My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/03/02 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/03/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 5:03:06 PM
Creation date
3/3/2022 8:10:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />Portal 4 Improvements Design Tasks <br />Task 603 <br />Task 604 <br />Task 700 <br />Task 800 <br />Survey Services <br />Corrosion Condition Inspection <br />Services During Bidding and Construction <br />Unanticipated Services <br />Task 101 Project Management <br />Activities/Approach: Provide management, direction, coordination, and control of all project work, <br />and associated management of project scope, schedule, budget, sub -consultants (if any), technical <br />quality, and monthly progress reports and invoices. This task includes the following activities: <br />• Develop and submit a brief Project Management Plan (PMP), including project scope, budget <br />and schedule, and a preliminary project risk register. <br />• Develop and maintain a Field Work Safety Plan documenting potential field work hazards, <br />personal protection equipment, and emergency information. <br />• Conduct a virtual project kickoff meeting, including key consultant staff and Everett staff. <br />• Maintain the PMP including scope, schedule, and budget. <br />• Maintain the project risk register and action, issues and decision logs to aid in collaborative <br />decision making. <br />• Supervise project staff and manage Consultant team budget and schedule. <br />• Prepare monthly project status reports. Progress reports will identify budget status, progress <br />status, activities of the previous month, and up -coming activities. <br />• Prepare project change requests, if needed. <br />• Conduct bi-weekly calls between BC's Project Manager (PM) and the Everett's PM to review <br />project status, schedule, contract issues, and other project management related issues. <br />• Manage subconsultant work for geotechnical, surveying, and condition assessment services. <br />• Manage subconsultant contracts and invoicing. <br />• Support the City in organizing field investigations with subconsultant teams. <br />Everett Responsibilities <br />• Participate in the Project Kickoff Meeting. <br />• Review and provide consolidated comments on draft PMP. <br />• Review monthly status reports and supporting project documentation for invoice and payment <br />approval. <br />Task Assumptions <br />• The Kickoff Meeting will be scheduled for 2 hours, and be attended by 5 Consultant staff. <br />• PM meetings will be by phone, and will occur bi-weekly with a duration of approximately 30 <br />minutes. <br />• Task 101 includes mileage expense for all project workshops and meetings. <br />• The Field Work Safety Plan will follow Brown and Caldwell's standard template, and will direct <br />the design team to follow City of Everett procedures for WFP access. <br />Page 2 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.