIONS OR OMISSIONS. SUBSTITUTION
<br />LOCATE ACCESS DOORS/PANELS IN WALL & CEILING CONSTRUCTION AS REQUIRED
<br />1. PROVIDE DRAIN WITH TRAP PRIMER FOR EACH RESTROOM IF THERE ARE TWO OR
<br />SUBMITTALS WILL BE CONSIDERED ONLY IF THE PROPOSED SUBSTITUTION
<br />TO PROVIDE ACCESS TO MECHANICAL, FIRE SPRINKLER, PLUMBING & ELECTRICAL
<br />MORE FIXTURES. SLOPE FLOOR TO DRAIN AT MIN. 1/8" PER FOOT.
<br />IMPROVES THE QUALITY OF THE PROJECT TO THE OWNER; AND IN NO EVENT WILL
<br />WORK, CONTRACTOR SHALL SUBMIT A PLAN OF ALL PROPOSED ACCESS PANEL_
<br />THE OWNER BE REQUIRED TO AUTHORIZE A SUBSTITUTION THAT IS NOT EQUAL IN
<br />LOCATIONS TO ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION.
<br />2. PROVIDE SINGLE LEVER HANDLE FAUCET SET AT 17" MAX. FROM THE FRONT EDGE
<br />QUALITY TO WHAT IS SPECIFIED.
<br />OF THE SINK COUNTER.
<br />3.
<br />ALL PENETRATIONS AT RATED CONSTRUCTION SHALL BE PROTECTED TO MAINTAIN
<br />10.
<br />DESIGN/BUILD CONTRACTOR SUBMITTALS WILL BE REVIEWED BY THE PROJECT
<br />RATING,
<br />3. VERIFY BUILDING STANDARD FOR WALL-HUNG/DROP-IN COUNTER SINK WHERE
<br />DESIGN TEAM, IF AT ALL, ONLY FOR CONFORMANCE WITH THE AESTHETIC
<br />APPLICABLE.
<br />ASPECTS AND MAJOR SPACE LIMITATIONS OF THE PROJECT; AND EACH
<br />4,
<br />WHERE OCCURS, CONTRACTOR SHALL PATCH ANY EXISTING WALLS AND/OR
<br />DESIGN/BUILD CONTRACTOR IS RESPONSIBLE FOR THE FOLLOWING:
<br />CEILINGS AS NEEDED TO REFURBISH THE LEASE SPACE AND REPAIR ALL
<br />4. TOILET PAPER DISPENSERS SHALL NOT BE OF TYPE THAT CONTROLS DELIVERY,
<br />DAMAGES CAUSED BY CONTRACTOR.
<br />OR THAT DO NOT ALLOW CONTINUOUS PAPER FLOW. OPERABLE PARTS SHALL BE
<br />A.
<br />PREPARING ALL THE ENGINEERING AND OTHER DRAWINGS AND SPECIFICATIONS
<br />OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING
<br />FOR THE COMPONENTS OF ITS DESIGN/BUILD UNDERTAKING.
<br />5.
<br />INTERIOR WALLS AND CEILINGS SHALL BE INSTALLED IN ACCORDANCE STATE
<br />OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS
<br />B.
<br />COMPLYING WITH THE PROJECT'S REQUIREMENTS AND SPACE LIMITATIONS.
<br />LOCAL_ CODES, INCLUDING REQUIREMENTS FOR FLAME SPREAD AND SMOOK
<br />SMOKE
<br />SHALL BE 5 POUNDS MAX.
<br />C.
<br />COORDINATION AND INTERFACING WITH OTHER TRADES AND CONSULTANTS.
<br />DENSITY RATINGS FOR FINISH MATERIALS,
<br />D.
<br />OBTAINING ANY REQUIRED OR APPROPRIATE APPROVALS FROM AUTHORITIES
<br />5. OPERABLE PARTS OF ALL ACCESSORIES SHALL COMPLY WITH ALL APPLICABLE
<br />HAVING JURISDICTION OVER THE PROJECT.
<br />6.
<br />WHEN USED, ALL NOISE BARRIER BATTS (SOUND INSULATION) AND INSULATION
<br />ACCESSIBILITY CODES AND STANDARDS.
<br />E.
<br />HAVING THEIR DESIGN CONSULTANTS SERVE AS THE PROFESSIONAL OF RECORD
<br />BATTS SHALL BE NON-COMBUSTIBLE AND SHALL NOT CONTAIN OR UTILIZE
<br />FOR THE PORTIONS OF WORK WHICH THEY DESIGN.
<br />OZONE DEPLETING COMPOUNDS.
<br />6. WATER SUPPLY AND DRAIN PIPES UNDER LAVATORIES AND SINKS SHALL BE
<br />INSULATED OR OTHERWISE CONFIGURED TO PROTECT AGAINST CONTACT. THERE
<br />11.
<br />AT THE CONCLUSION OF THE CONSTRUCTION, EACH PRIME CONTRACTOR SHALL
<br />7.
<br />ALL NEW CONSTRUCTION MATERIALS SHALL BE 100% ASBESTOS -FREE,
<br />SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES AND SINKS.
<br />PROVIDE SUCH WRITTEN CERTIFICATION THAT THE CONSTRUCTION HAS BEEN
<br />PERFORMED IN COMPLIANCE WITH THE PROJECT'S APPROVED PLANS AND
<br />DESIGN BUILD NOTES
<br />SPECIFICATIONS AS THE BUILDING OFFICIAL WITH JURISDICTION OVER THE PROJECT
<br />MAY REQUIRE, OR AS THE OWNER MAY REASONABLY REQUEST.
<br />12.
<br />VERSIONS OF THESE PLANS PROVIDED IN ANY ELECTRONIC FORM ARE SUBJECT
<br />TO THE SAME PROVISION AS THE OTHER INSTRUMENTS OF SERVICE PREPARED BY
<br />OR ON BEHALF OF THE PROJECT DESIGN TEAM, INCLUDING WITHOUT LIMITATION
<br />1. LIGHT SWITCHES SHALL BE INSTALLED AT +48" A.F.F. MULTIPLE SWITCHES
<br />THEIR COMMON LAW, STATUTORY OR OTHER RESERVED RIGHTS, INCLUDING
<br />SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED.
<br />COPYRIGHTS. A RECIPIENT IS GRANTED AT MOST A TRANSFERABLE
<br />NONEXCLUSIVE LICENSE TO REUSE THE PLANS SOLELY FOR PROJECT PURPOSES;
<br />2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS WITH THE ARCHITECT PRIOR TO
<br />AND NO RECIPIENT IS AUTHORIZED TO USE OR TO ALLOW THE USE OF ALL OR
<br />INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN.
<br />ANY PORTION OF THESE PLANS FOR ANY OTHER PURPOSE, AND ANY OTHER USE
<br />SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE
<br />FOR ANY OTHER PURPOSE COULD CONSTITUTE ACTIONABLE PLAGIARISM. ANY
<br />ONLY.
<br />ELECTRONIC DOCUMENTS WILL BE PROVIDED IN THE RESPONSIBLE DESIGN
<br />PROFESSIONAL'S STANDARD FORMATS AND CONVENTIONS AND WITH NO
<br />3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED
<br />GUARANTEE OF THE ABSENCE OF VIRUSES OR OTHER HARMFUL MATERIAL, OR OF
<br />LIGHT FIXTURES.
<br />COMPATIBILITY WITH ANY RECIPIENT'S SOFTWARE OR HARDWARE SO THAT ANY
<br />USE WITH OR CONVERSION TO THE OTHER FORMS OR CONVENTIONS, OR THE USE
<br />4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH
<br />WITH ANY PARTICULAR SOFTWARE OR HARDWARE, IS AT THE RECIPIENT'S SOLE
<br />CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS. CONTRACTOR SHALL BE
<br />RISK.
<br />RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF
<br />ROOF -MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION.
<br />Y
<br />z
<br />a
<br />Ls
<br />0
<br />r
<br />z
<br />Ld
<br />m
<br />W
<br />U
<br />z
<br />w
<br />0
<br />U
<br />0
<br />CK
<br />0
<br />a.
<br />m
<br />0
<br />0
<br />U
<br />a
<br />Ld
<br />a
<br />Ll
<br />0
<br />Ld
<br />U
<br />0
<br />z
<br />w
<br />0
<br />r
<br />r
<br />2
<br />D
<br />a
<br />m
<br />Ld
<br />m
<br />J
<br />a
<br />2
<br />U
<br />z
<br />LLj
<br />U
<br />z
<br />a
<br />0
<br />Ld
<br />z
<br />0
<br />0
<br />W
<br />Ld
<br />w
<br />m
<br />W
<br />0
<br />z
<br />a
<br />0
<br />z
<br />0
<br />W
<br />z
<br />W
<br />0
<br />W
<br />a
<br />U
<br />0
<br />U
<br />z
<br />0
<br />ui
<br />x
<br />a
<br />r
<br />Q
<br />2
<br />W
<br />z
<br />0
<br />z
<br />0
<br />17
<br />0
<br />3
<br />Ld
<br />Of
<br />9
<br />r
<br />z
<br />W
<br />m
<br />a
<br />r
<br />�n
<br />r
<br />U
<br />x
<br />Ld
<br />0
<br />r
<br />z
<br />a
<br />z
<br />0
<br />0
<br />Ld
<br />I
<br />D
<br />uj
<br />m
<br />r
<br />0
<br />z
<br />a
<br />cn
<br />z
<br />a
<br />m
<br />0
<br />a
<br />a
<br />0
<br />__
<br />0
<br />0
<br />0
<br />U
<br />z
<br />a
<br />Ld
<br />Ld
<br />a
<br />0
<br />a
<br />W
<br />co
<br />z
<br />0
<br />Ld
<br />U
<br />z
<br />a
<br />cn
<br />U
<br />z
<br />a
<br />Ld
<br />cn
<br />L'i
<br />2
<br />r
<br />°
<br />I
<br />°
<br />i
<br />0
<br />cv
<br />�o
<br />ui
<br />NO
<br />�_f a bjD
<br />N
<br />Nt
<br />u
<br />U
<br />0
<br />cc5 +� >
<br />M
<br />�+ •-�
<br />dA
<br />L6
<br />• 'U
<br />® _Q
<br />w
<br />SHEET
<br />a