My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 3/9/2022 Amendment 1
>
Contracts
>
6 Years Then Destroy
>
2023
>
Brown and Caldwell Inc. 3/9/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2022 1:40:08 PM
Creation date
3/18/2022 1:38:52 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
3/9/2022
Council Approval Date
3/2/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Water Filter Plant Portal 4 Improvements
Public Works WO Number
WO3755
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002939
Total Compensation
$413,614.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Brown and Caldwell Inc. 6/1/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Portal 4 Improvements <br /> Surveying Services Scope of Work <br /> may be drawn at elevation 0.0, so long as the supporting point plot data indicates the surveyed <br /> elevation. <br /> 1. Base mapping shall be provided and include a survey point file in electronic ASCII format, <br /> comma delineated with all data points (PNEZD),field code/description) used to develop the <br /> mapping. <br /> 2. CTB file(s) used to create full-size and half-size plots of the topo/base map. <br /> C. Provide two electronic drawing(.dwg)files with surveyor's sign and seal that contain the following: <br /> 1. 2D basemap containing all 2D elements including ROW calculations that will be flattened to <br /> zero elevation. <br /> 2. 3D surface DTM containing all breaklines and points to create site contours at 1' intervals. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.