My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/03/02 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/03/02 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 5:03:06 PM
Creation date
3/3/2022 8:10:10 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
3/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />control of Consultant. Actual bids received and costs incurred may vary from the estimate ranges <br />prepared by Consultant. All estimates are expressly implied to have 90 to 95% confidence limits. <br />• Task includes a contingency for a third party review of the geotechnical reports (Earth <br />Mechanics). <br />Meetings <br />• Final design (90%) review workshop. Assume workshop will be attended by six BC staff for a <br />duration of two hours. <br />• Assume three site visits attended by two BC staff for a duration of four hours on site. <br />Work Products <br />• This task includes development of final (90%) and bid (100%) design documents. The design <br />plan set will include approximately 34 drawings including general sheets, notes, symbols and <br />legends, and specifications. <br />• The Issue for Bid deliverable will contain all drawings and specifications required for bidding. The <br />Issue for Bid package will be stamped/sealed and digitally signed. Issue for Bid Documents will <br />be provided in electronic format for full-size and half-size document production. <br />• CAD files of final designs. <br />• AACEI Class 1 construction cost estimate. <br />Task 601 Geotechnical Services <br />Activities/Approach: Provide geotechnical services in support of the design of the new valve vaults <br />and vaults and to assess condition of the slope above the Portal 4 structure. The following section <br />summarizes the geotechnical scope of work. A full description of the geotechnical services is <br />included as Attachment A. <br />• Review existing geotechnical reports and data for the project area. <br />• Explore and classify the subsurface soil conditions within the vicinity of the proposed valve and <br />vault installation locations. <br />• Investigate the slide on the hill side southeast of the Portal 4 structural to inform mitigation. This <br />investigation will provide information for general site and/or slope stability modifications. <br />• Develop geotechnical engineering recommendations for design and construction of the new <br />valve and vault locations, including: <br />o Construction dewatering <br />o Temporary excavation slopes/support <br />o Vault foundations <br />o Groundwater elevations <br />o Structural fill <br />o Seismic considerations <br />• Two(2) geotechnical borings (40 feet deep) at the location of the valve/vaults and one (1) <br />geotechnical boring (60-80 feet deep) near the slide on the hill side southeast of the Portal 4 <br />structure. <br />Everett Responsibilities <br />• Provide site access, staffing, and resources to support field work conducted by geotechnical <br />crews. <br />Task Assumptions <br />• Geotechnical investigations require two site visits for utility locates prior to the field explorations. <br />Page 9 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.