My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Dept of Ecology 2/15/2022
>
Contracts
>
Agreement
>
Interlocal Agreements
>
WA ST Dept of Ecology 2/15/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:18 AM
Creation date
3/4/2022 11:16:11 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Dept of Ecology
Approval Date
2/15/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
John Rabenow
Subject / Project Title
Nutrient General Program Discharge Permit
Tracking Number
0003215
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF PERMIT REPORT SUBMITTALS <br /> Refer to the Special and General Conditions within this permit for additional submittal <br /> requirements. Appendix A provides a list of definitions. Appendix B provides a list of acronyms. <br /> Table 1. Summary of Permit Report Submittals <br /> Permit Submittal Frequency First Submittal Date <br /> Section <br /> For new Permittees: No <br /> Permit Application (Notice of later than 90 days <br /> S2.A.1 Intent) Once following permit <br /> issuance <br /> S4.0 Nitrogen Optimization Report for Annually March 31, 2023 <br /> Dominant Loaders <br /> S4.D Corrective Action Engineering As necessary <br /> Report <br /> S4.E Nutrient Reduction Evaluation for 1/permit cycle December 31, 2025 <br /> Dominant Loaders <br /> S5.0 Nitrogen Optimization Report for Annually March 31, 2023 <br /> Moderate Loaders <br /> S5.D Corrective Action Engineering As necessary <br /> Report <br /> Nutrient Reduction Evaluation for <br /> S5.E Moderate Loaders 1/permit cycle December 31, 2025 <br /> S6.B Nitrogen Optimization Report for 1/permit cycle March 31, 2026 <br /> Small Loaders <br /> AKART Evaluation for Small <br /> S5.D Loaders 1/permit cycle December 31, 2025 <br /> Discharge Monitoring Reports Within 15 days of <br /> S9.A (DMRs) Monthly applicable monitoring <br /> period <br /> G2 Notice of Change in Authorization As necessary As necessary <br /> G7 Application for Permit Renewal 1/permit cycle No later than 180 days <br /> before expiration <br /> G20 Reporting Anticipated Non As necessary As necessary <br /> Compliance <br /> Puget Sound Nutrient General Permit Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.