My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/03/02 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/03/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 5:03:06 PM
Creation date
3/3/2022 8:10:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />• Design drawings will be prepared in 2D AutoCAD using existing CAD files as backgrounds and <br />follow City of Everett CAD standards. <br />• Technical specifications will be prepared in Division 50 CSI master format. <br />• Work products will be electronic. <br />Everett Responsibilities <br />• Review and provide comment on intermediate design documents. <br />Meetings <br />• No meetings additional to task 400 are anticipated for this task. <br />Work Products <br />• Intermediate design documents for transmission line isolation valves and security fence. BC <br />anticipates the addition of the following documents to the core design package: <br />O 7 Civil sheets <br />O 1 process mechanical sheet <br />o Specifications associated with these design elements <br />Task 500 Detailed Design <br />Activities/Approach: BC will prepare detailed design documents for bidding. Engineering design and <br />analyses performed under this task include the design elements described under Tasks 300, 400, <br />and 450. <br />• Develop final (90%) and bid set (100%) design documents including drawings and specifications. <br />• Develop project cost estimates at final design (90%). <br />Everett Responsibilities <br />• Review and provide comment on final design documents. <br />• Review and comment on cost estimate and make any value engineering decisions prior to <br />proceeding from 90% to 100% design. <br />• Provide site access, staffing, and resources to support field work as necessary. <br />Task Assumptions <br />• The final design stage includes all project elements described in Tasks 300, 400, and 450 <br />including the Portal 4 building improvements, valve actuators, transmission line isolation valves, <br />vaults, electrical cable replacement, and security fence. <br />• Final design efforts will include development of specifications detailing plans for Portal 4 power <br />outages that may be necessary during electrical cable replacement. <br />• Target delivery of bid documents (100%) by mid -March 2022. <br />• Work products will be in electronic format. <br />• BC will attend one review workshop after City review of the final (90%) design documents. <br />• Final design cost estimate will be completed using new funds allocated to the existing cost <br />estimating task under preliminary/intermediate design Phase 400. <br />• Project cost estimate will be an AACEI Class 1 Construction Cost Estimate (+15%/-10%) based <br />on the final design (90%) documents. <br />• Construction cost estimates are subject to many influences including real time price of local <br />labor and materials, unknown or latent conditions, of existing equipment and structures, and <br />time or quality of performance by the contractor, vendors, and by third parties to the <br />construction contract. Such influences may not be precisely forecasted and are beyond the <br />Page 8 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.