CONCRETE <br />1. ALL CONCRETE UNLESS OTHERWISE NOTED SHALL BE REGULAR WEIGHT HARD <br />ROCK TYPE (150 PCF) AGGREGATES SHALL CONFORM TO ASTM C33 WITH PROVEN <br />SHRINKAGE CHARACTERISTICS OF LESS THAN 0.05%. <br />2. CONCRETE COMPRESSIVE DESIGN STRENGTHS AT 28 DAYS (f'c) SHALL BE: <br />CONCRETE EXPOSURE & COMPRESSIVE DESIGN STRENGTHS <br />DESIGNATION <br />CONDITIONS <br />EXPOSURE <br />CLASS <br />MIN. f'c <br />(psi) <br />HEATED: SLABS, BEAMS, <br />INTERIOR CONC. & <br />GIRDERS, COLUMNS, PIERS, AND <br />FOOTINGS <br />FO <br />2500 <br />BURRIED FOOTINGS <br />FOUNDATION WALLS, UN —HEATED: <br />SLABS, BEAMS, GIRDERS, <br />UNSATURATED <br />F1 <br />3500 <br />COLUMNS, PIERS, PILE CAPS, <br />EXTERIOR CONC. <br />SHEAR WALLS <br />3. ALL CONCRETE WITH A DESIGNATED COMPRESSIVE STRENGTH EXCEEDING 2500 <br />PSI SHALL REQUIRE SPECIAL INSPECTION BY AN INSPECTOR APPROVED BY THE <br />BUILDING DEPARTMENT AND THE ENGINEER. EXCEPTION: NO INSPECTION IS <br />REQUIRED WHERE CONCRETE EXCEEDING 2500 PSI IS DESIGNATED FOR WEATHERING <br />PURPOSES ONLY. <br />4. CEMENT SHALL CONFORM TO ASTM C150, TYPE I, CSA NORMAL. <br />5. MAXIMUM SLUMP SHALL NOT EXCEED 4 INCHES IN FLATWORK. <br />6. PLACEMENT OF CONCRETE SHALL BE IN CONFORMANCE WITH ACI 301. <br />7. CONCRETE SHALL BE MAINTAINED IN A MOIST CONDITION FOR A MINIMUM OF FIVE <br />(5) DAYS AFTER PLACEMENT. ALTERNATE METHODS WILL BE APPROVED IF <br />SATISFACTORY PERFORMANCE CAN BE ASSURED. <br />8. KEYED CONSTRUCTION JOINTS SHALL BE USED IN ALL CASES. ALL CONSTRUCTION <br />JOINTS SHALL BE THOROUGHLY CLEANED AND ALL LAITANCE SHALL BE REMOVED. <br />ALL VERTICAL JOINTS SHALL BE THOROUGHLY WETTED AND SLUSHED WITH A COAT <br />OF NEAT CEMENT IMMEDIATELY BEFORE PLACING NEW CONCRETE. <br />9. SUBMIT LOCATION OF POUR JOINTS PRIOR TO PLACEMENT. POUR JOINTS SHALL <br />BE LOCATED TO MINIMIZE EFFECTS OF SHRINKAGE AS WELL AS PLACED AT POINTS <br />OF LOW STRESS. MAXIMUM AREA OF POUR JOINTS IS 400 SF. <br />10. MINIMUM CONCRETE COVERAGE OF REINFORCING STEEL FOR FORMED WORK <br />SHALL BE AS FOLLOWS: <br />EXPOSED TO EARTH OR WEATHER (#5 OR SMALLER): 1 1/" <br />EXPOSED TO EARTH OR WEATHER (#6 OR LARGER): 2" <br />*NOTE: CONCRETE CAST AGAINST GROUND SHALL HAVE 3" MINIMUM <br />COVERAGE <br />11. PIPES OTHER THAN ELECTRICAL CONDUITS SHALL NOT BE EMBEDDED IN <br />STRUCTURAL CONCRETE EXCEPT WHERE SPECIFICALLY APPROVED. <br />12. LEAN CONCRETE SHALL BE 2 SACKS OF CEMENT PER CUBIC YARD OF <br />CONCRETE. <br />13. CONCRETE MIXES SHALL BE PROVIDED IN ACCORDANCE WITH ACI 318. <br />14. CONCRETE EXPOSED TO SULFATES, CONCRETE WITH LOW PERMEABILITY <br />REQUIREMENTS, AND CONCRETE WITH CHLORIDE ION CONTENT REQUIRE ADDITIONAL <br />MIX DESIGN CONSIDERATIONS. IN THE EVENT OF THESE REQUIREMENTS THE <br />ENGINEER SHALL BE NOTIFIED BY THE CLIENT IN A WRITING AND DESIGN MIXES <br />SHALL BE PROVIDED PER ACI 318. <br />CEMENT CONTENT <br />F'c (PSI) <br />LBS/CUBIC YARD <br />(MIN.) <br />SACKS PER CUBIC <br />YARD (MIN.) <br />NOTES <br />2500 <br />470 <br />5 <br />NOTE A <br />3500 <br />1 564 <br />6 <br />— <br />NOTE 1: MIXES SHALL BE PROPORTIONED TO PRODUCE A SLUMP OF 5" OR LESS. <br />NO MORE THAN A 1" PLUS TOLERANCE SHALL BE ALLOWED. <br />NOTE 2: AIR ENTRAINMENT IS REQUIRED FOR ALL CONCRETE EXPOSED TO WEATHER. <br />FOR 3X" AGGREGATE AN ENTRAINMENT OF 6% IS REQ'D. FOR Y2" AGGREGATE AN <br />AIR ENTRAINMENT OF 7% IS REQ'D. <br />NOTE 3: POZZOLANS ARE NOT PERMITTED IN THE MIX DESIGN UNLESS APPROVED <br />BY THE ENGINEER. <br />A) WHERE SPECIAL INSPECTION IS NOT REQUIRED UNDER SECTION 1704.4 OF THE <br />I.B.C., CONCRETE SHALL HAVE A MINIMUM CEMENT CONTENT OF 5 SACKS PER <br />CUBIC YARD OF CONCRETE. <br />B) FOR STRENGTHS ABOVE 4000 PSI, PROPORTIONS SHALL BE ESTABLISHED BY THE <br />METHODS SPECIFIED ACI 318. <br />C) DESIGN MIX (OTHER THAN AS SPECIFIED IN THIS TABLE) SHALL BE SUBMITTED <br />TO THE BUILDING OFFICIAL TWO WEEKS PRIOR TO FIRST USE. <br />GENERAL <br />1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE CONTRACT <br />DRAWINGS. <br />2. DURING THE CONSTRUCTION PERIOD THE CONTRACTOR SHALL BE RESPONSIBLE <br />FOR THE SAFETY OF THE BUILDING. THE CONTRACTOR SHALT_ PROVIDE ADEQUATE <br />SHORING, BRACING AND GUYS IN ACCORDANCE WITH ALL NATIONAL, STATE AND <br />LOCAL SAFETY ORDINANCES. ANY DEVIATION MUST BE APPROVED PRIOR TO <br />ERECTION. <br />3. ALL ERECTION PROCEDURES SHALL CONFORM TO OSHA STANDARDS. ANY <br />DEVIATION MUST BE APPROVED BY OSHA PRIOR TO ERECTION. <br />4. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION <br />PROCEDURES INCLUDING LAGGING, SHORING AND PROTECTION OF ADJACENT <br />PROPERTY, STRUCTURES, STREETS AND UTILITIES IN ACCORDANCE WITH ALL <br />NATIONAL, STATE AND LOCAL SAFETY ORDINANCES. <br />5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE WORK OF ALL <br />TRADES AND SHALL CHECK ALL DIMENSIONS. ALL DISCREPANCIES SHALL BE CALLED <br />TO THE ATTENTION OF THE ENGINEER AND BE RESOLVED BEFORE PROCEEDING WITH <br />THE WORK. <br />6. DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE <br />CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO <br />DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED SUBJECT TO <br />REVIEW BY THE ENGINEER. <br />7. ALL DETAILS DESIGNATED AS STANDARD OR TYPICAL SHALL OCCUR IN ADDITION <br />TO ANY OTHER SPECIFIC DETAIL CALLED OUT. <br />8. COORDINATE WITH MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR SIZE <br />AND LOCATION OF ALL OPENINGS REQUIRED FOR DUCTS, PIPES, PIPE SLEEVES, <br />ELECTRICAL CONDUITS, AND OTHER ITEMS TO BE EMBEDDED IN CONCRETE OR <br />OTHERWISE INCORPORATED IN STRUCTURAL WORK. <br />9. PROVIDE OPENINGS AND SUPPORTS, AS REQUIRED PER STANDARD DETAILS FOR <br />HEATERS, MECHANICAL EQUIPMENT, VENTS, DUCTS, PIPING, ETC. ALL SUSPENDED <br />MECHANICAL EQUIPMENT SHALL BE SWAY OR LATERALLY BRACED. <br />10. ALL INFORMATION SHOWN ON THE DRAWINGS RELATIVE TO EXISTING CONDITIONS <br />IS GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OF <br />ACCURACY. WHERE ACTUAL CONDITIONS CONFLICT WITH THE DRAWINGS, THEY SHALL <br />BE REPORTED TO THE ENGINEER SO THAT THE PROPER REVISIONS MAY BE MADE. <br />MODIFICATION TO DETAILS OF CONSTRUCTION SHALL NOT BE MADE WITHOUT PRIOR <br />WRITTEN APPROVAL OF THE ENGINEER. <br />11. ARCHITECTURAL AND MECHANICAL PLANS ARE CONSIDERED A PART OF THE <br />STRUCTURAL DESIGN DRAWINGS AND ARE TO BE USED TO DEFINE DETAIL <br />CONFIGURATIONS INCLUDING; BUT NOT LIMITED TO RELATIVE LOCATION OF MEMBERS, <br />ELEVATIONS, DIMENSIONS AND LOCATIONS OF ALL OPENINGS, ETC. <br />OF EVERETT; <br />REVIPAIED FOR PERMIT <br />I1 <br />A <br />15 <br />O <br />N <br />Ln <br />cV <br />Ln <br />N <br />5 O U <br />ry co <br />LLJ 11 <br />4- N <br />L9 �O <br />O m <br />m u_..i <br />N <br />It <br />0 <br />CO VIA <br />Ac- o� wAsfj,�� <br />343, -i <br />cc. <br />OCT 1 2 2021 <br />Drawn By: VKY <br />Checked By: Ch R15 <br />Date:09-1 1-2020 <br />5DA JOB NO. <br />9055 <br />5TRUCTU RAL <br />NOTES <br />