My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2401 TAYLOR DR 2022-08-29
>
Address Records
>
TAYLOR DR
>
2401
>
2401 TAYLOR DR 2022-08-29
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2022 8:21:12 AM
Creation date
3/2/2022 8:52:13 AM
Metadata
Fields
Template:
Address Document
Street Name
TAYLOR DR
Street Number
2401
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> August 11, 2020 <br /> Mr. Joel Haack <br /> Haack Brothers Homes <br /> 3922 87th Avenue NE <br /> Marysville, WA 98270 <br /> Email Address: joel@haackbrothers.com <br /> RE: Owner: Clay Erickson <br /> Job Address: 2401 Taylor Drive <br /> Plan Check Number: C2004-001, Second Building Review <br /> Dear Mr. Haack, <br /> We have reviewed the responses to the Architectural and Structural First Review letters dated April <br /> 9, 2020, and May 28, 2020, respectively. Multiple comments have not been completely addressed <br /> and require additional action before a permit can be issued. The comments are itemized for <br /> consistency with the original review letter. These comments address building issues only. <br /> Additional revisions or additions may be required by other departments including Public Works, <br /> Planning, and Fire. <br /> Code citations provided in the following comments reference the Everett Municipal Code (EMC), <br /> 2015 International Residential Code (IRC), 2015 International Building Code (IBC), and the <br /> residential provisions of the 2015 Washington State Energy Code (WSEC). Amendments to the <br /> building codes by the Washington Administrative Code (WAC) are identified. Citations provided in <br /> the comments reference the IRC unless noted otherwise. <br /> In order for the processing of your application to continue, the following documentation shall be <br /> submitted to the Building Division for review: <br /> a. Itemized letter addressing the comments provided below. <br /> b. Two complete sets of revised construction drawings. <br /> c. Two copies of supplemental structural calculations. <br /> Submittal documents shall contain sufficient information and detail to review the proposed project <br /> for compliance with the adopted codes. Upon submittal of the revised documents, your application <br /> will be given priority and plan reviews will recommence. <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.