Laserfiche WebLink
• <br /> 2.1.3 Element 3: Control Flow Rates <br /> Will you construct stormwater retention and/or detention facilities? <br />• <br /> ❑ Yes® No <br /> Will you use permanent infiltration ponds or other low impact development(example: rain <br /> gardens, bio-retention, porous pavement)to control flow during construction? <br /> ❑ Yes® No <br />• <br /> List and describe BMPs: BMP C200— Interceptor Dike and Swale <br /> BMP C207—Check Dams <br />• BMP C240—Sediment Trap <br /> Installation Schedules: <br /> Inspection and Maintenance plan: <br /> Responsible Staff: <br />• <br /> 2.1.4 Element 4: Install Sediment Controls <br /> All stormwater runoff from disturbed areas shall pass through an appropriate sediment <br /> removal BMP before leaving the construction site or prior to being discharged to an <br /> infiltration facility or public drainage system. <br /> In regard to this particular project, site runoff will be routed via interceptor swales with <br /> rock check dams to an on-site temporary sediment trap. The sediment traps are to be <br /> operable before major clearing and grading begins. Storm drainage inlets along 35th <br />• Street and any others within 500 feet downstream of the project will be protected with <br /> storm drain inlet protection. <br /> List and describe BMPs: BMP C200 — Interceptor Dike and Swale <br /> BMP C207— Check Dams <br />• <br /> BMP C208 —Triangular Silt Dike <br /> BMP C220—Storm Drain Inlet Protection <br /> BMP C233—Silt Fence <br />• <br /> BMP C240 —Sediment Trap <br /> BMP C251 —Construction Stormwater Filtration <br /> Installation Schedules: <br />• <br /> Inspection and Maintenance plan: <br /> Responsible Staff: <br />• Page 17 <br />