8. All exposed ground must be reseeded within 30 days of the completion of construction. If reseeding <br /> is not practical due to weather or seasonal restraints,the ground must be covered with mulch as <br /> directed by the City Engineer. <br /> 9. City streets are to be kept clear of dirt and debris at all times during construction. Dust suppression <br /> and street cleaning must occur as directed by the Public Works Inspector. <br /> 10. Any grading/fill on this site shall be done so as to not impact the surrounding properties. <br /> 11. Short Plat requirements will include stubbing utilities to each lot,creating a paved easement access <br /> drive, providing all required drainage mitigation elements including amended soils, installing all <br /> required landscaping, and the required frontage improvements per Title 18 of the EMC <br /> 12. The public sewer main must be installed for the project in accordance with City Design and <br /> Construction Standards.The slope of the new 8"sanitary sewer crossing of 35th Street shall be <br /> 0.75%minimum. Provide cleanouts on all new side sewer stubs in accordance with COE Standard <br /> Drawing#604 at the property line. <br /> 13. All connection to the water main in 35th Street shall be performed by the City of Everett Water <br /> Department at the developer's expense.Water will be public to the back side of each water meter. <br /> 14. The preliminary water utility plan provided with this project application proposes to serve the <br /> development from the existing water main in 35th Street.This main is in the Intermediate Pressure <br /> Zone. Initial analysis of this proposal appears to indicate that it could nominally meet current code <br /> requirements(UPC, EMC,and NFPA)for both flow rates and residual pressures. However,the <br /> pressure provided by the Intermediate Pressure Zone would be at the low end of the code <br /> requirement,which may result in undesirable flow rates for those homes at higher elevations.As an <br /> alternative,the working water pressure at the development could be significantly improved by <br /> building a new main extension in 35th Street to connect to the water main in the Claremont <br /> Pressure Zone,which is located approximately 480ft to the east at the intersection of 35th Street <br /> and Federal Ave.Or, if the development is served from the Intermediate Zone,and additional <br /> pressure is desired,individual booster pumps with cross connection controls can be installed for <br /> each home by the developer at the developer's expense. <br /> 15. Direct access to lots 1 and 2 from 35th Street is acceptable as shown.A minimum driveway width of <br /> 10' is required for pan-handle lots. <br /> 16. Frontage improvements are required to be installed along the entire project frontage. <br /> a. 35th Street frontage improvement requirements: <br /> i. The existing face of curb location is acceptable as shown along the 35th Street frontage. <br /> ii. Full width sidewalk shall be required behind the existing curb along the entire 35th Street <br /> frontage. <br /> iii. Provide accessible ramps on east leg and west leg crossings of T intersection of Kromer Ave <br /> and 35th St. <br /> iv. All site access driveways shall comply with City of Everett standards. <br /> 477. <br /> Page 10 of 12 <br /> C3J-001, Rev II 19-002 <br />