|
SEC 29,TWP 29,R 05,WM
<br /> / \ WIRE FABRI of
<br /> NEWLY GRADED OR
<br /> SLOP DISTUREED SIDE
<br /> i /
<br /> ....Y ry FILTER FABRIC
<br /> , I
<br /> , ` MATERIAL
<br /> \ SILT FENCE_ _ /mr/k Ja/•` `,�
<br /> y�,' 1{ CLEARING LIMBS ``y� _ 11 L�.L �� .I
<br /> k \ / �" �� I BACKFILL AND \✓•
<br /> Ge -�, `" COMPACTED • I
<br /> Y� I si�liyG' ...—, / \ ",,,„,,,, -� \ ,11"ate �+1�" A t o pl. a u' GRAPHIC SCALE �Iy �. 2D 0 10 20 'I 1 Yr7f ` .e1,.. LU- >� O 1•=20. SECTION A-A
<br /> s \ EI
<br /> FILTER FABRIC MATERIAL
<br /> \ MIRAFI 100XOREQUIVALENT A7/ .4 WIRE RINGS2hd'x14 GAUGE
<br /> ,lRypICAI) WELDED WIRE FABRIC
<br /> J OR EQUAL
<br /> , 6 , C._ a 1 I \N II
<br /> ..E a , — — 111111111111
<br /> _ r .:It I■■■■IN
<br /> �{}� .. ►....ii
<br /> ", I �� / � N"`•\ CERTIFIED EROSION iri. A'. �;�� ''i�i:<` % a tw\\,;
<br /> CONTROL SPECIALIST
<br /> //\\ � _ / BRIAN UNDSAY I I I I I I I I
<br /> 6 WALKWAY TYPICAL /' . li p BRL SERVICES uC
<br /> l' -".� t1 /'� 2221 EVERETT AVE,SUITE 203 I I I A
<br /> •, i EVERETT,WA 98201 'I STEEL POSTS '
<br /> � ;,,_ - 0��,T }` I 425-269-5556 Li
<br /> B•oc. u u u
<br /> 1 4." r
<br /> ..as1,-" .---°- -^ L • • ir"\ \ ENGINEER ELEVATION
<br /> `-SILT FENCE 17 N/� r� BR SERVICES ' �� CITY OF EVERETT TEMPORARY SILT FENCE 5/it/2011
<br /> Do;e:
<br /> 2221 EVERETT AVE,SUITE 203 PUBLIC WORKS r�
<br /> WAITS •Z• I— 4255-259 55�a201 = DEPARTMENT 7.0E Std See:
<br /> CLEARING
<br /> CONSTRUCTION SEQUENCE 1
<br /> 1. ATTEND PRE-CONSTRUCTION CONFERENCE. OWNER/APPLICANT
<br /> 2. INSTALL T.E.S.C. MEASURES. ST MARY MAGDALEN PARISH-EVERETT
<br /> 3. HAND CLEAR AND GRUB(STOCK PILE TOPSOIL)SITE 710 NINTH AVE
<br /> FOR SIDEWALK(OR SMALL EXCAVATOR) SEATTLE, WA 98104
<br /> 4. PLACE SIDEWALK FORMS
<br /> 5. HAND PLACE CONC. FOR SIDEWALK AND STATUARY. SITE ADDRESS
<br /> 6. BACKFILL ALL DISTURBED AREA WITH STOCK PILED
<br /> HATCHING LEGEND TOPSOIL. EROSION CONTROL 8717 7TH AVE SE
<br /> 7. REMOVE EROSION CONTROL MEASURES. EVERETT, WA 98208
<br /> 1. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO
<br /> /// EXISTING ASPHALT PARKING REMOVE ANY SEDIMENT TRACKEDOFF N SITE.
<br /> J/ 2. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND
<br /> LIST OF BMP'S: MAINTENANCE OF ALL INSTALLED EROSION AND SEDIMENT CONTROL
<br /> 1. PRESERVING NATURAL VEGETATION BMPs, ESPECIALLY AFTER STORMS.
<br /> 2. PLRALIC O MTTAL FENCE 3. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENTS FROM
<br /> tY`tt�� CONCRETE PAVERS 3. HIGHSILT VISIBILITYSCE ENTERING WATERWAYS IF THE PROPOSED BMPs FAIL.
<br /> ]itTC�',L 4. SOPS FILING/COMPOSTING 4. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR CALL DIAL-A-DIG
<br /> 5. TEMPORARY AND PERMANENT SEEDING UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 AT 811
<br /> 6. STORM DRAIN INLET PROTECTION THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1
<br /> i .; THROUGH SEPTEMBER 30. A MINIMUM OF 48 HOURS
<br /> ,: CONCRETE SIDEWALK 7. CONCRETE HANDLING BEFORE CONSTRUCTION BEGINS
<br /> 8. MATERIAL DELIVERY. STORAGE AND CONTAINMENT
<br /> 9. MATERIALS ON HAND
<br /> 10. SCHEDULING
<br /> ©Copyright 2019 by Brion R.Lindsay, BR.0 Services LLC Design,map, text and data may not be used,copied orreproduced in any way without express mitten permission of Brion F.Lindsay, 821L Services LLC
<br /> DRAW BY: RE`A9QVS GIEEr y K,
<br /> SWPPP/TESC BRE Services ICC SEELDR
<br /> r,..,,,
<br /> SMM GARDENSli
<br /> AN ENGINEERING COMPANY ear1�L8'717 7TH AVE��SE 2221 EVERETT AVE.SUITE 203.EVERETT,WA 98201 'DB RO' 19
<br /> 6t69"x
<br /> EVERETT,WA 98208 PRONE:425-259-5556 19-016 �fJsroyu 3��
<br /> E-AIAIU draftslationSecrthlink.net Of: 1 REY
<br /> 12—''-19
<br />
|