SMM Garden Everett December 5, 2019 <br /> Marginal slope areas disturbed during construction must be revegetated at the end of <br /> construction with appropriate plantings to limit future potential erosion. <br /> Element#7- Protect Drain Inlets <br /> It does not appear that this will be necessary for this project. Contractor to determine <br /> applicability. <br /> • BMP C220: Storm Drain Inlet Protection <br /> Element#8-Stabilize Channels and Outlets <br /> Due to flat nature of the area of construction it is not anticipated that any flows of significant <br /> velocity will leave the site or cause any negative impact to downstream channels or water <br /> courses. <br /> Element#9-Control Pollutants <br /> All pollutants, including waste materials and demolition debris, that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of stormwater. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept <br /> clean, well-organized, and free of debris. <br /> • BMP C 153-Material Storage, Delivery, and Containment <br /> Element#10-Control Dewatering <br /> No de-watering is anticipated for this project. <br /> Element#11- Maintain BMPs <br /> All temporary and permanent erosion and sediment control BMPs shall be maintained and <br /> repaired as needed to assure continued performance of their intended function. Maintenance <br /> and repair shall be conducted in accordance with each particular BMP's specifications. Visual <br /> monitoring of the BMPs will be conducted at least once every calendar week and within 24 <br /> hours of any rainfall event that causes a discharge from the site. If the site becomes inactive, <br /> and is temporarily stabilized,the inspection frequency will be reduced to once every month. <br /> All temporary erosion and sediment control BMPs shall be removed within 30 days after the <br /> final site stabilization is achieved or after the temporary BMPs are no longer needed.Trapped <br /> sediment shall be removed or stabilized on site. Disturbed soil resulting from removal of BMPs <br /> or vegetation shall be permanently stabilized. All temporary and permanent erosion and <br /> sediment control BMPs shall be maintained and repaired as needed by Contractor. <br /> Element#12- Manage the Project <br /> Erosion and sediment control BMPs for this project have been designed based on the following <br /> principles: <br /> • Design the project to fit the existing topography, soils, and drainage patterns. <br /> • Emphasize erosion control rather than sediment control. <br /> • Minimize the extent and duration of the area exposed. <br />