Laserfiche WebLink
0 0 <br />Mr. Ismail Mohammad <br />Plan Check Number: B2004-028, Second Building Review <br />September 11, 2020 <br />17. The original comment stated that the roof framing, including the size and spacing of members, <br />should be shown in the plans. The response stated that attic -level modifications have been <br />removed from the project. The roof framing layout should still be shown. See Section <br />R106.1.1. <br />19. Continuing with Comment 17, the existing framing for the Main and Attic floors should be <br />specified, including but not limited to the size and spacing. The locations, spans, and sizes of <br />all beams, headers, posts, and wall framing should be specified. See Section R106.1.1. <br />This review has been performed for general compliance with the building codes as adopted and <br />amended by the state of Washington and the city of Everett. Corrections and comments made <br />during the review process do not relieve the project from compliance with code and permit <br />requirements. The designers -of -record are responsible for a complete design in accordance with <br />the laws of the state of Washington. <br />If you have any questions or require additional clarification, please contact us. <br />Respectfully, <br />Drew Martin, P.E., S.E. <br />Associate Engineer / Commercial Plans Examiner <br />(425)257-8813 <br />dmartin@everettwa.gov <br />0 3200 Cedar Street © 425.257.8810 O everetteps@everettwa.gov <br />Everett, WA 98201 425.257.8857 fax everettwa.gov/p <br />Page 3 of 3 <br />