Laserfiche WebLink
B3uiidinw i le, 7ht I a.ndout <br /> Base Elevation Survey <br /> (For Surveyor Use Only IF a survey is required. Instructions:Complete this form to determine the average base <br /> elevation of the proposed footprint or to locate the highest point of the sidewalk, whichever applies. This form is to <br /> be submitted with the building permit application.Include these calculations on the site plan and building plans. <br /> During framing, the Height Survey form will be required for the framing inspection. Contact the Planning <br /> Department at 425.257.8731 if the structure does not meet the height limit.) <br /> Date of Survey: 9-21-2020 PERMIT# <br /> Property Location Surveyed: 2110 ROCKEFELLER AVE EVERETT,WA 98201 <br /> (address and/or parcel#) <br /> Description of Bench Mark: REBAR W/PINK CAP SET SOUTH OF CONCRETE WALKWAY APPROX.35' <br /> EAST OF THE ALLEY,AS SHOWN ON MAP <br /> Bench Mark Elevation: 104.75'-ASSUMED DATUM <br /> BOX 1 BOX 2 <br /> A= 105.46' <br /> B= 104.83' Highest point of the <br /> C= 104.80' sidewalk 100.01' EL <br /> D = 105.53' <br /> A+B+C+D= 420.62 /4= 105.16 Average Base Elevation *Submit a map showing <br /> the location of the highest <br /> + Maximum Height of 15 (feet) point of the sidewalk <br /> = 120.16' Maximum Elevation Allowed abutting the property. <br /> Check: <br /> BOX 1 ® I, Joe Willis,Jr., PLS. , certify that I measured the grade at the <br /> midpoints of the proposed structure at the C4undisturbed ground elevations/ Dapproved <br /> topography elevations for the property above. <br /> BOX 2 ® I, Joe Willis,Jr., PLS. , certify that I measured the highest point <br /> of the ide alk for the prope above. <br /> , 10-16-2020 <br /> \Signature of Surveyor Date <br /> 4a <br /> Company ALL LAND S��'VEYING, LLC. F WA�IL11 <br /> y/. `r <br /> Address 119 AVE B SUITE 102 <br /> SNOHOMISH,WA 98290 �., 0 <br /> \� 507111 O <br /> Phone/Email 360.568.4031 INFO@ALLLANDSURVEYING.COM Sr� I `fie <br /> L <br />