City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />• Work products will be electronic. <br />• Existing 2" conduit and cable providing power from the WFP to Portal 4 can be reused and does <br />not require replacement. <br />• Amendment 1 budget includes reapportionment of preliminary design fees previously shifted to <br />surveying services Task 603 by the budget reallocation dated December 3, 2021. <br />• The Amendment 1 budget includes reapportionment of intermediate design fees previously <br />shifted to geotechnical services Task 601 by the December 3, 2021 budget reallocation. <br />• Electrical cable cost estimating assumes in -kind replacement of the existing single phase cable <br />and use of the existing buried conduit. <br />Meetings <br />• Design comment review call. Assume attended by five BC staff, with a duration of two hours, <br />one each at preliminary (30%) and intermediate design (60%) stages. <br />• Site visit during design as needed. Assume attended by two BC staff, with a duration of two <br />hours on site. <br />Work Products <br />• Preliminary Design (30%) <br />• Intermediate Design (60%) <br />• CAD files of intermediate designs. <br />• ACEI Class 5 construction estimate. <br />Task 450 Isolation Valves, Security Fence, and Cable Replacement Preliminary and Intermediate <br />Design <br />Activities/Approach: This task covers work to be completed by civil and process mechanical <br />disciplines for the preliminary and intermediate design of isolation valves and vaults on transmission <br />lines 2, 3, and 4, the Portal 4 security fence, and in -kind replacement of the single phase power <br />cable servicing Portal 4. This work is a continuation of conceptual design presented in the BODR <br />completed under Task 300 and mirrors preliminary and intermediate design activities of Task 400. <br />Task Assumptions <br />• BC will carry out preliminary and intermediate design of the isolation valves, the security fence, <br />and cable replacement in parallel with the intermediate design phase of the other project <br />elements. <br />• Upon completion of Task 450, intermediate design documents for the isolation valves, vaults, <br />security fence, and cable replacement will be integrated into the core intermediate design for <br />delivery to the City as a single package. <br />• No preliminary design documents for the transmission line valves, vaults, security fence, and <br />cable replacment will be developed. <br />• Dewatering and shoring design will be responsibility of contractor. <br />• Valve vaults will not require design of deep foundations. Additional design budget will be <br />necessary if deep foundations are required. <br />• Electrical cable design assumes in -kind replacement of the existing single phase cable. The new <br />cable will be installed in the existing buried 2-inch diameter conduit. <br />• BC assumes the electrical cable routing and access points presented in the March 2003 Portal <br />4 Modifications as -built drawing sheet E105A are accurate and will serve as a reference for the <br />cable replacement design. <br />Page 7 of 13 <br />