Laserfiche WebLink
PUBLIC WORKS <br /> MEMORANDUM <br /> TO: Jared VerHey,Navix Engineering, 360-790-2312 <br /> FROM: Sabrina Fandler, Engineering/Permit Services, 425-257-7813 <br /> DATE: 10/5/2017 <br /> SUBJECT: Plan Review Comments for Public Works Permit Application <br /> PROPOSAL: Site work for proposed building addition <br /> LOCATION: 2201 100th St SW <br /> PERMIT#: PW1709-033 <br /> A review of this project by the Engineering/Permit Services Division indicates that the following <br /> revisions should be made and/or the following conditions must be met: <br /> 1. Please see the compiled list of comments below and the attached redlines to revise your plans <br /> accordingly, prior to resubmitting to the Permit Services Counter. If you have any questions <br /> regarding the comments/redlines or need anything further, please directly contact this project's <br /> Public Works plans reviewer, Sabrina Fandler, at 425-257-7813 or SFandler@everettwa.gov. <br /> a. Please resubmit the following items to the Permit Services Counter with your <br /> resubmittal once all requested revisions have been made: <br /> i. Transmittal Sheet: (1) available online at https://everettwa.gov/Permits or at the <br /> Permit Counter-2nd Floor, 3200 Cedar Street. <br /> ii. Plans: (4) sets of revised plans plus original City Markups. <br /> iii. Drainage Report: (2) copies of revised drainage report. <br /> iv. Easement Form: (1) copy of easement form for water easement with legal <br /> description and exhibit attached for review. For an electronic version of this <br /> form, please email Sabrina at SFandler@everettwa.gov. Signing of this form <br /> must be notarized and can take place at the permit counter if needed, typically <br /> done at the time of permit issuance for convenience to the owner. See redlines as <br /> this may affect how easement is handled. <br /> v. Cost Estimate for Permit Fee Calculation Form: (1) copy of cost estimate form <br /> filled out for the City to use to calculate the Public Works Permit Fee. <br /> The Permit Counter is open Monday through Friday from 7:30am-12:OOpm and from <br /> 1:00pm-4:00pm (closed between 12:00pm-1:00pm for lunch). <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter. Likewise, comments below may not have <br /> associated redlines. Please indicate to the City that all redlines have been adequately <br /> addressed by providing checkmarks or notes next to the City's redlines to indicate that it <br /> agelof3 <br />