My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8517 7TH AVE SE 2022-03-02
>
Address Records
>
7TH AVE SE
>
8517
>
8517 7TH AVE SE 2022-03-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 9:29:58 AM
Creation date
3/2/2022 9:28:42 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8517
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SMM Garden Everett December 5, 2019 <br /> Stormwater Pollution Prevention Plan Narrative <br /> A Stormwater Pollution Prevention Plan (SWPPP) has been prepared as part of the construction <br /> Stormwater permit requirements.The site development area of 0.69 acre is forested with <br /> moderate slopes within Church grounds located at the southeast corner of the site that <br /> includes a baseball field. The site address is 8517 7th Ave SE, Everett, WA 98208 with tax parcel <br /> number 28051800200100.This project proposes short platting into 2 lots and new construction <br /> of a single-family residence, and driveway access. <br /> The purpose of the SWPPP is to describe all temporary and permanent erosion and sediment <br /> control (TESC) measures, pollution prevention measures, inspection/monitoring activities, and <br /> recordkeeping that will be implemented during the proposed project.This narrative is to be <br /> considered a "living document." This project's Certified Erosion and Sediment Control Specialist <br /> is to amend this document as needed during construction. Applications of these elements are <br /> shown on the SWPP Plan Sheet. The specific elements included in the SWPPP are: <br /> Element#1: Mark Clearing Limits <br /> Prior to the beginning of land disturbing activities, the clearing limits will be defined along the <br /> property boundary: <br /> • BMP C234-Silt fence <br /> Element#2—Establish Construction Access <br /> Utilize existing access driveway from church parking lot. <br /> Element#3-Control Flow Rates <br /> Applicable BMP's are shown on the SW Plan and include: <br /> • BMP C120-Temporary or Permanent Seeding <br /> • BMP C234-Silt fence <br /> Element#4- Install Sediment Controls <br /> Specific controls include: <br /> • Temporary or Permanent Seeding(BMP C120) <br /> Element#5-Stabilize Soils <br /> Areas that are to remain uncovered for more than 7 days, are to be stabilized with BMPs. <br /> Specific BMP's to be implemented include Temporary and Permanent Seeding (BMP C120), <br /> Mulching (BMP C121), and Plastic Covering (BMP C123). <br /> Element#6- Protect Slopes <br /> There are sensitive slope areas with underlying erosion hazard soils on-site. Disturbance of <br /> ground and existing vegetation outside the planned construction area should be avoided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.