Laserfiche WebLink
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />■ Replace/upgrade instrumentation (level elements/transmitters in channels). <br />Basis of Design and DOH Project Report <br />• Contact the Washington State Department of Health to refine expectations and schedule for <br />submittals to DOH for project approval. <br />• Develop a Basis of Design Report (BODR) that also meets the requirements of a project report <br />defined by the DOH Water System Design Manual (June 2020). The BODR will define the design <br />criteria for structural, process mechanical, building mechanical, electrical, and instrumentation <br />and controls disciplines. <br />• Conduct workshop with Plant Staff to review the basis of design for the Portal 4 improvements. <br />Everett Responsibilities <br />• Provide input on the recommended improvements. <br />• Review and provide comments on the BODR/DOH project report. <br />• Participate in site visit and workshop. <br />• Provide additional as -build drawings or plant records as necessary. <br />Task Assumptions <br />• Survey will not be required for this level of design. Electrical service improvements will be <br />sketched on Google Earth for conceptual level purposes. If it is decided to provide a new <br />electrical conduit to the Portal 4 building, possibly via a new route, this will require an <br />amendment to include survey. <br />• No new work will be completed under this task. Task 300 work was completed under <br />Amendment 1 prior to its execution. <br />• Development of the geotechnical and survey scopes of work beyond the material presented in <br />the BODR are the liability of BC and not carried out under this Portal 4 scope of work or budget. <br />Meetings <br />• One site visit to field verify site conditions. Assume conducted by 6 BC staff with a duration of 2 <br />hours on -site. <br />• Workshop listed above. Assume attended by 7 BC staff, with a duration of two hours (basis of <br />design workshop held on September 8th, 2021). <br />Work Products <br />• A draft and final BODR/DOH Project Report summarizing the design criteria and parameters for <br />the project (maximum 25 pages). <br />• Basis of design report Sections 2.2.2, 2.3.2, 3, and Appendix D and E. <br />Task 400 Preliminary and Intermediate Design <br />Activities/Approach: Develop design documents for improvements to Portal 4 based on the <br />recommendations from Tasks 200 and 300. Specific task activities include: <br />• Develop technical specifications. <br />• Coordinate technical specifications with City provided Division 0 and 1 specification. <br />• Develop design drawings. The anticipated list of drawings is to include the following sheets: <br />(1) Cover <br />(1) Sheet index <br />(1) Location map (close up from Plant to Portal 4 as well as wider view of plant location) <br />(1) General Legend <br />Page 5 of 13 <br />