My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 2/15/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Dept of Ecology 2/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
3/4/2022 11:16:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
2/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
John Rabenow
Subject / Project Title
Nutrient General Program Discharge Permit
Tracking Number
0003215
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LIST OF TABLES <br /> Table 1. Summary of Permit Report Submittals 5 <br /> Table 2. Summary of Required On-Site Documentation 6 <br /> Table 3. List of Domestic WWTPs Discharging to Puget Sound 7 <br /> Table 4. Narrative Effluent Limitations for Dominant TIN Loaders 12 <br /> Table 5. Dominant WWTPs and Total Inorganic Nitrogen Action Levels 12 <br /> Table 6. Bubbled Action Levels for Corrective Action Assessment 13 <br /> Table 7. Narrative Effluent Limitations for Moderate TIN Loaders 19 <br /> Table 8. Moderate WWTPs and Total Inorganic Nitrogen Action Levels 19 <br /> Table 9. Bubbled Action Levels for Corrective Action Assessment 20 <br /> Table 10. Narrative Effluent Limitations for WWTPs with Small TIN Loads 26 <br /> Table 11. Permittees with Small TIN Loads 27 <br /> Table 12. Influent Sampling Requirements for S4 Permittees 32 <br /> Table 13. Effluent Sampling Requirements for S4 Permittees 33 <br /> Table 14. Footnotes for Influent and Effluent Monitoring Tables 12 and 13 34 <br /> Table 15. Influent Sampling Requirements for S5 Permittees 35 <br /> Table 16. Effluent Sampling Requirements for S5 Permittees 36 <br /> Table 17. Footnotes for Influent and Effluent Monitoring Tables 15 and 16 37 <br /> Table 18. Influent Sampling Requirements for S6 Permittees 38 <br /> Table 19. Effluent Sampling Requirements for S6 Permittees 39 <br /> Table 20. Footnotes for Influent and Effluent Monitoring Tables 18 and 19 40 <br /> Puget Sound Nutrient General Permit Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.