Laserfiche WebLink
City of Everett Water Treatment Plant Portal 4 Improvements I Scope of Work <br />• Native material acceptance test results. <br />• Proctor tests for all materials to be compacted. <br />Task 603 Surveying Services <br />Activities/Approach: Provide surveying services in support of the Portal 4 Improvements design. <br />Survey area 1 encompasses the new valve/vault area at the bottom of the slope out to the tree line. <br />Survey area 2 encompasses the area around the Portal 4 structure up to the hillside and to the top <br />of the slope. This section summarizes the work to be completed under Task 602. Attachment B <br />presents the full scope of work for these services. <br />• Perform topographic field survey <br />• Provide topographic map of the Portal 4 area within survey areas 1 and 2. This task includes <br />locating and identifying existing utilities, improvements, man-made features, roadways, <br />boundaries, critical elevations, existing structures, natural features, and grades within the limits <br />of work. The field survey shall include enough detail to produce a base map with boundary <br />information, contours, and other topographic information. <br />• Establish horizontal and vertical control points based on the project's control system and <br />information for contract documents including survey points, a basis of bearing, benchmarks for <br />vertical control, and datum information for development of base mapping. <br />• Provide pothole surveys to located buried transmission lines 2, 3, 4, and the 36-inch diameter <br />waste line. <br />• Provide an equation to convert elevations from the 1988 NAVD and the 1929 NGVD datums for <br />the site to allow for conversion of elevation callouts from older drawing sets. <br />Everett Responsibilities <br />• Provide the necessary staffing and resources to support field work conducted by survey crews. <br />• Provide all available ROW, utility records, and GIS files one (1) week prior to field work. <br />Task Assumptions <br />• The survey information will be prepared under the direction of a registered professional land <br />surveyor. <br />• Survey will provide NAD-1983 for northing (y) and easting (x) horizontal reference. <br />• Survey will provide NAVD-1988 for vertical references based on project requirements tied to <br />local county benchmarks. <br />• Work products will be provided in a digital format. <br />• Surveying subconsultant will have access to the site as necessary to complete work. <br />• Amendment 1 budget includes surveying fees not covered by the December 3, 2021, budget <br />reallocations. <br />Meetings <br />• Two site visits by surveying subconsultant. <br />Work Products <br />• Surveyor to provide electronic drawing files with surveyor's sign and seal. Electronic deliverables <br />to include 2D basemap and 3D surface DRM of Portal 4 site. <br />Task 604 Corrosion Condition Inspection <br />Activities/Approach: Provide condition inspection services to investigate the corroded steel members <br />located in the Portal 4 channel. The following subconsultant services will be provided by Corrosion <br />Probe Incorporated (CPI). Attachment C presents these full scope of services. <br />Page 11 of 13 <br />