Laserfiche WebLink
SEC 29,TWP 29,R 05,WM <br /> / \ WIRE FABRI of <br /> NEWLY GRADED OR <br /> SLOP DISTUREED SIDE <br /> i / <br /> ....Y ry FILTER FABRIC <br /> , I <br /> , ` MATERIAL <br /> \ SILT FENCE_ _ /mr/k Ja/•` `,� <br /> y�,' 1{ CLEARING LIMBS ``y� _ 11 L�.L �� .I <br /> k \ / �" �� I BACKFILL AND \✓• <br /> Ge -�, `" COMPACTED • I <br /> Y� I si�liyG' ...—, / \ ",,,„,,,, -� \ ,11"ate �+1�" A t o pl. a u' GRAPHIC SCALE �Iy �. 2D 0 10 20 'I 1 Yr7f ` .e1,.. LU- >� O 1•=20. SECTION A-A <br /> s \ EI <br /> FILTER FABRIC MATERIAL <br /> \ MIRAFI 100XOREQUIVALENT A7/ .4 WIRE RINGS2hd'x14 GAUGE <br /> ,lRypICAI) WELDED WIRE FABRIC <br /> J OR EQUAL <br /> , 6 , C._ a 1 I \N II <br /> ..E a , — — 111111111111 <br /> _ r .:It I■■■■IN <br /> �{}� .. ►....ii <br /> ", I �� / � N"`•\ CERTIFIED EROSION iri. A'. �;�� ''i�i:<` % a tw\\,; <br /> CONTROL SPECIALIST <br /> //\\ � _ / BRIAN UNDSAY I I I I I I I I <br /> 6 WALKWAY TYPICAL /' . li p BRL SERVICES uC <br /> l' -".� t1 /'� 2221 EVERETT AVE,SUITE 203 I I I A <br /> •, i EVERETT,WA 98201 'I STEEL POSTS ' <br /> � ;,,_ - 0��,T }` I 425-269-5556 Li <br /> B•oc. u u u <br /> 1 4." r <br /> ..as1,-" .---°- -^ L • • ir"\ \ ENGINEER ELEVATION <br /> `-SILT FENCE 17 N/� r� BR SERVICES ' �� CITY OF EVERETT TEMPORARY SILT FENCE 5/it/2011 <br /> Do;e: <br /> 2221 EVERETT AVE,SUITE 203 PUBLIC WORKS r� <br /> WAITS •Z• I— 4255-259 55�a201 = DEPARTMENT 7.0E Std See: <br /> CLEARING <br /> CONSTRUCTION SEQUENCE 1 <br /> 1. ATTEND PRE-CONSTRUCTION CONFERENCE. OWNER/APPLICANT <br /> 2. INSTALL T.E.S.C. MEASURES. ST MARY MAGDALEN PARISH-EVERETT <br /> 3. HAND CLEAR AND GRUB(STOCK PILE TOPSOIL)SITE 710 NINTH AVE <br /> FOR SIDEWALK(OR SMALL EXCAVATOR) SEATTLE, WA 98104 <br /> 4. PLACE SIDEWALK FORMS <br /> 5. HAND PLACE CONC. FOR SIDEWALK AND STATUARY. SITE ADDRESS <br /> 6. BACKFILL ALL DISTURBED AREA WITH STOCK PILED <br /> HATCHING LEGEND TOPSOIL. EROSION CONTROL 8717 7TH AVE SE <br /> 7. REMOVE EROSION CONTROL MEASURES. EVERETT, WA 98208 <br /> 1. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO <br /> /// EXISTING ASPHALT PARKING REMOVE ANY SEDIMENT TRACKEDOFF N SITE. <br /> J/ 2. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND <br /> LIST OF BMP'S: MAINTENANCE OF ALL INSTALLED EROSION AND SEDIMENT CONTROL <br /> 1. PRESERVING NATURAL VEGETATION BMPs, ESPECIALLY AFTER STORMS. <br /> 2. PLRALIC O MTTAL FENCE 3. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENTS FROM <br /> tY`tt�� CONCRETE PAVERS 3. HIGHSILT VISIBILITYSCE ENTERING WATERWAYS IF THE PROPOSED BMPs FAIL. <br /> ]itTC�',L 4. SOPS FILING/COMPOSTING 4. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR CALL DIAL-A-DIG <br /> 5. TEMPORARY AND PERMANENT SEEDING UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 AT 811 <br /> 6. STORM DRAIN INLET PROTECTION THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 <br /> i .; THROUGH SEPTEMBER 30. A MINIMUM OF 48 HOURS <br /> ,: CONCRETE SIDEWALK 7. CONCRETE HANDLING BEFORE CONSTRUCTION BEGINS <br /> 8. MATERIAL DELIVERY. STORAGE AND CONTAINMENT <br /> 9. MATERIALS ON HAND <br /> 10. SCHEDULING <br /> ©Copyright 2019 by Brion R.Lindsay, BR.0 Services LLC Design,map, text and data may not be used,copied orreproduced in any way without express mitten permission of Brion F.Lindsay, 821L Services LLC <br /> DRAW BY: RE`A9QVS GIEEr y K, <br /> SWPPP/TESC BRE Services ICC SEELDR <br /> r,..,,, <br /> SMM GARDENSli <br /> AN ENGINEERING COMPANY ear1�L8'717 7TH AVE��SE 2221 EVERETT AVE.SUITE 203.EVERETT,WA 98201 'DB RO' 19 <br /> 6t69"x <br /> EVERETT,WA 98208 PRONE:425-259-5556 19-016 �fJsroyu 3�� <br /> E-AIAIU draftslationSecrthlink.net Of: 1 REY <br /> 12—''-19 <br />