My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
812 35TH ST 2022-03-07
>
Address Records
>
35TH ST
>
812
>
812 35TH ST 2022-03-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2022 1:43:50 PM
Creation date
3/2/2022 11:13:34 AM
Metadata
Fields
Template:
Address Document
Street Name
35TH ST
Street Number
812
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
41ffir PUBLIC WORKS <br /> the surface). Direct discharge of surface water runoff to the combined system will not be <br /> allowed. <br /> f. The downstream analysis needs to be revised to state that the flow in the Tulalip line is <br /> directed to Lift Station 2, located in the Port property west of Bond Street, which pumps <br /> the flow to the wastewater treatment plant for treatment prior to discharge to the <br /> Snohomish River/Puget Sound. Lift Station 2 overflows to Puget Sound Outfall no. 7, <br /> which is a combined sewer outfall. <br /> g. The height of the orifice in the modeling input needs to reflect the outlet being raised 6" <br /> above the bottom of the detention pipe (bottom 6" of detention pipe is sediment storage). <br /> h. The detention pipe profile needs to be expanded to show the proximity to the adjacent <br /> proposed structure and the bearing zone from the structure's footing to the detention pipe <br /> to ensure that there is no surcharge loading on the detention pipe. <br /> Revise the drainage report and resubmit for review during the construction permitting process. <br /> 22. Stotiuwater features, facilities, and conveyance serving the individual lots shall be private <br /> upstream of the detention facility.Roadway conveyance structures and the detention facility itself <br /> shall be public with an easement granted to the City of Everett for maintenance. <br /> 23. The driveways for lots 1 and 2 are required to be able to support and withstand the load of a vactor <br /> truck(100,0001bs). <br /> 24. In general, please call out all utilities and site features in accordance with the specific type and <br /> standard drawing number listed in the City's current Design and Construction Standards and <br /> Specifications for Development manual. A PDF version of this document can be found on our <br /> website: https://everettwa.gov/permits <br /> 25. Please clearly label all features as either existing or proposed and clearly show on the site plan <br /> using specific line types, hatch patterns, and a legend. <br /> 26. After receiving preliminary short plat approval,please submit 5 sets of civil plans with your public <br /> works permit application package along with 2 sets of drainage reports, SWPPP's and any <br /> additional reports. <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.