Laserfiche WebLink
0 <br />0 <br />James Bronder <br />ne18 2019 <br />` age'' ,2 <br />A501 DETAILS <br />1. Combined 11/A501 and 12/A501 into one detail marked 11/A501. Added trench drain <br />under ovens to reflect floor plans. Revised ceiling and sign fascia to be prefabricated <br />metal insulated panels. <br />2. Replaced detail 16/A501. The loading dock curb was redundant because it is detailed on <br />structural. New detail shows service and maintenance access door from compressor <br />room catwalk to void space above Meat Prep. <br />S1.1 GENERAL NOTES, PARTIAL FOUNDATION PLAN, AND SECTIONS <br />1. Revised PARTIAL FOUNDATION PLAN to coordinate with prefabricated compressor <br />room. <br />2. Added detail 1A SECTION, through compressor room foundation at metal stairs. <br />S1.3 CATWALK FRAMING <br />1. Revised CATWALK FRAMING PLAN to coordinate with prefabricated compressor room. <br />2. Revised detail 2 SECTION to clarify relationships of compressor room, catwalk, and <br />existing building wall. <br />3. Added detail 8 STRONGBACK ELEVATION for access opening from compressor room <br />catwalk to void space above Meat Prep. <br />M101 ROTISSERIE HVAC PLANS <br />1. Added exhaust fans and intakes to Compressor Room, Deli Prep, and Meat Prep. <br />Relocated register and added duct at Rotisserie Prep exhaust fan. <br />M104 KITCHEN HOOD DETAILS <br />1. Added sheet with 1/M104 MEAT PREP EXHAUST FAN DETAIL AND 2/M104 DELI <br />PREP EXHAUST FAN DETAIL. <br />P100 DWV PLANS <br />1. Added water heater schedule and piping diagram. <br />2. Revised floor sink for EVAC drain. <br />3. Added trench drains at Meat Prep and Deli Prep. <br />P101 DOMESTIC WATER AND GAS PLANS <br />1. Added foam cleaning system at Deli Prep. <br />2. Revised water heater at 2/P101 DOMESTIC WATER AND GAS REMODEL PLAN. <br />3. Added floor sink FS-3 at PLUMBING FIXTURE SCHEDULE. <br />4. Revised detail 4/P101 HAND SINK DETAIL. <br />E001 ELECTRICAL PANEL SCHEDULES AND ONE -LINE DIAGRAM <br />1. Revised ONE -LINE DIAGRAM and added pull boxes to accommodate construction <br />phasing and panel relocations. <br />E002 ELECTRICAL PANEL SCHEDULES AND ONE -LINE DIAGRAM <br />1. Revised panel schedules to accommodate construction phasing. <br />