My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/03/02 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/03/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 5:03:06 PM
Creation date
3/3/2022 8:10:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />• Participate in workshops. <br />• Supply relevant operations data, wholesale purveyor agreements, and control strategies. <br />Task Assumptions <br />• Recommendations will provide the basis for the control strategy and design of the control valves <br />in Portal 4. <br />• Recommendations will be developed through a review of supplied documents by others and BC's <br />ongoing work on the Finished Water Pump Station and through the associated workshops with <br />the City. No additional hydraulic modeling or numerical analysis will be needed. <br />Meetings <br />• North Corridor operations workshop. Assume attended by three BC staff, with a duration of two <br />hours, conducted via video conference. <br />• North Corridor recommendations workshop. Assume attended by three BC staff, with a duration <br />of two hours, conducted via video conference. <br />Work Products <br />• North Corridor Flow Controls Evaluation, Alternatives, and Recommendations technical <br />memorandum, draft and final. <br />Task 300 Basis of Design <br />Activities/Approach: BC will perform evaluations to finalize all major design decisions and provide <br />design criteria and equipment selections for the Portal 4 improvements. This information will be <br />presented in a Basis of Design Report. <br />Amendment 1 updates to Task 300 account for work completed under the basis of design phase for <br />additional project elements not accounted for in the original scope of work. This work includes the <br />installation of isolation valves and vaults on transmission lines 2, 3, and 4 and the addition of a <br />security fence around the Portal 4 structure as described in the BODR. The addition of valves and a <br />security fence also required development of draft scopes of work for survey and geotechnical <br />subconsultants which were presented as appendices in the BODR. This task encompasses work <br />completed by the process mechanical discipline, civil discipline, and design manager for the added <br />project elements at Portal 4. Specific task activities include: <br />• Conduct site visit to verify field conditions and interview Plant Staff to confirm scope of <br />improvements needed. <br />• Evaluate suitability of re -using existing 2" conduit and existing cable vs new conduit and/or <br />cable and review potential alternative route(s) for upgrading buried electrical service to Portal 4. <br />• The Portal 4 design package will include the following improvements: <br />■ Replace/repair corroded structural elements. Analyze structure for required repairs. <br />■ Remove rust stains. Evaluate coating options. <br />■ Replace door <br />■ Remove and seal off louver openings <br />■ Cover open channel and vent to atmosphere <br />■ Replace/upgrade electrical equipment <br />■ Improve electrical service to Portal. <br />■ Add mechanical ventilation system for the room and/or channels (assume no heating <br />required) <br />■ Install flow control valves with remote monitoring and operation. Evaluate condition and <br />capacity of existing valves, actuators, telemetry, and PLC system. <br />Page 4 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.