My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 3/9/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
Brown and Caldwell Inc. 3/9/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 1:40:08 PM
Creation date
3/18/2022 1:38:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
3/9/2022
Council Approval Date
3/2/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002939
Total Compensation
$413,614.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell Inc. 6/1/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portal 4 Improvements <br /> Surveying Services Scope of Work <br /> Assumptions <br /> • Topographic surface will be generated by survey spot elevations and 3D breaklines. <br /> • Right-of-Way (ROW) plans and parcel maps/legal descriptions are not scoped; if needed, they <br /> can be added later through an amendment. <br /> • Right-of-Entries (ROE) will be provided by City of Everett for private properties/structures. <br /> • Trees 4 inches in diameter and above will be surveyed along perimeter edge of survey area 1 <br /> and survey area 2 and those within the boundary.Trees will be labeled with trunk and dripline <br /> diameter and will only be classified as coniferous or deciduous as far as the tree species unless <br /> directed otherwise. <br /> • The City of Everett will provide all available ROW, utility records, and GIS files one (1) week prior <br /> to field work. <br /> • No pipe probes are included within this scope. <br /> 5. CAD Standards for Deliverables <br /> Electronic CAD files shall be prepared in AutoCAD Civil 3D 2019 format per the National Cad Standards <br /> (NCS) drafting standards and CAD guidelines. No elements shall be created or placed on layer zero. <br /> Drawings Borders,Title blocks and CTB files(s)for plotted drawings, pdfs, etc. shall be provided by the <br /> City. <br /> Field Codes, code blocks and associated layering shall be provided by the City. <br /> 6. Base Map Requirements <br /> A. Base map (electronic or hardcopy) shall: <br /> 1. Be provided at a scale of 1" = 20' (or other as necessary) plotted on a full size (22" x 34") <br /> drawing. Multiple drawings with a key map for large or long sites shall be provided as required. <br /> 2. Be provided in the CAD Software and drafting standards and CAD guidelines listed above.All <br /> layering shall follow the standard layering system. <br /> 3. The base map(s)shall have two foot contours with each even contour identified. Contours <br /> should be drawn as AutoCAD 3D contours or polylines with the elevation of the polyline set to <br /> the contour elevation in feet. Where not specified, use different line weights and/or screening <br /> levels to differentiate between index and intermediate contours. <br /> 4. Be oriented with either true north or plan north, up. Plan north may be used when the angle <br /> between plan north and true north is greater than 30 degrees different. Provide north arrow for <br /> true north and for plan north (when used). <br /> 5. Provide all annotation and labels shall be on separate layers from the line work and features <br /> they are associated with. All text shall be oriented so that it is not inverted when read from the <br /> bottom or right side of the plot. Spot elevations text shall be oriented up and to the right. <br /> B. Provide an AutoCAD Civil 3D 2019 surface file or the TIN file used to generate contours. The TIN <br /> shall include break lines across features such as curbs, drainage channels and banks and the <br /> edges of features that have sharp vertical or near-vertical drops such as walls. All other line work <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.