Laserfiche WebLink
designGOVERNING CODE: The and construction of this project is governed by the "international Build- <br />ing Code (KBC)~, 2015 Edition, hereafter referred to as the 1BC, as adopted and modified by the City ofEv- <br />enatt.understood tobethe Authority Having Jurisdiction (AHJ). <br />STANDARDS.REFERENCE Refer to Chapter 35 of 2015 UIBCWhere other Standards are noted in the <br />dnewings, use the latest edition of the standard unless a specific dote is indicated. Reference to a specific <br />section in a code does not relieve the contractor from compliance with the entire standard. <br />DEFIN11TIONS: The following definitions cover the meanings of certain terms used in these notes: <br />"Arch itect/Eng inee r"—TheArchihaotofReoord and the Structural Engineer ofRecord. <br />" "Structural Engineer of Record" (SER) —The structural engineer who is licensed to stamp & sign <br />the structural documents for the project. The SER is responsible for the design of the Primary Struc- <br />tural System. <br />* "Submit for meview" Submit to the Arch iteoUEngineerfor review prior to fabrication or construction. <br />w "Per Plan" —Indicates references tothe structural p|ano, elevations and structural general notes, <br />* "Bidder -designed" — Components of the structure that require the general oontractor, subcontrac- <br />tor, or supplier who is responsible for the design, fabrication and installation of specialty -engineered <br />elements identified in the Contract Documents to retain the services of an SSE Submittals of <br />"Biddar-desi8ned''elements shall bestamped and signed bythe SSE. <br />SPECIFICATIONS-. Refer to the project specifications issued as part of the contract documents for infor- <br />mation supplemental tothese drawings. <br />DRAWINGS:OTHER Refer to the architectural, mechanice|, e|eotrioa|, civil and plumbing drawings for addi- <br />tional information including but not limited to� dimensiona, e|evationa, s|opes, door and window openings, <br />non -bearing waUa, staira, finiehea, drainm, vvoterproofing, nei|inga, mechanical unit |omatione, and other non- <br />structural items. <br />STRUCTURAL DETAILS. The structural drawings are intended to show the general character and extent of <br />the project and are not intended to show all details of the work. Use entire detail sheets and specific details <br />referenced in the plans as "typical" wherever they app|y. Simi|ar|y, use details on entire sheets with "typical" <br />inthe name wherever they apply. <br />STRUCTURAL RESPONSIBILITIES-. The structural engineer (SER) is responsible for the strength and sta- <br />bility of the primary structure in its completed form <br />The Contractor is responsible for coordinating details and accuracy of the work- for con- <br />firming and correlating all quantities and dimeneiona� for selecting fabrication processes; for techniques of <br />assembly; and for performing work inasafe and secure manner. <br />EXISTING CONDiTIONS. Information shown on the drawings related to existing conditions represent the <br />present knnw|edge, but without guarantee of accuracy. Report conditions that conflict with contract docu- <br />ments to the architect or SEOB. Do not deviate from the contract documents without written direction from <br />the architect and/or SEOR. All existing dimensions and information shall be field verified prior to fabrication <br />as required tocoordinate with new construction. <br />NEW CONSTRUCTiON: The contractor shall remove all interfering items for new construction and shall re- <br />pair or replace all removed items to match the existing conditions in accordance with the architectural draw- <br />ings. New construction elements shall be designed and installed per current International Building Code <br />2015. hereafter referred to as IBC as allowed by |EBC. <br />MEANS, METHODS and SAFETY REQUIREMENTS: The contractor is responsible for the means and <br />methods of construction and all job -related safety standards such as OSHA and O[]BH (Department ofOc- <br />cupational Safety and Hea|th) The contractor is responsible for means and methods of construction related <br />to the intermediate structural conditions (i.e. movement of the structure due to moisture and thermal effects; <br />construction aequenoe�temporary bracing, oto). <br />BRACINGISHORING DESIGN ENGINEER: The contractor shall at his discretion employ an SSE, a regis- <br />tered professional engineer for the design of any temporary bracing and shoring. <br />TEMPORARY SHORING, BRACING: The contractor is responsible for the strength and stability of the struc- <br />ture during construction and shall provide temporary ohoring, bracing and other elements required to main- <br />tain stability until the structure is complete. it is the contractor's responsibility to be familiar with the work re- <br />quired in the construction documents and the requirements for executing it properly. <br />LOADS:CONSTRUCTION Loads on the structure during construction shall not exceed the design loads as <br />noted in DESIGN CRITERIA & LOADS be|nvv or the capacity of partially completed construction as deter- <br />mined by the Contractor's SSE for Bracing/Shoring <br />CHANGES IN LOADING: The contractor has the responsibility to notify the SER of any arohiteotura|, me- <br />ohanioe|, e|eotrioe|, or plumbing load imposed onto the structure that differs from, or that is not documented <br />on the original Contract Documents (architectural /structura| /mechanioa| /e|entrico| or plumbing drawings). <br />Provide documentation of location, |oad, size and anchorage of all undocumented loads in excess of 200 <br />pounds. Provide marked -up structural plan indicating locations of any new equipment or loads.Submit plans <br />to the Arch iioct/Enginoerfor review prior to installation. <br />PRIORITIES:NOTE Plan and detail notes and specific loading data provided on individual plans and detail <br />drawings supplements information inthe Structural General Notes. <br />DISCREPANCIES: In case of discrepancies between the General Woteo, Specifications, Plans/Details or <br />Reference Standards, the Arch iteot/Engine*r shall determine which oho|| govern. Discrepancies shall be <br />brought to the attention of the Arch iteot/Engineer before proceeding with the work. Should any discrepancy <br />be found in the Contract Documents, the Contractor will be deemed to have included in the price the most <br />expensive way of completing the vvork, un|ooa prior to the submission of the price, the Contractor asks for <br />decision from the Architect astowhich shall govern Aucording|y, any conflict in or between the Contract <br />Documents shall not beabasis -for adjustment inthe Contract Price. <br />SITE VERIFICATION: The contractor shall verify all dimensions and conditions at the site. Conflicts between <br />the drawings and actual site conditions shall be brought to the attention of the Arch itect/Eng i neer before pro- <br />ceeding with the work. <br />ADJACENT UTILITIES: The contractor shall determine the location of all adjacent underground utilities prior <br />toearthwork, foundations, shoring, and excavation. Any utility information shown onthe drawings and details <br />ieapproximate and not necessarily complete. <br />ALTERNATES: Alternate products ofsimilar strength, nature and form for specified items may be submitted <br />with adequate technical documentation (proper teat report, etc.) to the Arch ibaoUEnginaer for review. Alter- <br />nate materials that are submitted without adequate technical documentation orthat significantly deviate from <br />the design intent of materials specified may be returned without review. Alternates that require substantial <br />effort toreview will not bereviewed unless authorized bythe Owner. <br />Additionu, o|terationo, and/or repairs to the existing structure has <br />been analyzed for additional loading and/or modification due to the eddidon, the alteration or the repair. All <br />affected existing member have been analyzed or reinforced as required per IEBC. <br />All Demolition or removal of arohiteotura|, mechanical or structural elements shall not damage structural <br />items to remain, <br />DESIGN CMTEMA AND LOADS <br />ANCYRisk Category of Building per 2015 IBC Table 1604.5 111 <br />WIND DESIGN: <br />MAIN Wl]ND FORCE RESISTING SYSTEM <br />Ultimate Design Wind Speed, VULT (MPH) <br />�11 15 ,�nA A <br />Exposure Category <br />g-0, <br />Internal Pressure Coefficient cpi <br />+/-0.18 <br />Topographic Factor Kzt <br />1.0 <br />Wind Analysis procedure used: <br />Directional <br />IS 0- NA PT R[C VUP �A/ P'l AN N/IFr�Af' <br />with h>GOft. <br />2) Components and Cladding zone locations are based onASCE7-1DTable 3O.7'2 for Flat Roofs 8 < <br />1Ddeg. <br />3) For parapets around the perimeter of the roof equal to or higher than 3 ft, Zone 3 shall be treated as <br />Zone 2. <br />4) All Parapet Components and Cladding Wind Pressures shall be determined through ASCE 7'10 Fig- <br />una3O.7'1. <br />SEISMIC <br />Seismic Design Category- SDC = <br />D <br />Basic Structural System <br />Bearing Wall] <br />Seismic Force Resisting System <br />CMU Shear WaIlls <br />System Over Strength Factor Omega <br />2.5 <br />Deflection Amplification Factor Cd <br />3.5 <br />Seismic Importance Factor per ASCE 7-10 Table 1.5-2 ie <br />1.25 <br />Spectral Response Acceleration (Short Period) S, <br />1.414 g <br />Spectral Response Acceleration (1 -Second Period) S, <br />0.542 g <br />Spectral Design Response Coefficient (Short Period) SDS <br />0.943 g <br />Spectral Design Response Coefficient (1 -Second Period) SDI <br />0.542 g <br />Seismic response coefficient(s) Cs <br />0.236 <br />Redundancy Factor (North/South Direction) NIS rho= <br />1.0 <br />Redundancy Factor (East / West Direction) E/W rho= <br />1.0 <br />Design Base Shear (North/South Direction) (KIPS) <br />42 <br />Design Base Shear (East I West Direction) (KIPS) <br />42 <br />Base shear governed by: <br />Seismic <br />Seismic Analysis procedure used: <br />Equivalent Lateral <br />Force (ELF) <br />SEISMIC <br />Seismic Design Category: SDC = <br />D <br />Basic Structural System <br />Bearing Wall <br />Seismic Force Resisting System <br />Wood Shear Walls <br />System Over Strength Factor Omega <br />3 <br />Deflection Amplification Factor Cd <br />4 <br />Site Class = <br />D <br />Seismic Importance Factor per ASCE 7-10 Table 1.5-2 le <br />1.25 <br />Spectral Response Acceleration (Short Period) Ss <br />1.414 g <br />Spectral Response Acceleration (1 -Second Period) S, <br />0.542 g <br />Spectral Design Response Coefficient (Short Period) SDS <br />0.943 g <br />Spectral Design Response Coefficient (1 -Second Period) SDI <br />0.542 g <br />Seismic response coefficient(s) Cs <br />0.236 <br />Redundancy Factor (North/South Direction) NIS rho= <br />1.0 <br />Redundancy Factor (East / West Direction) E/W rho= <br />1.0 <br />Design Base Shear (North/South Direction) (KI PS) <br />17 <br />Design Base Shear (East I West Direction) (KIPS) <br />17 <br />Base shear governed by: <br />Seiismic <br />Seismic Analysis procedure used: <br />Equival]ent Lateral <br />Force (ELF) <br />SNOW LOAD: (1) <br />Flat Roof Snow Load, (PSF) P <br />25 (2) <br />Snow Drift Loading required by Authority Having Jurisdiction? <br />No <br />Snow Load Importance Factor 1 <br />1.0 (3) <br />1) Snow Load kaun-relbucide and includes 5 oofnsin-on-snowsurcharge where ground snow load is <br />greater than zero and 2Opsfnrless per ASCE7-1OSection 7.1O. <br />2) Snow Load based onWABO/SEAW White Paper in Low -Lying Puget Sound Basin, ASCE F�g 7- <br />1. <br />3) Snow Load Importance Factor per ASCE 7-10 Table 1.5-2. <br />DESIGN DEAD <br />BIDDER DESIGN <br />DEAD LOADS <br />LEH�UNO <br />REMARKS & FOOTNOTES <br />LOADS <br />Roof Dead Load, Total <br />is PSF <br />For Pre -Fabricated Wood Truss <br />Top Chord <br />TO PSF <br />design, <br />Bottom Chord <br />5 PSF <br />SUBMIT FOR REVIEW: SUBMITTALS of shop drawings, and product data are required for items noted in <br />the individual materials sections and for bidder designed elements. <br />SUBMITTAL REVIEW PERIOD: Submittals shall bemade intime toprovide aminimum ofTWO WEEKS or <br />10WORK|NG DAYS for review bythe Arch iteot/Emginearprior tothe onset offabrication. <br />REVIEW:GENERAL CONTRACTOR'S PRIOR Prior tosubmission tothe Arch iteot/Engineer. the Contractor <br />shall review the submittal for completeness. Dimensions and quantities are not reviewed by the SER, and <br />therefor*, must be verified by the General Contractor. Contractor shall provide any necessary dimensional <br />details requested by the Oetai|erand provide the Contractor's review stamp and signature before forwarding <br />tnthe Arch ited/Engineer. <br />REVIEW:SHOP DRAWING Once the contractor has completed his review, the SER will review the submittal <br />for general conformance with the design concept and the contract documents of the building and will stamp <br />the submittal accordingly. Markings or comments shall not be construed as relieving' the contractor from <br />compliance with the project plans and speoifications, nor departures there from. The SER will return submit- <br />tals in the form they are submitted in (either hard copy ore|eotronio). For hard copy submittals, the contrac- <br />tor is responsible for submitting the required number ofcopies to the SER for review. <br />SHOP DRAWlNG : When shop drawings (component design dravvingo) differ from or add to <br />the requirements of the structural drawings they shall be designed and stamped by the responsible SSE. <br />DEFERRED SUBMITTALS <br />BIDDER-DESlGNED ELEMENTS <br />Submit "Bidder -Designed" deferred submittals to the Architect and SER for review. The deferred submittals <br />shall also be submitted tothe city for approval, if required bythe city. <br />Design of prefabricated, "bidder designed", nnanufaotured, pre-ongineered, or otherhabrioated products shall <br />comply with the following requirements: <br />1) Design considers tributary dead, |ive, wind and earthquake loads in combinations required by <br />ABC. <br />2) Design within the Deflection Limits noted herein and as specified or referenced in the IBC. <br />3) Design shall conform to the specifications and reference standards of the governing code. <br />4) Submittal shall include: <br />& Calculations prepared, stamped and signed bythe SSE demonstrating codeoonfomn- <br />enma. <br />b. Engineered component design drawings are prepared, stamped and signed bythe SSE. <br />o. Product data, technical information and manufacturer's written requirements and Agency <br />approvals aaapplicable. <br />d. SSE may submit to the Arch itect/En0inaer. a request to utilize relevant alternate design <br />criteria of similar nature and generally equivalency which is recognized by the Code and <br />acceptable to the Authority Having Jurisdiction. Submit adequate documentation ofde- <br />DEFLECTION <br />VERTICAL <br />L�MIT <br />LIMITS FOR <br />Roof Members, Dead + Live or Snow or Wind, <br />Total Load (TL) Deflection <br />L / 240, where <br />(L is span length,inches) <br />SSE / BIDDER <br />DESIGNED <br />Roof, Live or Snow or Wind Load (RILL) <br />L / 360 <br />HORIZONTAL <br />LIMIT and FOOTNOTE <br />Members Supporting Brittle Finishes <br />L / 240 (1) <br />Members Supporting Flexible Finishes <br />L / 180 (1) <br />(1) Wind Load isreducible toO.42times the Component and Cladding Loads per Table 1GQ4.3footnote f. <br />REVIEW:GENERAL CONTRACTOR'S PRIOR Once the contractor has completed his review of the SSE <br />component drawings, the SER will review the submittal for general conformance with the design of the build- <br />ing and will stamp the submittal accordingly. Review of the Specialty Structural Engineer's (SSE) shop draw- <br />ings (component design drawings) is for compliance with design criteria and compatibility with the design of <br />the primary structure and does not relieve the SSE ofresponsibility for that design. All necessary bnaoing, <br />tieo, anchonage, proprietary products shall be furnished and installed per manufacturer's instructions or the <br />SSE's design drawings and calculations. These elements include but are not limited to.. <br />° Prefabricated Wood Roof Trusses <br />INSPECTIONS:NSPECTIONS, QUAUTY ASSURANCE VERRCATIONS AND TEST REQUIREMENTS <br />Foundadonn, footings, under slab systems and framing are subject to inspection by the <br />Building Official in accordance with IBC 110.3. Contractor shall coordinate all required inspections with the <br />Building Official. <br />TESTS:SPECIAL INSPECTIONS, VERIFICATIONS and Special Inspections, Verifications and Testing <br />shall be don* in accordance with IBC Chapter 17. the STATEMENT AND SCHEDULES OF SPECIAL ;N- <br />SpECT|ONSon S1 2 and the STATEMENT INSPECTION. /\ <br />. /�\ <br />OBSERVATION:STRUCTURAL per IBC Section 1704.6 <br />Structural Observation is the visual observation of the structural system by a registered design professional <br />for general conformance to the approved construction douumenho it is not always required on o <br />does not include or waive the responsibility for the special inspections and tests required by a Special In- <br />spector per IBC Chapter 17, is not continuous, and does not certify conformance with the approved construc- <br />tion documents. <br />Structural Observation for this project is required per IBC Section 17846Contractor shall notify the SER in <br />otime|y manner to a||ovv required Structural Observations to occur. Reports will be distributed tothe Anzhi- <br />toct. the Contractor, Special Inspector and the Authority Having Jurisdiction. <br />The frequency and extent of observations is at the discretion of the structural observer. Only significant <br />stages of construction identified by the Structural Observer require observation. For repetitive or similar <br />structural elements identified as aignifivant, only the first element ofe stage requires observation un|aou not- <br />*dothamviee. <br />RESPONSIBILITY:CONTRACTOR Prior to issuance of the building permit. the Contractor is required to <br />provide the Authority Having Jurisdiction a signed, written acknowledgement of the Contractor's responsibili- <br />ties associated with the above Statement ofSpecial Inspections addressing the requirements listed in IBC <br />Section 1704.4 Contractor is referred to IBC Sections 1705.12.5 and 1705.12.6 for architectural and MEP <br />building systems that may be subject to additional inspections (based on the building's designated Seismic <br />Design Category listed in the CR|TER|A), including anchorage ofH\AAC ductwork containing hazardous ma- <br />terials, piping systems and mechanical units containing f|ammab|e, combustible or highly toxic materia|a, <br />electrical equipment used for emergency or standby power, exterior wall panels and suspended ceiling sys- <br />tems. <br />SULS AND FOUNDATIONS <br />REFERENCE :Conformto|BC}Chapber18''Soi|aandFoundations." <br />REPORT:GEOTECHNICAL No report was provided for this project. Recommendations contained in existing <br />building drawings titled ^A New Play Area Structure for: St Mary Magde|in^ by Kosnik Engineering dated 88- <br />13-O6were used for design. <br />RESPONSIBILITIES: Contractor shall be responsible to review the Geoteohnioa| Report <br />and shall follow the recommendations specified therein inn|udinQ, but not limited to, eubgnade preparations, <br />pi|einata||ationprocedunee.groundvvaternnanagennentandsteeps|opeBestManeQementPraotioes." <br />INSPECTION: TheGeotechnioe| Engineer shall inspect all sub -grades and <br />prepared soil bearing surfaces, prior to placement of foundation reinforcing steel and concrete. Gaotechnioa| <br />Engineers shall provide a letter to the owner stating that soils are adequate to support the ''A||ovvab|e Foun- <br />dation Bearing Preasure(a)^shown below. <br />DESIGN SOIL VALUES: <br />Allowable Foundation Bearing Pneeauns--------- 3000 P8F (Per Existing Gym Structural Draw- <br />ings) <br />Passive Lateral Premaune................................................ 250P8F7FT(A(Assumed) <br />Active Lateral Pressure (unreetnsinad)............................. 35 PSF/FT(Assumed) <br />CVeffioientofS|idingFricdon--------------' 0.35(Aosumed) <br />FOUNDATIONS and FOOTINGS: Foundations shall bear on either on competent native soil or compacted <br />structural fill as per the geotechnice| report. Exterior perimeter footings shall bear not less than 18 inches <br />below finish grade, unless otherwise specified by the geotechnical engineer and/or the building official. <br />DEPTH:FOOTING Tops of footings shall be as shown on plans with vertical changes as indicated with <br />steps in the footings-, locations of steps shown as approximate and shall be coordinated with the civil grading <br />plans to ensure that the exterior perimeter footings bear no less than 18 inches below finish gnade, or as oth' <br />emviee indicated by the geotaohnica| engineer or building official. <br />: All s|aba-on-grade shall bear on compacted structural fill or competent native soil per <br />the geotechnical report. All moisture sensitive| bd those subject to receivemoisture sensitive <br />coati ngeyoovermg shall be provided with an appropriate capillary break and vapor barrier/retardant over the <br />eubgrada prepared and insiei|ad as noted in the geotechnical repdrt, barrier manufacturer's written recom- <br />mendations and coordinated with the finishes specified by the Architect. <br />CAST-IN—PLAGE CONCRETE <br />REFERENCE :Conformto <br />1) AC|301-1O"Specifications for Structural Concrete" <br />2) IBC Chapter 19''Conorete" <br />(3) ACI 318'14 "Building Code Requirements for Structural Concrete" <br />(4) ACi 117-1O"Specifications for Tolerances for Concrete Construction and Materials" <br />REFERENCE:FIELD The contractor shall keep a copy ofAC| Field Reference menue|. Sp 15. "Standard <br />Specifications for Structural Concrete (ACI 301) with Selected ACI and ASTM References." <br />MIXTURES:CONCRETE Conform toACA 301 Section 4 "Concrete Mixiunee" and IBC Section 1904.1. <br />MATERIALS: Conform toACl 301 Section 4.2.1 "Materials" for requirements fornementitioma maLerials, ag- <br />gregatea, mixing water and admixtures. <br />SUBMITTALS: Provide all submittals required bvACI 301 Section 4.1.2. Submit mix designs foreach mix in <br />the table below. Substantiating strength results from past tests shall not be older than 24 months perAC| <br />318 Section 26.4.3.1 (b)� <br />Member <br />Strength <br />Test Age <br />Nominal <br />Exposure <br />Max <br />Air Con- <br />Notes <br />Type/Location <br />f'C (psi) <br />(days) <br />Maximum <br />Class <br />W/C <br />tent <br />(I to 8 Typical <br />Aggregate <br />Ratio <br />UNO) <br />& Sidewalks <br />Table of Mix Design Reguirements Notes: <br />(1) VVYC Ratio: Water—cementitious material ratios shall be based on the total weight of cementitious ma- <br />terials. Maximum ratios are contnoDed by strength noted in the Table of Mix Design Requirements and <br />durabi|ity requirements given in ACl 318 Section 10.3. <br />(2) Cemendtioue&8at*ria|e: <br />a. The use offly ash, other pozzo|ana'silica fume, or slag shallconform hoACU318Sections 19.3.2 <br />and 264.2.2. Maximum amount of fly ash shall be 25% of total oementitious content un1oea re- <br />viewed and approved otherwise bySER. <br />b. For concrete used in elevated fluurs, minimum oamentitious-materials content sha|| conform to <br />AC| 301 Table 4.2.2.1. Acceptance oflower cement content ia contingent on providing support- <br />ingdatatutheSERforreviewamdaooeptonue. <br />C. Cemantitious materials shall conform to the re|evantASTM standards listed in ACX 318 Section <br />26.4.1 1.1(a). <br />(3) Air Content: Conform toAC| 318 Section 10.3.3.1 Minimum standards for exposure class are noted in <br />the table. If freezing and thawing class in not nnLed, sir content given is that required by the SER. <br />Tolerance is±1-1/296 Air content shall bemeasured atpoint ofplacement. <br />(4) Aggregates shall conform toASTM C33. <br />(S) Slump: Conform toACi 301 Section 4 2.2,2. Slump shall be determined atpoint ofplacement. <br />(G) Chloride Content: Conform tuACI 318 Table 19 32.1. <br />(7) Non- chloride accelerator: Non -chloride accelerating admixture maybe used in concrete placed atam- <br />bient temperatures below 5Q°Fatthe contractor's option. <br />(8) AC! 318, Section 103.1.1 exposure classes shall be assumed to be FO. 30. PO. and CO unless differ- <br />ent expoaunec|esses are listed in the Table of Mix Design Requirements that modify these base re- <br />quirements. <br />Conform toAC| 301 Section 2 "Formwork and Form Accessories." Removal <br />of Forms shall conform to Section 2 3.2 except strength indicated in Section 2.3.2.5 nhn|| be O 75f' n. <br />DELIVERY:MEASURING, MIXING, AND Conform toAC| 301 Section 4.3. <br />CURING:HANDLING, PLACING, CONSTRUCTING AND Conform toAC| 301 Section 5 In addition, hot <br />weather concreting shall conform toACI 305R-10 and cold weather concreting shall conform toACl 306F\' <br />1O. <br />JOINTS:CONSTRUCTION Conform to /\CI 301 Sections. 2.225. 5.22.1 and 5.3.2.6. Construction joints <br />shall be located and detailed as on the construction drawings Submit alternate locations porAC| 301 Sec- <br />tion 5.1.2.3a for review and approval by the SER two weeks minimum prior to forming. Use of an acceptable <br />adheeive, surface retardant, port|and cement grout or roughening the surface is not required unless speoifi- <br />oa||ynoted on the drawings. <br />ITEMS:EMBEDDED Position and secure in place expansion joint materia|, anchors and other structural and <br />non-structural embedded items before placing concrete. Contractor shall refer to machanioa|, e|eotrica|, <br />plumbing and architectural drawings and coordinate other embedded items. <br />CONCRETE:POST-INSTALLED ANCHORS to Anchor location, type, diameter and embedment shall be as <br />indicated on drawings. Reference the POST INSTALLED ANCHORS section for applicable Post -installed <br />Anchor Adhesives. Anchors shall be installed and inspected in strict accordance with the applicable )CC- <br />Eva|uationService Report (ESR). Special inspection shall beper the TESTS and INSPECTIONS section. <br />STRENGTH TESTING AND ACCEPTANCE: <br />Testing: Obtain samples and conduct tests in accordance with ACI 301 Section 1.6.3.2. Additional sam- <br />ples may be required to obtain concrete strengths at alternate intervals than shown below <br />m Cure cylinders for 28-daytest age, test 1 cylinder mt7 dayo, test cylinders at28 deya, and hold <br />1 cylinder in reserve for use as the Engineer directs. After58 dayo, unless notified by the Engineer <br />to the contrary, the reserve cylinder may be discarded without being tested for specimens meeting <br />28-daystrength requirements. <br />* The number ofcylinders indicated above reference 8by12incylinders. |f4by8incylinders are <br />tobeused, additional cylinders must becured for testing of3cylinders attest age per the table of <br />mix design requirements. <br />Acceptance.' <br />Strength is satisfactory when: <br />(1) The averages of all sets of 3 consecutive tests equal or exceed the specified strength. <br />(2) No individual test falls below the specified strength by more than 500 poi. <br />A ''test' for acceptance is the average strength of two 8 by 12 in. cylinders orthree 4 by 8 in. cylin- <br />ders tested etthe specified test age. <br />�^0��o��������� <br />^�v^ " *�v u_�u�x��_« x <br />���k����� ���� ������� <br />^�u~�o���nu~��x��n�v u_n�:�u,o <br />r0p'OIDHIT N0TICH <br />mS mmowcE)T ^wu THE wFORManx <br />*cREw REuxwc 10 THE PROJECT mR�_ <br />AN wsmo clfnF sn ccAND THE <br />cunnomco PPmpcmonronTEs x, <br />wASx m/u xxu ARCHITECTS, P.S. NO <br />p�/ xcn�� SHALLac copco. <br />o�/cmu zosmaoTED, o�mnn <br />OR uwc mmmoLc TO �*cxs ux <br />uscu a ^m cr�� exATSOmcx, <br />cxccPI ^s cxpncssn ^mmopzco w <br />vmr^�a,amzSC, wAJ�xwmHALL <br />CO <br />00 <br />cc <br />M <br />Cn <br />co <br />CE <br />cc <br />Cc <br />75 <br />cD <br />UJ <br />co <br />CD <br />LU <br />CO <br />~ <br />LU <br />� <br />- <br />MUJ <br />� <br />=�< <br />Pi <br />s*�o m� <br />we] I i I I QI I M 11011 U0111 i <br />SHEET wouocn <br />I <br />2 <br />� <br />CO <br />� <br />~ <br />