Laserfiche WebLink
• <br /> 2.1.5 Element 5: Stabilize Soils <br />• West of the Cascade Mountains Crest <br /> Season Dates Number of Days Soils Can <br /> be Left Exposed <br /> During the Dry Season May 1 —September 30 7 days <br /> During the Wet Season October 1 —April 30 2 days <br />• <br /> Soils must be stabilized at the end of the shift before a holiday or weekend if needed based on <br /> the weather forecast. <br />• Anticipated project dates: Start date: 05/2018 End date: 09/2018 <br /> Will you construct during the wet season? <br /> ❑ Yes® No <br />• <br /> List and describe BMPs: BMP C120— Hydroseeding <br /> BMP C121 — Mulching <br /> BMP C123— Plastic Covering <br /> Installation Schedules: <br /> Inspection and Maintenance plan: <br /> Responsible Staff: <br /> 2.1.6 Element 6: Protect Slopes <br /> Will steep slopes be present at the site during construction? <br /> ® Yes❑ No <br /> Steep slopes will be outside the clearing limits when not being graded. When graded, slopes will <br /> be protected with appropriate slope protection BMPs, such as mulching or nets and blankets, <br /> depending on site conditions during construction. <br />• <br /> List and describe BMPs: BMP C121 — Mulching <br /> BMP C122— Nets and Blankets <br /> Installation Schedules: <br />• <br /> Inspection and Maintenance plan: <br /> Responsible Staff: <br />• Page 18 <br />