<br />1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF LIGHT FIXTURES,
<br />SWITCHES, EXIT SIGNS, ETC.
<br />2. CONTRACTOR TO VERIFY COMPATIBILITY OF LIGHT FIXTURES WITH THE CEILING
<br />SYSTEM.
<br />3. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD OR
<br />ADJACENT EXISTING CONSTRUCTION -- SAME COLOR AND MANUFACTURER.
<br />4. FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY
<br />DISCREPANCIES ON PLANS,
<br />5. CONTRACTOR TO PROVIDE APPROPRIATE SIZED CUTOUTS ABOVE CEILINGS WHERE
<br />NON -RATED PARTITIONS EXTEND TO SLAB ABOVE AS NECESSARY FOR RETURN
<br />AIR CIRCULATION.
<br />6. WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES, AIR DIFFUSERS, GRILLES,
<br />ETC. OCCUR ON THE ELECTRICAL PLANS, THE ARCHITECTURAL PLANS SHALL
<br />GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR CLARIFICATIONS.
<br />7. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC. AND NOTIFY
<br />ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS ETC.
<br />8. PLACEMENT OF LIGHT FIXTURES IN AREAS INHERE MAIN DUCTS MAY CAUSE
<br />INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION.
<br />9. CONDUIT ABOVE CEILING MUST BE A MINIMUM OF 12" ABOVE THE CEILING GRID.
<br />10, NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING
<br />ALUMINUM FLEX, ALUMINUM CONDUIT AND POT METAL CONNECTORS.
<br />11. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR
<br />SERVICE SHALL BE LOCATED OVER ACOUSTICAL .CEILINGS. NO ACCESS HATCHES
<br />SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY
<br />ARCHITECT. (NO EXCEPTION).
<br />12. ALL SPRINKLER HEADS AT HARD -LID CEILINGS ARE TO BE FULLY RECESSED AND
<br />CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM
<br />ARCHITECTURAL PATTERN, G,C TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD
<br />LOCATIONS FOR ARCHITECT'S APPROVAL PRIOR TO INSTALLATION.
<br />13. ALL SPRINKLER HEADS PLACED IN WHITE CEILING TILE OR WHITE GYPSUM BOARD
<br />TO BE WHITE. ALL SPRINKLER HEADS IN COLORED CEILINGS ARE TO BE CUSTOM
<br />COLOR TO MATCH ADJACENT CEILING.
<br />14. LOCATE RECESSED DOWN LIGHTS, WALL WASHERS, SMOKE DETECTORS, EXIT SIGNS,
<br />SPEAKERS, FIRE SPRINKLERS, ETC. IN CENTER OF 24%24" CEILING TILES OR IN
<br />CENTER OF 24%24" PORTION OF 24%48" CEILING TILES. UNLESS OTHERWISE
<br />NOTED.
<br />15. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN AREAS AND PRIVATE OFFICES.
<br />ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED BY ARCHITECT.
<br />16. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR
<br />DUCTS PENETRATING FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS, FLOORS OR
<br />SURFACES, AS REQUIRED BY LOCAL CODES AND FIRE DEPARTMENT. REFER TO
<br />MECHANICAL ENGINEERING DOCUMENTS FOR SPECIFIC REQUIREMENTS.
<br />17. CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS,
<br />AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE
<br />CODES.
<br />18. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE
<br />FIXTURES COME IN DIRECT CONTACT WITH INSULATION,
<br />19. ALL EXIT SIGN LOCATIONS SHALL BE COORDINATED WITH THE ARCHITECT.
<br />20 EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES
<br />AND SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM (BATTERIES, UNIT
<br />EQUIPMENT OR AN ON -SITE GENERATOR) THAT WILL AUTOMATICALLY ILLUMINATE
<br />THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUTES.
<br />1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT.
<br />2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY (DISCREPANCY IN PLANS.
<br />FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES OR
<br />LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR.
<br />CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING
<br />PRODUCTS,
<br />3. INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION
<br />AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER, UNLESS
<br />OTHERWISE APPROVED OR NOTED.
<br />4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE
<br />WITH STATE & LOCAL CODES.
<br />5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN FLAME-RETARDANT CONDITION.
<br />6, SUBMIT THE FOLLOWING SAMPLES FOR ARCHITECT'S APPROVAL:
<br />a. THREE (3) 12" X 12" SAMPLES FOR ALL PAINT, WALL COVERING FINISHES
<br />AND COLORS APPLIED TO A SUBSTRATE WHICH IS REPRESENTATIVE OF THE
<br />SURFACE TO BE FINISHED. SUBMIT PAINT SAMPLES FROM THE PAINT LOT
<br />OR LOTS INTENDED FOR APPLICATION.
<br />b. ONE (1) 24" X 24" MOCK-UP WITH SAMPLE SEAM (CENTERED) OF ALL
<br />WALL COVERING FINISHES AND COLOR,
<br />C. THREE (3) 12" X 12" SAMPLES OF ALL FLOOR COVERING.
<br />d. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR/QUALITY
<br />CONTROL.
<br />7. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT AND
<br />SECURE APPROVAL BEFORE PLACING FULL ORDERS.
<br />8. SUBMIT SEAMING PLAN FOR CARPET TO ARCHITECT FOR APPROVAL PRIOR TO
<br />CARPET ORDER.
<br />9. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES.
<br />10. ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER
<br />ENCLOSURES, ETC. , SHALL BE SEMI -GLOSS, UNLESS NOTED OTHERWISE.
<br />11. WHERE PAINT COLORS CHANGE, CORNERS ARE TO BE CUT -IN FREE OF
<br />OVERLAPPING.
<br />12. PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE
<br />PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS.
<br />13. CONTRACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO AS TO RECEIVE
<br />NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE, CONTRACTOR IS
<br />RESPONSIBLE FOR ALL FLOOR PREPARATION.
<br />14, ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD, UNLESS NOTED
<br />OTHERWISE.
<br />15, ALL RESILIENT FLOORING TO BE INSTALLED WITH FULL TILE FROM THRESHOLD
<br />STRIP AND FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.N.O.
<br />16, PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING.
<br />17. CONTRACTOR SHALL PROVIDE PRE -FORMED RUBBER BASE CORNERS. DO NOT
<br />CUT OR BEND STRAIGHT BASE TO MAKE CORNERS.
<br />18. MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED
<br />ON MILLWORK DETAILS.
<br />19. FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN FLOOR" AREAS OF MILLWORK,
<br />INCLUDING SINK AREA AND AT ALL UNDER --COUNTER EQUIPMENT AREAS WHICH
<br />ARE OPEN TO THE FLOOR.
<br />20. FLOORS SHALL BE SLOPED TO FLOOR DRAINS. COORDINATE WITH PLUMBING AND
<br />STRUCTURAL DRAWINGS. IN RATED FLOOR CONDITIONS, CONFIRM REMAINING
<br />FLOOR THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT.
<br />21, CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW
<br />CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS
<br />WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR
<br />WARRANTIES AND ADHESIVE PRODUCTS.
<br />22. PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES.
<br />PATCH AND REPAIR SUB --FLOOR AS REQUIRED. PREPARE FLOORS AND
<br />TRANSITIONS AS REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPLICABLE
<br />BUILDING CODES.
<br />23. ALL FLOORING TRANSITIONS AMONG DIFFERING FLOORING MATERIAL ARE TO BE A
<br />FLUSH TRANSITION!, U.O.N.
<br />24. FEATHER SUB -FLOOR UP FOR TILE FLOORING TO CARPET CONDITIONS AND
<br />RESILIENT FLOORING TO CARPET CONDITIONS FOR FLUSH INSTALLATION(.
<br />25, NSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORING
<br />TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT
<br />FLOOR TYPES MEET, VERIFY COLOR WITH ARCHITECT.
<br />26, FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET
<br />INSTALLATION INSTRUCTIONS. USING ADHESIVES AND INSTALLATION METHOD TO
<br />MAINTAIN PRODUCT'S WARRANTY. CONTACT CARPET SALES REPRESENTATIVE
<br />WITH QUESTIONS PRIOR TO PROCEEDING
<br />27. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED
<br />RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION
<br />METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY.
<br />28. FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMAL SEAMS/JOINTS AT
<br />ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE
<br />LOW VOC, BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC,
<br />CARTS AND TO MAINTAIN PRODUCT'S WARRANTY
<br />29. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY
<br />AS 1-0 LEAVE NO EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW AND NAIL
<br />HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE TAPED AND
<br />COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED TO BE SANDED
<br />SMOOTH AND DUST REMOVED PRIOR TO RECEIVING NEW PAINT FINISH
<br />APPLICATION.
<br />30. PRIOR TO PAINTING OVER WALL COVERING, SECURELY GLUE DOWN ANY LIFTING
<br />OR BUCKLING AND HIDE ALL SEAMING OR BUMPS.
<br />31. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF
<br />SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH
<br />TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABILITY. VERIFY ALL
<br />WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT.
<br />32. PAINT ANY UNFINISHED SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD
<br />WALLS AND CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED.
<br />33. ALL EXPOSED MECHANICAL, ELECTRICAL, PLUMBING AND FIRE PROTECTION
<br />DUCTWORK AND PIPING IS TO BE PAINTED TO MATCH THE CEILING.
<br />34. ALL NEWLY INSTALLED, PATCHED WORK AND ALL AFFECTED AREAS SHALL BE
<br />PAINTED, ALL PAINTING WORK SHALL BE PERFORMED TO COVER THE ENTIRE
<br />HORIZONTAL OR VERTICAL SURFACE TO THE CLOSEST CORNER IN ALL FOUR
<br />DIRECTIONS.
<br />35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE, WALLS MUST BE
<br />PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND
<br />ALIGNED, SO, AS TO LEAVE NO EVIDENCE OF PATCHING OR REPAIRS, ALL
<br />SCREW AND NAIL HEADS MUST BE SET AND SPACKLED. ALL JOINTS MUST BE
<br />TAPED AND COVERED WITH JOINT COMPOUND. JOINTS THAT ARE FILLED ARE TO
<br />BE SANDED SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING
<br />MORTAR BED/BOND COAT AND WALL TILES.
<br />36. ALL WALL TILES ARE TO HAVE A MORTAR BED/BOND COAT THICKNESS TO
<br />ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE
<br />SPECIFIED FOR WALL INSTALLATION WITH A FLUSH FRONT FACE.
<br />37. ALL TRANSLUCENT GLASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE
<br />BY BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING.
<br />38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH,
<br />HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH
<br />WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS
<br />SPECIFIED IN FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND
<br />UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES.
<br />39. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER
<br />CLOSETS SHALL HAVE A SMOOTH, HARD, NONABSORBENT SURFACE TO A HEIGHT
<br />OF NOT LESS THAN 4 FEET ABOVE THE FLOOR.
<br />1. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA
<br />SUPPLIED BY THE OWNER TO THE ARCHITECT, THE ARCHITECT MAKES NO
<br />WARRANTY, EITHER EXPRESS OR IMPLIED, FOR THE ACCURACY OF THE
<br />COMPLETENESS OF THE EXISTING INFORMATION RECORDED. THE CONTRACTOR
<br />SHALL FIELD VERIFY ,ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT
<br />IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS THAT MIGHT ARISE IN THE
<br />COURSE OF THE DEMOLITION WORK,
<br />2. VERIFY LOCATIONS OF EXISTING MECHANICAL, PLUMBING AND ELECTRICAL
<br />UTILITIES. LOCATE AND PROTECT UTILITIES TO REMAIN. DISCONNECT, REMOVE
<br />BACK TO NEAREST JUNCTION BOX OR PANEL, AS REQUIRED, AND CAP
<br />DESIGNATED UTILITIES WITH( T DEMOLITION
<br />N THE DEM L TION AREA. REFER TO THE
<br />MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFO,
<br />3. EXISTING ELECTRICAL AND TELEPHONE OUTLETS LOCATED ON DEMOLISHED WALLS
<br />ARE TO BE REMOVED INCLUDING CONDUIT AND WRING BACK TO JUNCTION BOX.
<br />LOCATIONS ARE TO BE PATCHED AND REPAIRED TO BE FLUSH WITH ADJACENT
<br />WALL SURFACE,
<br />4. WHERE PLUMBING FIXTURES ARE BEING REMOVED OR WHERE EXPOSED PLUMBING
<br />PIPES OCCUR, CAP LINES BEHIND FINISHED SURFACES. PATCH AND REPAIR AS
<br />REQUIRED.
<br />5. ALL EXISTING CONSTRUCTION WHERE INDICATED INCLUDING ELECTRICAL,
<br />TELEPHONE, PLUMBING AND MECHANICAL DEVICES NOT OTHERWISE INDICATED ON
<br />THESE CONSTRUCTION DRAWINGS SHALL BE REMOVED IN A CAREFUL MANNER SO
<br />AS NOT TO DAMAGE ADJOINING CONSTRUCTION.
<br />6, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING
<br />UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM
<br />DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR
<br />REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN
<br />CONJUNCTION WITH THE EXECUTION OF HIS WORK.
<br />7. ALL EXISTING BUILDING UTILITIES SHALL REMAIN IN OPERATION DURING
<br />CONSTRUCTION. PROVIDE REROUTING OF UTILITIES SERVING ADJACENT AREAS
<br />THAT ARE TO MAINTAIN UNINTERRUPTED SERVICE, ANY TEMPORARY SUSPENSION
<br />OF SERVICE SHALL BE COORDINATED AND APPROVED BY THE FACILITY MANAGER,
<br />NOT LESS THAN 24-HOURS IN ADVANCE.
<br />8. THE CONTRACTOR WILL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL
<br />UTILITY COMPANIES UNLESS OTHERWISE NOTED IN THE PLANS AND
<br />SPECIFICATIONS.
<br />9, THE DEMOLITION PLAN KEYNOTES ARE DIAGRAMMATIC AND GENERAL IN NATURE.
<br />THE INTENT IS TO ILLUSTRATE THE COMPLETE DEMOLITION OF THE SPACES
<br />INDICATED UNLESS NOTED OTHERWISE. FIELD VERIFICATION OF EXISTING
<br />CONDITIONS AND SPECIFIC QUANTITIES IS THE RESPONSIBILITY OF THE
<br />CONTRACTOR.
<br />10. REMOVAL AND DISPOSAL OF DEMOLITION DEBRIS IS THE RESPONSIBILITY OF THE
<br />CONTRACTOR. VERIFY THE HAULING ROUTE THROUGH THE BUILDING, THE
<br />DEMOLITION STAGING AREA, AND THE LOCATION OF THE DUMPSTERS WITH THE
<br />OWNER PRIOR TO THE START OF DEMOLITION. DISPOSAL OF RUBBISH SHALL BE
<br />DONE IN A LEGAL MANNER.
<br />11. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY DEMOLISHED ITEM. VERIFY
<br />ITEMS TO BE SALVAGED WITH THE OWNER PRIOR TO THE START OF DEMOLITION.
<br />REMOVE, PROTECT, CLEAN, REPAIR FOR REUSE AND TURN OVER SUCH ITEMS AS
<br />DIRECTED BY THE OWNER.
<br />12. IN ORDER TO INSTALL SOME OF THE NEW WORK (INCLUDING, BUT NOT LIMITED
<br />TO MECHANICAL, PLUMBING OR ELECTRICAL) IT WILL BE NECESSARY FOR THE
<br />CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE (OR
<br />REFINISH) EXISTING WALLS, FLOORS, OR CEILING IN THE AREAS OF THE BUILDING
<br />NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED
<br />COSTS IN HIS BASE BID, WHETHER SHOWN ON THESE PLANS OR NOT.
<br />13, PROTECT ADJACENT SPACES NOT SCHEDULED FOR DEMOLITION. PATCH AND
<br />REPAIR DAMAGED FINISHES, ITEMS AND FIXTURES TO REMAIN AND/OR REPLACE
<br />IN KIND TO MATCH EXISTING FROM DAMAGE DURING THE PROGRESS OF THE
<br />WORK, PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE AND AS
<br />INDICATED TO INSURE PUBLIC SAFETY AND TO ALLOW BUILDING OCCUPANCY.
<br />CONTRACTOR TO SUBMIT FOR APPROVAL, BARRIER LOCATIONS, AND METHOD OF
<br />CONSTRUCTION TO THE ARCHITECT PRIOR TO INSTALLATION.
<br />14. NO STRUCTURAL ELEMENTS ARE INCLUDED IN THIS SCOPE OF WORK.
<br />15. PROVIDE DUST BARRIERS AROUND OPENINGS, TO AND FROM THE CONSTRUCTION(
<br />AREA. PROVIDE ALL MEANS NECESSARY TO INHIBIT DUST FROM ENTERING
<br />OTHER PORTIONS OF THE FACILITY. SUBMIT BARRIER LOCATIONS TO THE
<br />ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION(.
<br />16. PROVIDE ADEQUATE SHORING, BRACING, BARRICADES AND PROTECTIVE MEASURES
<br />AS REQUIRED TO SAFELY EXECUTE THE WORK IN THE CONSTRUCTION AREA AND
<br />THE AREAS ADJACENT TO THE CONSTRUCTION AREA. CEASE OPERATIONS AND
<br />NOTIFY THE ARCHITECT IMMEDIATELY IF THE STRUCTURE APPEARS TO BE
<br />ENDANGERED, DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEASURES HAVE
<br />BEEN TAKEN.
<br />17, CONTRACTOR SHALL MAINTAIN REQUIRED MEANS OF EGRESS AND ENSURE THAT
<br />EXIT ROUTES ARE SIGNED, LIGHTED AND PROTECTED IN ACCORDANCE WITH CODE
<br />REQUIREMENTS. RELOCATE EXISTING AND/OR PROVIDE SMOKE PROTECTORS AND
<br />LIFE SAFETY EQUIPMENT FOR ADEQUATE COVERAGE,
<br />18. PROVIDE TEMPORARY NON-COMBUSTIBLE CONSTRUCTION BARRIERS WHERE
<br />REQUIRED BY CODE AND THE GOVERNING FIRE AUTHORITY. MINIMUM
<br />REQUIREMENTS:
<br />A. FULL HEIGHT WALL FROM FLOOR TO CEILING.
<br />B. STUDS AT 24" O.C., WITH 5/8" TYPE 'X' GYPSUM BOARD.
<br />C. NON-COMBUSTIBLE ACCESS DOOR WITH (3) HINGES AND SPRING CLOSER.
<br />19. SURVEY EXISTING FLOORS AND CLEARLY MARK ON FLOOR SURFACE THE
<br />LOCATIONS OF ALL BEAMS AND JOISTS. MARK ALL CORE DRILL PENETRATIONS
<br />AND RECEIVE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO DRILLING CONCRETE.
<br />20. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL. PNEUMATIC TOOLS
<br />ARE NOT ALLOWED WITHOUT PRIOR APPROVAL.
<br />21. ALL CORE DRILLING OR OTHER NOISY WORK SHALL BE SCHEDULED 48-HOURS IN
<br />ADVANCE WITH THE OWNER.
<br />22. APPLY CEMENT BASE FLOOR PATCH AS REQUIRED TO FILL DINGS, NAIL HOLES,
<br />CHIPS AND CRACKS.
<br />23, AT FLOOR AREAS SCHEDULED TO RECEIVE NEW FLOOR COVERING, REMOVE
<br />EXISTING FLOOR COVERING AND PREPARE SUBSTRATE FOR NEW FLOOR COWERING
<br />PER SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS.
<br />24. AT ABANDONED PENETRATIONS OF FIRE RATED WALLS, CEILING OR FLOOR
<br />CONSTRUCTION, COMPLETELY SEAL VOIDS WITH FIRE RATED MATERIAL TO FULL
<br />THICKNESS OF THE PENETRATED ELEMENT. ALL PATCHING OF EXISTING WORK TO
<br />REMAIN SHALL MATCH FINISH PER SCHEDULE OR WHERE UNSCHEDULED TO
<br />MATCH EXISTING FINISHES TO REMAIN, AND SHALL MEET OR EXCEED FIRE RATING
<br />INDICATED ON FLOOR PLAN AND AS REQUIRED BY THE FIRE/LIFE SAFETY
<br />INSPECTOR.
<br />25. COORDINATE EXISTING SPRINKLER LINE AND HEAD LOCATION WITH NEW PLAN.
<br />SUBMIT SPRINKLER SHOP DRAWINGS TO ARCHITECT FOR REVIEW WITH THE CITY
<br />FIRE DEPARTMENT.
<br />26. CONTRACTOR IS RESPONSIBLE FOR BUILDING SECURITY DURING DEMOLITION
<br />PHASE. PROTECT ALL OPENINGS FROM WEATHER CONDITIONS AND SECURE THEM
<br />TO PREVENT VANDALISM.
<br />27, DO NOT PERFORM ANY WORK THAT WILL VOID WARRANTIES OF EXISTING
<br />WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS WITHOUT PRIOR
<br />APPROVAL FROM THE OWNER.
<br />28. ARCHITECT ASSUMES NO RESPONSIBILITY RELATING TO ANY TOXIC MATERIALS,
<br />INCLUDING ASBESTOS, AND ASSUMES NO RESPONSIBILITY TO ITS EXISTENCE OR
<br />REMOVAL, THE OWNER WILL TAKE ACTION FOR DIRECTLY CONTRACTING WITH A
<br />CONSULTANT OR SPECIALIST, LICENSED BY THE STATE, FOR SUCH SERVICES
<br />SHOULD THOSE SERVICES BE REQUIRED ON THE PROJECT.
<br />29. IF THE EXISTING BUILDING CONSTRUCTION IS CLASSIFIED SUCH THAT
<br />FIREPROOFING INSULATION IS PRESENT, THEN THE CONTRACTOR, PRIOR TO
<br />STARTING ANY WORK, SHALL VERIFY THE CURRENT FIRE -RESISTANCE RATING(S)
<br />OF THE EXISTING BUILDING ELEMENT(S). IF THE EXISTING FIREPROOFING
<br />INSULATION IS DAMAGED/AFFECTED DURING THE COURSE OF THE WORK, AS
<br />DEFINED BY THIS PROJECT SCOPE, THEN THE CONTRACTOR SHALL PATCH/REPAIR
<br />THE FIREPROOFING INSULATION TO A CONDITION THAT SHALL MATCH OR EXCEED
<br />THE ORIGINAL FIRE -RESISTANCE RATINGS) OF THE EXISTING BUILDING
<br />ELEMENT(S).
<br />30. CONTRACTOR TO RELOCATE AND REUSE EXISTING DOORS AND HARDWARE WHERE
<br />POSSIBLE.
<br />31. EXISTING DOORS TO REMAIN U.O.N.
<br />32. ALTERNATE CONSTRUCTION WASTE DISPOSAL -RECYCLING OF ACOUSTICAL TILES
<br />A. CEILING MATERIAL BEING RECLAIMED MUST BE KEPT DRY AND FREE FROM DEBRIS.
<br />B. BEFORE DISPOSING OF CEILINGS, CONTACT THE ARMSTRONG RECYCLING CENTER
<br />AT 877-276-7876, SELECT OPTION #4 TO TALK TO A CONSULTANT, THEY WILL
<br />VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MELTS THE ARMSTRONG
<br />REQUIREMENTS FOR RECYCLING. CONSULTANT WILL PROVIDE ASSISTANCE TO
<br />FACILITATE THE RECYCLING OF CEILING MATERIAL,
<br />1. CONTRACTOR MUST NOTIFY BUILDING OWNER/MANAGER OF ANY DISCREPANCY IN
<br />PLANS. FINISH ITEMS CLEARLY SHOWN IN PLANS, BUT OMITTED FROM SCHEDULES
<br />OR LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR.
<br />CONTRACTOR TO VERIFY OMITTED FINISHES WITH BUILDING OWNER/MANAGER
<br />PRIOR TO ORDERING PRODUCTS,
<br />2. SHOP DRAWINGS MUST BE PROVIDED FOR APPROVAL PRIOR TO FABRICATION ANY
<br />SUBSTITUTIONS MUST BE APPROVED BY THE ARCHITECT PRIOR TO FABRICATION.
<br />3. MILLWORKER TO COORDINATE & VERIFY WITH CONTRACTOR FINAL LOCATION FOR
<br />CANTILEVERED COUNTERS FOR IN -WALL SUPPORT BRACKETS, PRIOR TO GYPSUM
<br />BOARD FINISHING OF WALLS. ALL FINAL INSTALLATION HEIGHTS FOR IN -WALL
<br />SUPPORT BRACKETS MUST MEET ALL APPLICABLE ACCESSIBILITY CODES AND
<br />STANDARDS WITH COUNTERTOP MATERIAL THICKNESS INCLUDED.
<br />4. MATERIAL COLORS NOT LISTED SHALL BE REQUESTED FROM THE ARCHITECT ON
<br />SHOP DRAWING SUBMITTALS OR VIA RFIs,
<br />5. ALL UPPERS TO BE LAMINATED TO MATCH BASE CABINETS. BOTH UPPERS
<br />LOWER CABINETS IN WET AREAS TO HAVE MATCHING PVC EDGE, ALL OTHERS TO
<br />HAVE PLASTIC LAMINATE EDGE BANDING U.O.N.
<br />6. ALL CABINETS AND DOORS SHALL BE CONSTRUCTED FROM 3/4" THICK MATERIAL,
<br />U.O.N. ON DETAILS.
<br />7. BASE CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED ON FINISH
<br />PLANS OR ELEVATIONS,
<br />8. ALL INTERIORS OF CLOSED CABINETS TO BE WHITE MELAMINE/POLYESTER OR
<br />APPROVED EQUAL, UNLESS OTHERWISE SPECIFIED.
<br />9, ALL OPEN CABINETS OR SHELVES TO HAVE PLASTIC LAMINATE TO MATCH
<br />EXTERIORS.
<br />10. NO 3/4" THICK SHELF SHALL SPAN LONGER THAN 32" WITHOUT SUPPORT.
<br />11. ALL SHELVING TO BE ADJUSTABLE UNLESS OTHERWISE SPECIFIED,
<br />12. ALL FILE PEDESTALS ARE TO BE CONFIGURED FOR "FRONT TO BACK" FILING AND
<br />BE ABLE TO ACCEPT METAL HANGERS TO ACCEPT PENDAFLEX TYPE FILE
<br />FOLDERS, UNLESS NOTED AS LATERAL.
<br />13, ALL COUNTER TOPS TO BE 24" DEEP, UNLESS OTHERWISE SPECIFIED. WHERE NO
<br />BACKSPLASH IS SPECIFIED, COUNTER TOPS TO BE SCRIBED TIGHTLY TO BACK &
<br />SIDE WALLS.
<br />14. ALL BACKSPLASHES TO BE SCRIBED TO WALLS, AND MUST BE FLUSH TO EDGE
<br />OF BASE, UNLESS OTHERWISE SPECIFIED. ALL COUNTER TRANSITION SEAMS MUST
<br />BE CAULKED SEALED, VERIFY EITHER MATCHING COLOR CAULK OR CLEAR
<br />SILICONE.
<br />15. PROVIDE SIDE SPLASHES AT LOCATIONS ADJACENT TO WALLS OR WINDOWS,
<br />ESPECIALLY FOR SINKS U.O.N.
<br />16. FACES OF PIGEONHOLES TO MATCH WORK SURFACE LAMINATE. COLOR OF EDGE
<br />BANDING ON ALL DOORS TO MATCH FACE MATERIAL.
<br />17. IF PROVIDED, SEE SPECIFICATIONS/PROJECT MANUAL FOR ADDITIONAL
<br />REQUIREMENTS.
<br />18, COUNTERTOPS SHALL HAVE A NOSING OF COUNTERTOP MATERIAL AT LEAST 3"
<br />DEEP, WHEREBY THE COUNTER MATERIAL EXTENDS INTO THE INSIDE OF THE
<br />CABINET, I.E. OVER THE DOOR (WHEN PRESENT).
<br />19. END PANELS AND FRONT EDGES OF EDGE PANELS WHICH ARE PROUD OF THE
<br />INTERIOR CABINET SHALL BE FACED TO MATCH DOOR FRONTS.
<br />20. ALL HINGED DOORS TO HAVE CLEAR SILENCERS TOP AND BOTTOM ON DOOR (NOT
<br />CABINET).
<br />21. ALL DRAWERS GLIDES SHALL HAVE SILENCERS BUILT INTO THE GLIDE AND NOT
<br />INSTALLED ON THE DRAWER OR DRAWER FRONT.
<br />22. ALL DRAWER GLIDES SHALL BE FULL EXTENSION(.
<br />23. PROVIDE FULL OVERLAY HINGES THAT OPEN ±105 EXCEPT WHERE CABINETS ARE
<br />ADJACENT TO THE WALLS. PROVIDE HINGES WHICH LIMIT THE DOOR SWING TO
<br />KEEP THE DOOR PULL FROM DAMAGING THE WALL.
<br />y
<br />z
<br />4
<br />U-
<br />0
<br />I`-
<br />z
<br />ui
<br />2
<br />ui
<br />U
<br />z
<br />Ld
<br />0
<br />U
<br />0
<br />0
<br />x
<br />a
<br />ro
<br />m
<br />0
<br />0
<br />x
<br />0
<br />U
<br />0
<br />z
<br />LJ
<br />F
<br />0
<br />F-
<br />x
<br />0
<br />a
<br />0
<br />x
<br />m
<br />m
<br />�c
<br />v
<br />z
<br />Ld
<br />Ld
<br />0
<br />a
<br />r
<br />z
<br />a
<br />t
<br />a
<br />0
<br />Ld
<br />z
<br />z
<br />0
<br />a
<br />Ld
<br />u_
<br />cr
<br />ui
<br />Ld
<br />ca
<br />a
<br />z
<br />z
<br />A
<br />z
<br />0
<br />Ld
<br />M
<br />a
<br />0
<br />W
<br />cn
<br />x
<br />0
<br />U
<br />z
<br />w
<br />U
<br />a
<br />H
<br />x
<br />z
<br />0
<br />U)
<br />z
<br />W
<br />0
<br />v
<br />ry
<br />�c
<br />F-
<br />z
<br />w
<br />a
<br />w
<br />w
<br />0
<br />r
<br />F_
<br />c
<br />ui
<br />0
<br />w
<br />W
<br />y
<br />EY
<br />w
<br />x
<br />0
<br />a-
<br />z
<br />a
<br />V
<br />Ld
<br />as
<br />�n
<br />0
<br />z
<br />a
<br />z
<br />4
<br />Lm
<br />m
<br />0
<br />0
<br />bi
<br />0
<br />C2
<br />0-
<br />0
<br />U
<br />a
<br />z
<br />Lu
<br />W
<br />0
<br />CL
<br />W
<br />z
<br />0
<br />d
<br />0
<br />Ld
<br />a
<br />a
<br />z
<br />0
<br />�c
<br />a
<br />W
<br />cn
<br />i
<br />F-
<br />ce
<br />E
<br />0
<br />c�9
<br />o
<br />v b,0
<br />"o
<br />so,
<br />41
<br />N NO
<br />a;
<br />>
<br />o
<br />•�
<br />a
<br />.
<br />bad 'v
<br />o a�
<br />n
<br />�� w
<br />to
<br /><�
<br />w
<br />of
<br />I
<br />0
<br />ILL-m
<br />N
<br />0
<br />LAJ N
<br />0
<br />PA /
<br />PM: L. LUCERO
<br />DRAWN BY: D.S.
<br />JOB NO.: SEA21-6033-00
<br />SHEET
<br />
|