My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 35TH ST 2022-03-07
>
Address Records
>
35TH ST
>
812
>
812 35TH ST 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:43:50 PM
Creation date
3/2/2022 11:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS <br /> 15. Direct access to lots Land 2 from 35th Street is acceptable as shown. A minimum driveway width <br /> of 10' is required for pan-handle lots. <br /> 16. Frontage improvements are,required to be installed along the entire project frontage. <br /> a. 35th Street frontage improvement requirements: <br /> i. The existing face of curb location is acceptable as shown along the 35th Street <br /> frontage. <br /> ii. Full width sidewalk shall be required behind the existing curb along the entire 35th <br /> Street frontage. <br /> iii. Provide accessible ramps on east leg and west leg crossings of T intersection of <br /> Kromer Ave and 35th St. <br /> iv. All site access driveways shall comply with City of Everett standards. <br /> 17. A performance guarantee is required on the public improvements for an amount not less than <br /> 120% of the cost of construction for those improvements. Upon completion of the work, a 1-year <br /> warranty bond in the amount of 10% of the construction costs for all public improvements shall <br /> be submitted to the City and shall run for one year from the date of final approval of the public <br /> improvements. The performance guarantee is released upon completion of the public <br /> improvements and receipt of the warranty bond. <br /> 18. A 2-year Warranty Bond in the amount of 10% of the construction costs for all Stoilnwater. <br /> Infrastructure shall be submitted to the City prior to final approval/close out of the permit. <br /> 19. As-builts of storm sewer, sanitary sewer, and water systems are required to be submitted per <br /> current City of Everett Design and Construction Standards and Specifications for Development <br /> manual. <br /> 20. A fire hydrant (or hydrants) capable of providing the required fire flow must be located within <br /> 350 driving feet of all residences in the proposed short subdivision. Location(s)of the hydrant(s) <br /> must be approved by the City Fire Marshall. The hydrant(s)must meet City specifications. Look <br /> at the fire marshal's comments for fire department comments. <br /> 21. Stormwater shall be managed in accordance with current City of Everett Standards. Adherence <br /> shall include the following: <br /> a. The project is in the combined sewer system and Interim Policy 2-11 for Surface Water <br /> Management in the Combined Area applies. <br /> b. Minimum requirements 1-9 are required to be evaluated for this project. MR#6 is exempt <br /> per Interim Policy 2-11. Infiltration facilities are not allowed for this site. <br /> c. The project adds more than 5,000sf of impervious area,therefore flow control(detention) <br /> is required, per the City's 2010 Stormwater Management Manual. <br /> d. Provide maps showing the site boundary with existing and proposed coverage areas(lawn, <br /> pasture, roof, etc.)used for input into the model. <br /> e. The downstream combined sanitary and storm sewer system is capacity constrained and <br /> has experienced sanitary sewer overflows in the fast (overflow at manholes, flooding to <br /> Page 3 of!) <br />
The URL can be used to link to this page
Your browser does not support the video tag.